I've literally just been out down to Blackrod and spoke to some of the Carillion guys there who said the bridge is due for demolition this weekend but they had found some unknown live cables so Electricity Northwest were out tomorrow to try and sort them out so its 50/50 at present.
Hot footed it off to Horwich Parkway and as Joseph said there's mast bases appearing lol, witnessed about 8 Orangemen digging and doing stuff, froze mi butt off on the platform its a howling gale at the mo, got a few photos, as soon as LDECRexile gets the album sorted were off
--- old post above --- --- new post below ---
Busy weekend in store for the bridges on the route in Horwich and Chorley, at the moment 2 Baldwins 400 Cranes are sited at Adlington ready about to start replacing the deck at Skew Bridge with Carillion Orangemen everywhere its one massive bridge that cut out of the land, at Station Road in Horwich another Baldwins 500 crane is sited and rigged ready to replace that bridge once demolition starts at 07.00 Sat morning due to the closeness of properties at midnight all was quiet as I got some photos ready for posting later, I noticed that Network Rail had time lapse webcams recording stuff on poles, they seem to be into that sort of thing at the moment lol, good though to watch, those cranes are huge with about another 5 artics carrying ballast blocks.
There's no doubt that once these's are done I bet the mast and base teams wont be far behind from Euxton towards Lostock first, NR does seem to be on time doing this phase, things do seem to be moving rather fast now what with bases being put in at various work sites along the track aswell.
Is this lol nonsense really relevant or necessary on a rail forum site?