FrozenPoints
Member
- Joined
- 2 Jan 2011
- Messages
- 94
Following on from this BBC article: http://www.bbc.co.uk/news/business-12480813 - many moons back, it stated that part of the new station was being constructed on the former redundant piers
But, firstly, I wasn't aware of that, plus the fact the station capacity will be reduced to four, a mistake in my view. I thought Blackfriars could have the capacity for five or six on the basis of reintroducing the red redundant pier structures.
Then, with the track switch done, and I believe (when I thought the new terminus platforms were already complete), clearly that isn't the case?
If so, is my logic wrong to think the former terminus platforms are not being used for through services to Luton and Bedford and to London Bridge and Brighton - or what is the extension of the red piers for then?
Help!
But, firstly, I wasn't aware of that, plus the fact the station capacity will be reduced to four, a mistake in my view. I thought Blackfriars could have the capacity for five or six on the basis of reintroducing the red redundant pier structures.
Then, with the track switch done, and I believe (when I thought the new terminus platforms were already complete), clearly that isn't the case?
If so, is my logic wrong to think the former terminus platforms are not being used for through services to Luton and Bedford and to London Bridge and Brighton - or what is the extension of the red piers for then?
Help!
Last edited:
