Joe Callaghan has sent another fine batch of shots of the rapid progress at Farnworth Tunnel.

I have added them to Joe's album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651953947345

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083

Thank you Joe.
--- old post above --- --- new post below ---
Joe Callaghan has kindly sent this link.

http://www.railengineer.uk/2015/05/11/boring-boring-boring/

Thank you Joe
--- old post above --- --- new post below ---
Joe has also sent a photo of the new signal north of Farnworth and track in readiness for the slewing due to take place this weekend.

I've added it to Joe's album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651953947345

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083

Thank you on both counts Joe.

PS: Whilst mentioning the Combined Volume I see that Ian Allan has died, aged 93. A man who gave immense innocent pleasure to many, including me. RIP
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
Plenty going on around the Chorley area at present, track lowering currently in progress last night Fri and tonight Sat, loads of ballast trains up and down its all good to see, various different types of road rail equipment on the tracks at Chorley.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Plenty going on around the Chorley area at present, track lowering currently in progress last night Fri and tonight Sat, loads of ballast trains up and down its all good to see, various different types of road rail equipment on the tracks at Chorley.

ALX400 kindly sent me some shots of this action, which I've added to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651121057352

and to the Combined Volume, along with some I took yesterday at other places than Farnworth, here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083

Thank you ALX400.

Joe Callaghan has sent two sets of shots of the track slewing at Farnworth which took place yesterday. I took a dollop, too. They'll take a while to process, but I hope to publish them all by tonight.

Thank you Joe.
 
Last edited:

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
ALX400 kindly sent me some shots of this action, which I've added to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651121057352

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083

Thank you ALX400.

Joe Callaghan has sent two sets of shots of the track slewing at Farnworth which took place yesterday. I took a dollop, too. They'll take a while to process, but I hope to publish them all by tonight.

Thank you Joe.

Look forward to the Farnworth shots, having a significant vested interest!

The work at Chorley is the first weekend of track lowering to provide electrical clearances under MVE2/57 and /58, Lyons Lane and Brook Street. There is apparently a lot more work to come at Chorley, including bridge rebuilds and station works.

Previous posts expressed concern about a lack of OLE construction activity - owing to recent developments with regard to Balfour Beatty, I suspect there won't be any such work on phases 4 , 5 or 3 for at least a month, possibly longer.
 
Last edited:

Magicake

Member
Joined
25 Aug 2009
Messages
130
Look forward to the Farnworth shots, having a significant vested interest!

The work at Chorley is the first weekend of track lowering to provide electrical clearances under MVE2/57 and /58, Lyons Lane and Brook Street. There is apparently a lot more work to come at Chorley, including bridge rebuilds and station works.

Previous posts expressed concern about a lack of OLE construction activity - owing to recent developments with regard to Balfour Beatty, I suspect there won't be any such work on phases 4 , 5 or 3 for at least a month, possibly longer.
Very interesting news regarding the track lowering, thanks.

Not sure I can agree with you regarding OLE progress - do you not think there will be work installing foundations over the next month or two as BB seek to finish everything they have already agreed to?
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
Very interesting news regarding the track lowering, thanks.

Not sure I can agree with you regarding OLE progress - do you not think there will be work installing foundations over the next month or two as BB seek to finish everything they have already agreed to?

So is anyone going to take over from BB or will this scheme be "paused" indefinitely like MML and TP?
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Very interesting news regarding the track lowering, thanks.

Not sure I can agree with you regarding OLE progress - do you not think there will be work installing foundations over the next month or two as BB seek to finish everything they have already agreed to?

As far as I understand all agreements are off; as of two weeks ago all the construction teams left the job, so no.

So is anyone going to take over from BB or will this scheme be "paused" indefinitely like MML and TP?

Yes, someone will (the official announcements have indicated as much) but I am not aware of who it will be. It could be (and this is only my speculation) Carillion (who were on MMLE) or VolkerRail (who helped bail BB out on Phase 2 and who were on TP East) or Keltbray or even all three, but that's just a list of biggish firms with and OLE capability, so not very mystical!
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
If the takeover bid for BB by Carillion a year ago had succeeded, maybe we wouldn't be in this position.
Not for this thread, but I suppose the next question is whether this affects the BB part of the GW project (Crossrail).
Anyway, we have a "pause" on yet another electrification project. :(
At least the clearance work seems to be going well.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
It should allow BB to concentrate on GWEP, that way at something will get done (by them). I wouldn't be too concerned, honest. ;)

But is there a cause for concern on Manchester-Blackpool? Although this seems to have run pretty well so far, the main contractor walking out half way through the job sounds like a good recipe for time and cost overrun.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
But is there a cause for concern on Manchester-Blackpool? Although this seems to have run pretty well so far, the main contractor walking out half way through the job sounds like a good recipe for time and cost overrun.

I share this concern. It simply does not look credible that Phase 4 will be ready for EMUs by December 2016 based off the rate of progress we have seen.
 

G_A_C_C_C

Member
Joined
11 Dec 2008
Messages
127
Location
High Wycombe
Sorry, I must have missed something living down south as I do now....but......"the main contractor walking out half way through the job"...is this correct about BB?

If so then the answer to "I suppose the next question is whether this affects the BB part of the GW project (Crossrail)" is YES, IT SHOULD, the buggers should be binned from every project they are involved in on the entire railway and fined £millions.

These "private companies" trying to make vast profits from the railway should be treated with utter contempt by Networkrail/DaFT... moaning "we're not making enough money, this project is harder than we thought"? Really? Underbid the opposition, win the contract, what do you expect? Maybe do some proper due diligence and don't just bid low expecting to be paid off for "issues"...screw them.

hm.....I don't think my brother works for them anymore..maybe?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There is apparently a lot more work to come at Chorley, including bridge rebuilds and station works.

That's interesting - I had been assuming that LDECR's Bridgeoscope was a complete list of necessary bridge reconstructions and raisings (as distinct from track lowerings).

Also, until the last couple of days, I'd been assuming that all track lowering needed in the Chorley area was done in last year's blockade.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
That's interesting - I had been assuming that LDECR's Bridgeoscope was a complete list of necessary bridge reconstructions and raisings (as distinct from track lowerings).
Also, until the last couple of days, I'd been assuming that all track lowering needed in the Chorley area was done in last year's blockade.

I'm guessing that last year's work was all west of the station, while the work just starting is to the east?
 

Dixie

Member
Joined
19 Feb 2012
Messages
160
Could anyone tell me whether it will be possible to view the tunnel boring machine from a public location on the day as it sets off on its journey? And if so, how do you access that place, where can you park nearby and when is it likely to be?

Thanks everyone
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
That's interesting - I had been assuming that LDECR's Bridgeoscope was a complete list of necessary bridge reconstructions and raisings (as distinct from track lowerings).

Also, until the last couple of days, I'd been assuming that all track lowering needed in the Chorley area was done in last year's blockade.

My source has kindly sent the following:

Snowball makes a valid point, so here's the detail:

MVE2/59 Chapel Street Subway (22 miles 300y-ish) - re-decked as a result of track slews

MVE2/60 Chorley Station Subway (22 miles 320y-ish)- re-decked as a result of track slews and speed increases (which are unrelated to each other).

Thank you Mr/Ms X.


I've now added the full set of photos and films from the weekend.

ALX400 sent some more of track lowering at Chorley, I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651121057352

Joe Callaghan sent some more of track slewing at Farnworth, I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/sets/72157651953947345

I've added them, plus my own, to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/sets/72157648767927083

Thank you ALX400 and Joe.
--- old post above --- --- new post below ---
Could anyone tell me whether it will be possible to view the tunnel boring machine from a public location on the day as it sets off on its journey? And if so, how do you access that place, where can you park nearby and when is it likely to be?

Thanks everyone

I've explored all around the site and talked to locals. I've concluded that the only legal and safe place is on the footbridge between Kearsley Station and the southern tunnel mouths. Joseph_Locke has rightly referred to this as the Viewing Platform.

In the Spring it was a fine place to view the tunnel and works, but now trees are in full leaf the line of sight is rather restricted, but not blocked altogether.

The bridge has been built to modern spec, so something to stand on is a good idea, given where the TBM will set off from.

The best place to park is Kearsley station car park, which is at the end of Station Road, a cul-de-sac off Stoneclough Road.

A poorly maintained public track runs from the car park alongside the line to the footbridge, the track is wet in all weathers, making WELLIES IMPERATIVE.

Alternatively you could park on Church Road and walk to the footbridge from the other direction. The downside is that the path to the bridge is compressed earth and steep, presenting a slip-on-your-backside-and-skate-ten-feet risk, as I learned the hard way.

The footbridge is some distance from the tunnel, so binocs are essential for viewing and a half-decent zoom for photography and filming. There are a good few shots in the Combined Volume for you to get the idea.

As for when, I've read somewhere that it'll take them 3 weeks to assemble the TBM on site. I hope someone will report and.or photograph that happening and give us a clue. Maybe one of our professionals will be able to tell us exactly, but right now, I haven't seen owt clear.

Happy hunting

Dave

PS Bridgeoscope below
 

Attachments

  • Bridgeoscope2.xlsx
    54.4 KB · Views: 18
Last edited:

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Will the tunnel boring be done 24/7 ??. Just thinking about local residents and the noise vibrations etc. Also the removal by road of spoil wold mean lorries coming and going at night ?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
Will the tunnel boring be done 24/7 ??. Just thinking about local residents and the noise vibrations etc. Also the removal by road of spoil wold mean lorries coming and going at night ?

My guess is no unless they get behind schedule. I hope Mr Locke comes along to give the insider answer.
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
Excellent photos coming in from all over, There's a few of us about eh :), it's amazing what the Orange Army can do in the time they have got, really good to see it all coming along.
 

Dixie

Member
Joined
19 Feb 2012
Messages
160
I've explored all around the site and talked to locals. I've concluded that the only legal and safe place is on the footbridge between Kearsley Station and the southern tunnel mouths. Joseph_Locke has rightly referred to this as the Viewing Platform.

In the Spring it was a fine place to view the tunnel and works, but now trees are in full leaf the line of sight is rather restricted, but not blocked altogether.

The bridge has been built to modern spec, so something to stand on is a good idea, given where the TBM will set off from.

The best place to park is Kearsley station car park, which is at the end of Station Road, a cul-de-sac off Stoneclough Road.

A poorly maintained public track runs from the car park alongside the line to the footbridge, the track is wet in all weathers, making WELLIES IMPERATIVE.

Thanks for that comprehensive reply Dave.

I too would welcome any dates as to when it will set off, as I intend to be there if I'm not away anywhere. Also a young train fan friend and his dad, who live locally, would also like to see it depart.
 
Last edited: