What's the latest on completion date? Was supposed to be December this year, but that went ages ago.
December 2017 but Blackpool bit will be spring 2018.
What's the latest on completion date? Was supposed to be December this year, but that went ages ago.
December 2017 but Blackpool bit will be spring 2018.
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?
There are four new masts up on the Down side south of Horwich Parkway (as of 1630 on the 19th October)
Where do I collect my prize?
There are four new masts up on the Down side south of Horwich Parkway (as of 1630 on the 19th October)
Where do I collect my prize?
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?
I was told by a Northern driver that the current Blackpool -Victoria (Huddersfield) services will transfer to 319s when Chorley gets wired, and become Victoria-Lancaster services, with a Blackpool-Preston shuttle.
I noticed last night that some satellite images in Google Earth were updated in June this year. One of those covers the line from just South of Horwich to just South of Chorley. Unless my eyes are deceiving me mast bases are clearly visible
Ta. That suggests to me trains going through Bolton will terminate at Preston, or continue northwards, with diesels running to Blackpool and Southport?
That would be a useful service.
I wonder when the penny will drop and they decide to wire the "last mile" into Morecambe?
The local DMU shuttle from Lancaster must be an expensive outpost.
It's at least as useful as Oxenholme-Windermere.
Surely there needs to be some sort of service between Bolton and Wigan, though?I think all Southport services are likely to run via Atherton from Dec 2017.
Surely there needs to be some sort of service between Bolton and Wigan, though?
Almost two dozen masts up between Lostock and Horwich, staggered and clustered. Was a fantastic sight!
Over the last few weeks has seen the start of midweek blockages of the Blackpool - Preston route, with late night and early morning trains replaced by buses. Yet there doesn't seem to be anything that has changed.
Yes, the franchise requirement is for 2tph from Manchester to Wigan via Bolton and 4tph via Atherton. 2tph must continue to Southport and 1tph to Kirkby. If both Southport services, the Kirkby and a Wallgate terminator all run via Atherton, both Bolton services can terminate at North Western, ready for electrification.
Originally Posted by Greybeard33 View Post
Yes, the franchise requirement is for 2tph from Manchester to Wigan via Bolton and 4tph via Atherton. 2tph must continue to Southport and 1tph to Kirkby. If both Southport services, the Kirkby and a Wallgate terminator all run via Atherton, both Bolton services can terminate at North Western, ready for electrification.
Although this service pattern will bring about some unpopular changes to journey opportunities it seems highly likely that it is what will happen. The loss of through trains from Southport to both Bolton and Oxford Rd/Piccadilly will be especially unwelcome.
Nevertheless it's a signal achievement.Now the bad news, there has been a points failure, so his award will be delayed.
Don't Wiganers now have the opportunity of electric trains to Victoria and Piccadilly without going via Atherton or Bolton? If so, won't that cover any losses? Anyhow, to me it would make sense to run diesels Southport-Wigan-Atherton-Manchester and pax could change at Wigan for Bolton, although onto an electric they would have to cross the road I suppose.
Don't Wiganers now have the opportunity of electric trains to Victoria and Piccadilly without going via Atherton or Bolton? If so, won't that cover any losses? Anyhow, to me it would make sense to run diesels Southport-Wigan-Atherton-Manchester and pax could change at Wigan for Bolton, although onto an electric they would have to cross the road I suppose.
Chorley P1 looks virtually finished, with just some paving, fencing and lighting work going on.
Well as well as being home xmas- new year from the USA when LDECRexile aka Dave and I plan a day long car bash in the area , I am also home at Thanksgiving. I know all the country roads and farmers fields in the area to Kikham so will have good shufty then and report back. Dave and I will also do the same at xmas.
True. But. There are plenty who commute from stations between Wigan and Southport to Bolton or Oxford Rd/Piccadilly who will be particularly unimpressed, especially those beyond Appley Bridge who don't benefit from TfGM pricing and whose journeys will be much less convenient. If timetables work then a simple change at Hindley for Bolton may not be so bad though Hindley could do with better waiting facilities on the platforms. But for Oxford Rd/Piccadilly it will almost certainly mean changing at Salford Crescent onto trains which will probably be already full. And it also seems likely that the overall frequency between Bolton/Salford Crescent and Oxford Rd/Piccadilly will be reduced to enable the pathing of all the Ordsall chord services. If only a flyover had been put in at Ordsall Lane!
On the other hand if the electric service from Wigan North Western via Bolton went across the city, perhaps all going to Hazel Grove, the reduction in convenience may be mitigated. Given that there will still be trains from the Chorley line going to Manchester Airport it would appear such a routeing choice might enable the maximum number of existing links to be maintained.