Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
December 2017 but Blackpool bit will be spring 2018.

Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?
 
Joined
8 Aug 2014
Messages
77
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?

Preston to Blackpool North is closed November 2017 to April 2018 for a shed lot of stuff to happen.

Yes, there will be diesels running to Blackpool, but they will be of the rubber tyred variety!!!
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
There are four new masts up on the Down side south of Horwich Parkway (as of 1630 on the 19th October)

Where do I collect my prize?


:lol::lol: So they were the ones waiting in the compound i saw :D, musta gone in Evening of the 18th :lol: im going to nip down at weekend get some pics cant make it before then
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?

I was told by a Northern driver that the current Blackpool -Victoria (Huddersfield) services will transfer to 319s when Chorley gets wired, and become Victoria-Lancaster services, with a Blackpool-Preston shuttle.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I was told by a Northern driver that the current Blackpool -Victoria (Huddersfield) services will transfer to 319s when Chorley gets wired, and become Victoria-Lancaster services, with a Blackpool-Preston shuttle.

That would be a useful service.
I wonder when the penny will drop and they decide to wire the "last mile" into Morecambe?
The local DMU shuttle from Lancaster must be an expensive outpost.
It's at least as useful as Oxenholme-Windermere.
 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
I noticed last night that some satellite images in Google Earth were updated in June this year. One of those covers the line from just South of Horwich to just South of Chorley. Unless my eyes are deceiving me mast bases are clearly visible
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I noticed last night that some satellite images in Google Earth were updated in June this year. One of those covers the line from just South of Horwich to just South of Chorley. Unless my eyes are deceiving me mast bases are clearly visible

That stretch is probably about 60% based (either older concrete or newer piles).
5 masts have been up south of Adlington since last Christmas, and now the new ones near Horwich.
Our problem is the complete dearth of bases on the 11 miles from west of Lostock to Agecroft through Bolton.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?

I think all Southport services are likely to run via Atherton from Dec 2017. Then when Lostock Junction to Wigan is eventually electrified all services to Wigan via Bolton will become electric and terminate at Wigan North Western.

But there will still be diesel trains from Manchester to Blackburn and Clitheroe via Bolton.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,607
Location
Nottingham
That would be a useful service.
I wonder when the penny will drop and they decide to wire the "last mile" into Morecambe?
The local DMU shuttle from Lancaster must be an expensive outpost.
It's at least as useful as Oxenholme-Windermere.

There will still be DMUs at Lancaster on Furness and Leeds trains, so it may not be too difficult to resource the Morcambe trains from those resources.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Surely there needs to be some sort of service between Bolton and Wigan, though?

Yes, the franchise requirement is for 2tph from Manchester to Wigan via Bolton and 4tph via Atherton. 2tph must continue to Southport and 1tph to Kirkby. If both Southport services, the Kirkby and a Wallgate terminator all run via Atherton, both Bolton services can terminate at North Western, ready for electrification.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Over the last few weeks has seen the start of midweek blockages of the Blackpool - Preston route, with late night and early morning trains replaced by buses. Yet there doesn't seem to be anything that has changed. No Pway relaying (like there has been Bolton to Preston), or site compound construction, no visible surveying, no land clearance. Anyone know what exact work is currently taking place overnight? As far as I can recall in 2012/2013 there was a massive surveying schedule undertaken, as well as the bridge replacement. The only current bridge being rebuilt is Plymouth Road at Layton, and it doesn't need full midweek closures. The others had two or three weekend closures to remove and replace the bridge decks.

I'm not expecting the track layout to be changed, nor mast bases to appear, but again it seems to be the repeat of the Bolton line. Massive engineering time with little to be seen, resulting in requiring more possessions later on.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,810
Location
Liverpool, UK
Perhaps you should go out between 0000 and 0600 to see what the orange man are up to.

I know that when they wired Edge Hill to Earlestown/Springs Branch we had a similar situation, and then suddenly mast bases appeared all over the place.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
The first signs are usually "digs" or trial holes at future mast sites.
Usually a peg will mark the spot.
The resignalling will need a lot of lineside work too, before the full blockade. Although that usually happens during the day and doesn't involve line closures.
There are still lots of bases to go in on the Bolton line though.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Over the last few weeks has seen the start of midweek blockages of the Blackpool - Preston route, with late night and early morning trains replaced by buses. Yet there doesn't seem to be anything that has changed.

Well as well as being home xmas- new year from the USA when LDECRexile aka Dave and I plan a day long car bash in the area , I am also home at Thanksgiving. I know all the country roads and farmers fields in the area to Kikham so will have good shufty then and report back. Dave and I will also do the same at xmas.
 
Last edited:

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
Yes, the franchise requirement is for 2tph from Manchester to Wigan via Bolton and 4tph via Atherton. 2tph must continue to Southport and 1tph to Kirkby. If both Southport services, the Kirkby and a Wallgate terminator all run via Atherton, both Bolton services can terminate at North Western, ready for electrification.

Although this service pattern will bring about some unpopular changes to journey opportunities it seems highly likely that it is what will happen. The loss of through trains from Southport to both Bolton and Oxford Rd/Piccadilly will be especially unwelcome.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Yippee!

First, the good news:

Wrinkley gets the bonus point for first photos, beating ALX400 by a short head.

Now the bad news, there has been a points failure, so his award will be delayed. LDECRexile Services regrets this delay to your journey.

In the meantime their efforts look pretty darned good.

I've added ALX's shots to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157651121057352

and added Wrinkley's to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157654034635234

I've added them all to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Great stuff, contractors and photographers. Thank you.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
Originally Posted by Greybeard33 View Post
Yes, the franchise requirement is for 2tph from Manchester to Wigan via Bolton and 4tph via Atherton. 2tph must continue to Southport and 1tph to Kirkby. If both Southport services, the Kirkby and a Wallgate terminator all run via Atherton, both Bolton services can terminate at North Western, ready for electrification.

Although this service pattern will bring about some unpopular changes to journey opportunities it seems highly likely that it is what will happen. The loss of through trains from Southport to both Bolton and Oxford Rd/Piccadilly will be especially unwelcome.

Don't Wiganers now have the opportunity of electric trains to Victoria and Piccadilly without going via Atherton or Bolton? If so, won't that cover any losses? Anyhow, to me it would make sense to run diesels Southport-Wigan-Atherton-Manchester and pax could change at Wigan for Bolton, although onto an electric they would have to cross the road I suppose.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
Don't Wiganers now have the opportunity of electric trains to Victoria and Piccadilly without going via Atherton or Bolton? If so, won't that cover any losses? Anyhow, to me it would make sense to run diesels Southport-Wigan-Atherton-Manchester and pax could change at Wigan for Bolton, although onto an electric they would have to cross the road I suppose.

True. But. There are plenty who commute from stations between Wigan and Southport to Bolton or Oxford Rd/Piccadilly who will be particularly unimpressed, especially those beyond Appley Bridge who don't benefit from TfGM pricing and whose journeys will be much less convenient. If timetables work then a simple change at Hindley for Bolton may not be so bad though Hindley could do with better waiting facilities on the platforms. But for Oxford Rd/Piccadilly it will almost certainly mean changing at Salford Crescent onto trains which will probably be already full. And it also seems likely that the overall frequency between Bolton/Salford Crescent and Oxford Rd/Piccadilly will be reduced to enable the pathing of all the Ordsall chord services. If only a flyover had been put in at Ordsall Lane!

On the other hand if the electric service from Wigan North Western via Bolton went across the city, perhaps all going to Hazel Grove, the reduction in convenience may be mitigated. Given that there will still be trains from the Chorley line going to Manchester Airport it would appear such a routeing choice might enable the maximum number of existing links to be maintained.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Don't Wiganers now have the opportunity of electric trains to Victoria and Piccadilly without going via Atherton or Bolton? If so, won't that cover any losses? Anyhow, to me it would make sense to run diesels Southport-Wigan-Atherton-Manchester and pax could change at Wigan for Bolton, although onto an electric they would have to cross the road I suppose.

Theres to be an electric fast service from North Western to the Airport replacing the Scotland service yes.

Whats upsetting people of Southport and west of Wigan stations though (and this is leafy middle class commuter territory which is why the various MP's are answering the call) is the loss of their hourly direct service to Oxford Road/Piccadilly/Airport, all their service will now go to Victoria meaning for commuters a change of train is required to access the south and east of the city centre.

To complicate things even further Merseytravel and Lancashire CC have an aspiration of services from Kirkby/Skelmersdale or bi-modal from Liverpool itself going to the Airport as well. Quite possibly HS3/NPR forming a fourth line may free up capacity between Liverpool and Manchester to allow that to happen.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Now for the numbers.
There are 12 masts between Lostock and Horwich on the Down, 11 on the Up.
They don't have registration gear, but some have autotensioners and most have the top insulator for the AT feed.

On the base front, there are about 6 new piles on the Up at Agecroft.
Also trial holes and pegs on a stretch west of Bolton.

Chorley P1 looks virtually finished, with just some paving, fencing and lighting work going on.

Fylde Line
Definite signs of electrification work having started.
For about 3 miles out of Preston there are many mast locations prepared.
They are marked with a blue cap, with the mast number painted on the concrete cable troughing nearby.
 
Last edited:

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,903
Location
North
Well as well as being home xmas- new year from the USA when LDECRexile aka Dave and I plan a day long car bash in the area , I am also home at Thanksgiving. I know all the country roads and farmers fields in the area to Kikham so will have good shufty then and report back. Dave and I will also do the same at xmas.

Snow drifts permitting!
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
True. But. There are plenty who commute from stations between Wigan and Southport to Bolton or Oxford Rd/Piccadilly who will be particularly unimpressed, especially those beyond Appley Bridge who don't benefit from TfGM pricing and whose journeys will be much less convenient. If timetables work then a simple change at Hindley for Bolton may not be so bad though Hindley could do with better waiting facilities on the platforms. But for Oxford Rd/Piccadilly it will almost certainly mean changing at Salford Crescent onto trains which will probably be already full. And it also seems likely that the overall frequency between Bolton/Salford Crescent and Oxford Rd/Piccadilly will be reduced to enable the pathing of all the Ordsall chord services. If only a flyover had been put in at Ordsall Lane!

On the other hand if the electric service from Wigan North Western via Bolton went across the city, perhaps all going to Hazel Grove, the reduction in convenience may be mitigated. Given that there will still be trains from the Chorley line going to Manchester Airport it would appear such a routeing choice might enable the maximum number of existing links to be maintained.

Bolton will not lose frequency to Oxford Road/Piccadilly because it is to have 2tph to Hazel Grove, as well as the Blackpool to Airport service. I do not think it has been announced yet whether the second Hazel Grove service will be from Preston/Blackpool or be one of the Wigans. The other two Northern electric services from Bolton will probably go to Stalybridge via Salford Central and Victoria.

The TPE Glasgow/Edinburgh to Airport service will also stop at Bolton, but will probably be set down/pick up only at busy times.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I think the other Bolton electric service will terminate at Bolton in the reinstated platform, possibly extended to Wigan when the Wigan-Bolton electrification is done.
 