Blackpool - Manchester Electrification

Status
Not open for further replies.

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Travelled Bolton-Chorley-Buckshee Parkway-Bolton today, first time for months.

It felt like a railway version of March or thereabouts when you spot a hedge hinted in green and a bush well green and a few snowdrops and lots still fast asleep and a sudden clump of daffs: exciting.

Specifically:

Lots of superstructure on the interchange visible between Bolton station and Town Hall
Bolton station buffet still shut, no signs of life.
Pegs in the cess north of the tracks in the deep cutting by Morrisons in Bolton, may be too close together for mast pegs.
Worksite in approx area of Bullfield West busy, clobber looked like drainage pipes.
Scrapes east of Dean Clough bridge, north side.
Lots of kit at worksite between Lostock station and Beaumont Rd bridge, lots of portacabins, too.
Pallisade fencing being erected north of tracks by the replaced footbridge below the golf course west of Lostock.
Lots of scrapes and new cylindrical piles between Lostock and Horwich, many appear to be replacements for ones installed some months ago by Balfour Beatty.
Scatter of scrapes, pegs and cylindrical piles all the way to Buckshee Parkway (BP), some gaps with no evidence of action.

A new crossover has been installed south of BP, new cylindrical piles immediately north of the station, they also look like BB replacements.

No action visible on any of the foot crossings.

I definitely need to get the Progressometer out and set about the job with a bit of method.

I spent half an hour on Chorley station. I am seriously impressed by the way this has been tackled. As a layman I had never thought through what's involved in "just" lowering the tracks through a station:

lower the tracks for a long way both sides
lower the subway
install a six-car temp platform, with lighting, canopy, security cameras, info screens
lower the platforms then resurface them
keep staff and users informed and safe

and they're just the obvious bits, no doubt drains, cables and goodness knows what are also eminently discombobulatable in the process.

Photos later.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,391
Location
A typical commuter-belt part of north-west England
Bolton station buffet still shut, no signs of life.
We noticed this when were returning from Blackpool North to Manchester Airport yesterday afternoon. There used to be two ladies who ran the buffet who always had a good range of items like turkey barmcakes not so very many years ago.

Whatever has happened to the withdrawal of the old style service that now sees the buffet in the deserted state it is in.
 
Last edited:

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
The buffet at Bolton has been shut for ages hasn't it? Was closed last time I was there and that's well over a year ago. There was a note up with a specific closure date on it, alas I never made a note of it at the time.

Edit - Was actually last October when I observed it as shut, forgot I'd been there to do the SLW in connection with Farnworth.
 
Last edited:

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,903
Location
North
....and I'm not even from Blackpool, I just live here but I still feel compelled to jump to its defence! (Should have known you'd be from Preston).

Would they be insulted enough if you called them Prest onions? I think the correct term is Prestonians and not as Lankyline states Prestonions.
 
Last edited by a moderator:

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
lower the tracks for a long way both sides
lower the subway
install a six-car temp platform, with lighting, canopy, security cameras, info screens
lower the platforms then resurface them
keep staff and users informed and safe

and they're just the obvious bits, no doubt drains, cables and goodness knows what are also eminently discombobulatable in the process.

Photos later.

Missed a bit: demolish and rebuild the Down line platform >800mm to the west, lift and slue the Down line to suit, lift and slue the up line 200mm and rebuild the Up platform coper edge, remove the long-timber-in-trough deck off the station subway and replace it with a new two-part precast direct fastened deck on a different track alignment, redeck chapel street for structural reasons.

:D
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Missed a bit: demolish and rebuild the Down line platform >800mm to the west, lift and slue the Down line to suit, lift and slue the up line 200mm and rebuild the Up platform coper edge, remove the long-timber-in-trough deck off the station subway and replace it with a new two-part precast direct fastened deck on a different track alignment, redeck chapel street for structural reasons.

:D

Wow - so not Farnworth tunnel proportions but a huge amount of work but hopefully good for at least half a century - I will be fertilizing daffodils by then.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Missed a bit: demolish and rebuild the Down line platform >800mm to the west, lift and slue the Down line to suit, lift and slue the up line 200mm and rebuild the Up platform coper edge, remove the long-timber-in-trough deck off the station subway and replace it with a new two-part precast direct fastened deck on a different track alignment, redeck chapel street for structural reasons.

:D

Presumably to align the track for higher speeds.

The fact that it is difficult to discern why this would be needed from Google maps presumably ties in with it only needing to be slewn by 200mm.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,607
Location
Nottingham
Isn't it a question of the spacing between the tracks being sub-standard, which would be that much more difficult to sort out after the wires go up?
 

cool2005

Member
Joined
18 Mar 2009
Messages
35
when do they start doing the blackpool north line? will they be doing anything with the blackpool south line?
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,620
Location
Rochdale
I believe there are some weekend closures of the line starting from the middle of this month. This is the lead up to the monster 18 week long closure later next year. I dont think there are any plans for works on the south line besides the connection at Kirkham being fettled.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There was a press release last week, linked and quoted by Mordac in post #3149 on page 210.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Presumably to align the track for higher speeds.

The fact that it is difficult to discern why this would be needed from Google maps presumably ties in with it only needing to be slewn by 200mm.

Not speed; it was fit for 75mph anyway (which is the speed Hub is proposing) - its clearances. The new electric rolling stock would have clashed with both platform front walls, there was no safety roll space in front of the platform (a requirement which is triggered by doing "significant works") and the sixfoot was substandard (just).

To provide a compliant roll space both sides and widen the sixfoot by at least 100mm without moving both platform walls meant that (after some thought) the project made the narrowest (Up) platform 250mm wider (leaving the front wall where it was), slued the Up line to suit, corrected the sixfoot and moved the Down platform front wall 800mm (and put the copings back to provide a compliant safety roll space on this side. This meant that the subway deck had to be replaced, but that would have been required by raising the speed from 50 to 75 anyway.

Chapel Street subway deck had longitudinal beams and plate diaphragms that weren't in the right places for the new alignment, so that went too. Simples!

BTW - slue, sluing, slued. Slew is what cranes do. :D
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I believe there are some weekend closures of the line starting from the middle of this month. This is the lead up to the monster 18 week long closure later next year. I dont think there are any plans for works on the south line besides the connection at Kirkham being fettled.

I gather the Kirkham-Blackpool South line will be resignalled, along with the whole Fylde Jn-Blackpool North line.
No point in having an island of old signalling at Kirkham just for the South line.
The platforming arrangements at Kirkham will also change, with P1 dedicated to South, P2 for both and a new P3 for Up trains from North (with the avoiding lines abolished).

"Work" of some sort is certainly starting imminently, but there is still a huge amount of electrification work to do via Bolton before they start on the Fylde line (unless there are different contractors).
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
I gather the Kirkham-Blackpool South line will be resignalled, along with the whole Fylde Jn-Blackpool North line.
No point in having an island of old signalling at Kirkham just for the South line.
The platforming arrangements at Kirkham will also change, with P1 dedicated to South, P2 for both and a new P3 for Up trains from North (with the avoiding lines abolished).

"Work" of some sort is certainly starting imminently, but there is still a huge amount of electrification work to do via Bolton before they start on the Fylde line (unless there are different contractors).

Don't think there are different contractors for electrification but there may be for some of the trackworks.
 

SodTheDrummer

Member
Joined
14 May 2015
Messages
201
Location
Bolton
there is still a huge amount of electrification work to do via Bolton before they start on the Fylde line (unless there are different contractors).

Wonder if there's an official 'scratching head trying to work out how to get wires under Trinity St' team within NR.. ? Not sure what can be done apart from rebuilding the bridge.. which would be very pricey and disruptive...:?:
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,607
Location
Nottingham
I gather the Kirkham-Blackpool South line will be resignalled, along with the whole Fylde Jn-Blackpool North line.
No point in having an island of old signalling at Kirkham just for the South line.

The South line is a long siding with one locally-monitored level crossing, so there will only be a handful of signals, all within a mile or so of Kirkham. Re-signalling it just means replacing those and transferring supervision of the line to the ROC.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Wonder if there's an official 'scratching head trying to work out how to get wires under Trinity St' team within NR.. ? Not sure what can be done apart from rebuilding the bridge.. which would be very pricey and disruptive...:?:
According to post #3015 on page 201 they've decided it's not a problem after all.
 

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
I know its not officially part of the Manchester Blackpool electrification scheme, but Leyland station now upgraded with lifts so it has 'step-free' access for all under the £5.4 million ' Access for all ' project funded by Dep of Transport and was officially opened by local dignitaries yesterday. Ive yet to try it but hope to this week.

Also , I notice some Northern trains being stabled overnight in new temp sidings known as 'Leyland B Leyland '
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Why only 75 -- is it a tighter curve than it looks?

The curve south of Chorley Tunnel is only good for 75mph and most trains call at Chorley, so there's no point pushing the 75MU95 north of the station as it would mean higher cant or cant deficiency through the station.

The existing 50 and 60 are due to level crossings that aren't there any more ...
 