Joseph_Locke
Established Member
I would have thought a problem like that would have been identified soon after electrification of the line was authorised, and would have been discussed with National Grid or whoever owns the cables, and resolved by now.
It was discovered within 3 months of starting the feasibility study, and is with ENW to action. This has been the case for over 18 months to my knowledge.
--- old post above --- --- new post below ---
Apologies that this is slightly off topic, but I think it would be a bit premature to start a separate thread on Lostock to Wigan electrification before a new schedule is published.
Travelling through Westhoughton today, it struck me (though only from looking through the carriage window) that there might be another "problem bridge" there, as and when the line is eventually electrified. The structure in question is a brick arch that carries Church Street, the B5236, over the line. It is hard against the end of the station platforms.
Yes, the next scheme off the electrification conveyor belt will be Phase 6 (Oxenholme to Windermere), before any news of Phase 7 (Lostock Junction to Wigan North Western) emerges.