Travelled Bolton-Chorley-Buckshee Parkway-Bolton today, first time for months.
It felt like a railway version of March or thereabouts when you spot a hedge hinted in green and a bush well green and a few snowdrops and lots still fast asleep and a sudden clump of daffs: exciting.
Specifically:
Lots of superstructure on the interchange visible between Bolton station and Town Hall
Bolton station buffet still shut, no signs of life.
Pegs in the cess north of the tracks in the deep cutting by Morrisons in Bolton, may be too close together for mast pegs.
Worksite in approx area of Bullfield West busy, clobber looked like drainage pipes.
Scrapes east of Dean Clough bridge, north side.
Lots of kit at worksite between Lostock station and Beaumont Rd bridge, lots of portacabins, too.
Pallisade fencing being erected north of tracks by the replaced footbridge below the golf course west of Lostock.
Lots of scrapes and new cylindrical piles between Lostock and Horwich, many appear to be replacements for ones installed some months ago by Balfour Beatty.
Scatter of scrapes, pegs and cylindrical piles all the way to Buckshee Parkway (BP), some gaps with no evidence of action.
A new crossover has been installed south of BP, new cylindrical piles immediately north of the station, they also look like BB replacements.
No action visible on any of the foot crossings.
I definitely need to get the Progressometer out and set about the job with a bit of method.
I spent half an hour on Chorley station. I am seriously impressed by the way this has been tackled. As a layman I had never thought through what's involved in "just" lowering the tracks through a station:
lower the tracks for a long way both sides
lower the subway
install a six-car temp platform, with lighting, canopy, security cameras, info screens
lower the platforms then resurface them
keep staff and users informed and safe
and they're just the obvious bits, no doubt drains, cables and goodness knows what are also eminently discombobulatable in the process.
Photos later.
It felt like a railway version of March or thereabouts when you spot a hedge hinted in green and a bush well green and a few snowdrops and lots still fast asleep and a sudden clump of daffs: exciting.
Specifically:
Lots of superstructure on the interchange visible between Bolton station and Town Hall
Bolton station buffet still shut, no signs of life.
Pegs in the cess north of the tracks in the deep cutting by Morrisons in Bolton, may be too close together for mast pegs.
Worksite in approx area of Bullfield West busy, clobber looked like drainage pipes.
Scrapes east of Dean Clough bridge, north side.
Lots of kit at worksite between Lostock station and Beaumont Rd bridge, lots of portacabins, too.
Pallisade fencing being erected north of tracks by the replaced footbridge below the golf course west of Lostock.
Lots of scrapes and new cylindrical piles between Lostock and Horwich, many appear to be replacements for ones installed some months ago by Balfour Beatty.
Scatter of scrapes, pegs and cylindrical piles all the way to Buckshee Parkway (BP), some gaps with no evidence of action.
A new crossover has been installed south of BP, new cylindrical piles immediately north of the station, they also look like BB replacements.
No action visible on any of the foot crossings.
I definitely need to get the Progressometer out and set about the job with a bit of method.
I spent half an hour on Chorley station. I am seriously impressed by the way this has been tackled. As a layman I had never thought through what's involved in "just" lowering the tracks through a station:
lower the tracks for a long way both sides
lower the subway
install a six-car temp platform, with lighting, canopy, security cameras, info screens
lower the platforms then resurface them
keep staff and users informed and safe
and they're just the obvious bits, no doubt drains, cables and goodness knows what are also eminently discombobulatable in the process.
Photos later.