what? are they not all factory made kits now?
New stations may well be, but stations dating from the Victorian era are considerably more difficult to fit extensions in, especially if they abut a viaduct, a retaining wall or a tunnel. Liverpool Lime St, to use a recent example, required a bespoke situation.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
why cant we get our act together and build adequate platforms? This mucking with train lengths, and SDO, to fit into inadequate platforms is a (*&^&^% disgrace.
Probably because the government rightly thinks there are better things to spend money on than pointlessly extending railway station platforms. Even if all platforms on the route could handle 6 car trains I’ve seen absolutely nothing, except speculation on the internet, to suggest 6 car trains will operate.

However, on the Preston – Manchester route I have no idea why the platform extensions were temporary and not permanent when they were doing them anyway. It took them several months to do them and then they were ripped out again about 3 days after the work was complete. It must have cost a fortune in man hours alone and I can’t believe permanent extensions would have cost that much more.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
why cant we get our act together and build adequate platforms? This mucking with train lengths, and SDO, to fit into inadequate platforms is a (*&^&^% disgrace.
Blame the incrementalists in DfT who "value engineer" every scheme down to the minimum for today. The Preston - Manchester project is deeply unusual in that (if you look closely) the OLE and signalling kit has been installed to allow extensions to eight-car trains (Pendolinos at Bolton), where those might call, but the extensions weren't built. On that route, eight car trains at Salford Crescent is the problem because BR, 30 years ago, was not in a position to even imagine an upturn in passenger numbers ...
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Great if they are intending to run 6 cars but not if they’re not. On the Manchester – Preston line Bolton, Horwich Parkway, Chorley and Buckshaw Parkway can presumably all fit a 6 car 323 as they have 6 car 185 services stopping. Leyland and the other stations which had temporary extensions for the Farnworth Tunnel work can’t so capacity could be increased on the semi-fasts but would be reduced on the stoppers.

Subject to staffing etc, why not run a mixture of single 319s and double 323s depending on platform lengths?
 

CHAPS2034

Member
Joined
13 Mar 2018
Messages
644
Official Video of the Pendo test from NR

https://www.networkrailmediacentre....es-through-bolton-as-upgrade-nears-completion

The accompanying text contains the following information which may be of interest

"This week’s test runs are the first of two phases to check new electrical infrastructure works correctly. The second, in early January, will check the infrastructure can handle faster train speeds for improved passenger journey times."
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
Official Video of the Pendo test from NR

https://www.networkrailmediacentre....es-through-bolton-as-upgrade-nears-completion

The accompanying text contains the following information which may be of interest

"This week’s test runs are the first of two phases to check new electrical infrastructure works correctly. The second, in early January, will check the infrastructure can handle faster train speeds for improved passenger journey times."
I wonder if faster speed testing will include the steam days speeds on Preston Blackpool.
K
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
I suspect this may be it; Sat. 15th Dec- see bottom of page - 5Z10 ManVic reversing sidings to ManVic reversing sidings, starting 2020

http://www.realtimetrains.co.uk/search/advanced/SFD/2018/12/15/0000-2359?stp=S&show=all&order=wtt

Pathed as 75 mph Sprinter DMU , but there again doesn't really mean anything as the Pendos were pathed as Voyagers. Anyway the reversing siding is where the Manchester 319 usually seems to live when it's not active.

any idea what unit was involved has it been going back and forth but 21L down?
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,616
Location
Rochdale
It was 319386 doing the testing. Just caught the tail end going back to the sidings. It set out late and remained late through out .

Presuming that testing was a success. I'm wondering if we will see a token electric service next week on something .
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Official Video of the Pendo test from NR

https://www.networkrailmediacentre....es-through-bolton-as-upgrade-nears-completion

The accompanying text contains the following information which may be of interest

"This week’s test runs are the first of two phases to check new electrical infrastructure works correctly. The second, in early January, will check the infrastructure can handle faster train speeds for improved passenger journey times."

I wonder if that means no electrode until the second phase has been tested, or that the line speed increases will wait until the second phase has been tested and electrics can run at normal speeds until then?
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
The most surprising thing about the NR footage was the sight of a decent length train at Bolton
I thought that, and I may have been in the last one way back when! Wonder in the last 3 - 4 yrs what the longest has been, in the tpe days two three-cars together?
 

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Would there be any need or requirement to run electracally hauled freight on the Manchester Bolton Preston line ? I assume it would have to be able to take electric loco hauled trains if only as a diversionary route should the WCML be closed ?
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
Would there be any need or requirement to run electracally hauled freight on the Manchester Bolton Preston line ? I assume it would have to be able to take electric loco hauled trains if only as a diversionary route should the WCML be closed ?
I would hope it can take anything the WCML can. having an electrified diversionary route in case of blockages between Warrington and Preston would be very valuable.
It now means an electric train can get all the way from Roade to Euxton without going on the WCML.

One wonders if the train staff will have the necessary route knowledge :(
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
It now means an electric train can get all the way from Roade to Euxton without going on the WCML.

**PEDANT ALERT**

Not quite - WCML running is inevitable either between Norton Bridge and Stafford, or between Colwich and Rugeley, plus through Rugby station.

Valud point though - between Roade and Euxton there is pretty much no "single point of failure" now.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Valud point though - between Roade and Euxton there is pretty much no "single point of failure" now.

This is where Network Rail needs to push train operators to get all traincrew to sign the diversions. I'm sure I remember reading a case earlier in the summer where there was an overhead line problem on the direct route between Golborne and Winwick so trains were diverting via Earlestown and a Euston driver couldn't take the diversions because Virgin had made him take it off his card.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
**PEDANT ALERT**

Not quite - WCML running is inevitable either between Norton Bridge and Stafford, or between Colwich and Rugeley, plus through Rugby station.

Valud point though - between Roade and Euxton there is pretty much no "single point of failure" now.

Except Rugby. One would hope they have built in redundancy so a major incident does not block all lines. But i doubt it.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Except Rugby. One would hope they have built in redundancy so a major incident does not block all lines. But i doubt it.

Rugby station is pretty much fully bi-di signalled - Sunday mornings (for example) see half the station blocked (Up side or Down side) with trains using the other half.

But something like a suicide is always going to be very disruptive there, no matter what.

At least there is the Chiltern route as a decent contingency to avoid Rugby (for passengers, not the trains!)
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
I was assuming that the second phase of testing in January requires the Extension Lead being installed over Christmas?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,461
Location
Preston Lancs
Not sure where to post this but..... Please move to a more appropriate place if needed.
I have just come across a free E-Book on 25kV systems by Garry Keenor. link here. http://www.ocs4rail.com/
It is on the very first page of the pinned Electrification resources thread at the top of the infrastructure forum which anyone is free and encouraged to add to.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
I was assuming that the second phase of testing in January requires the Extension Lead being installed over Christmas?

What can operate over manc/euxton until the extension lead is complete? I assume a full electric Manc/blackpool service would overload the existing feeder stations. I assume to much current being drawn would cause voltage to drop, thus causing amps to increase till a circuit breaker would trip.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Would there be any need or requirement to run electracally hauled freight on the Manchester Bolton Preston line ? I assume it would have to be able to take electric loco hauled trains if only as a diversionary route should the WCML be closed ?
The Tesco Express hauled by an 88 ran via Eccles earlier this year due to planned engineering works so I can't see any reason why the route through Bolton couldn't be used, subject to the usual, i.e. paths, driver route knowledge, etc.

No matter how useful a diversionary route this will be it will be negated by the fact there will no longer be a diversionary route between Bolton and Preston for scheduled trains. When there were problems they used to divert from Bolton to Wigan but once EMUs take over that will not be possible so disruption for Lancashire passengers will increase.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,569
Location
Lancashire
What can operate over manc/euxton until the extension lead is complete? I assume a full electric Manc/blackpool service would overload the existing feeder stations. I assume to much current being drawn would cause voltage to drop, thus causing amps to increase till a circuit breaker would trip.

No in theory a full service could run, but it would be on a wing and a prayer if there was any other WCML feeder problems
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
No in theory a full service could run, but it would be on a wing and a prayer if there was any other WCML feeder problems
so if there was a hypothetical problem taking out Parkside feeder station at 1730 on a Thursady night in February.
what would actually happen out on the railway?
 