• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Barking Riverside Extension (London Overground) Updates

Status
Not open for further replies.

James H

Established Member
Joined
25 Jun 2014
Messages
1,545
Official announcement of first day of service coming very soon indeed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
Ian’s visits website is also saying opening Monday 18th as advised by TfL

The Barking Riverside extension of the London Overground will open to passengers next Monday – 18th July, TfL has confirmed. Just last month, TfL said that it was bringing the opening forward from this autumn to sometime this summer, and has now confirmed the opening date as next Monday.
Although the station opens on Monday 18th July, the line will close on its first weekend, Saturday 23 and Sunday 24 July due to Network Rail works along the Gospel Oak to Barking (GOBLIN) branch of the London Overground, after which the station will be open seven days a week.

 

Malaxa

Member
Joined
9 Mar 2022
Messages
167
Location
London
"TfL has announced" "TfL confirms".... yet the various sources ** of this information never link to anything from TfL. How exactly does TfL announce to these chosen sources ?? I'm not doubting the information, just curious how TfL disseminates it.

** My London, RailBusinessDaily, Ian Visits, etc etc.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
"TfL has announced" "TfL confirms".... yet the various sources ** of this information never link to anything from TfL. How exactly does TfL announce to these chosen sources ?? I'm not doubting the information, just curious how TfL disseminates it.

** My London, RailBusinessDaily, Ian Visits, etc etc.

TfL seems to send out embargoed press releases, which can be published in the morning, so lots of news sites carry it.

For reasons that are not clear to me, the TfL Press Office seems to hold back on getting it uploaded to TfL’s own website usually until 10:30 - 11:30 so few hours after everyone else has reported it. Could you imagine if they waited 3 hours to upload a service update to website, so the thinking behind this needs to be explained to me.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,108
It's quite normal.

I was recently tipped off around 8pm by a journalist at one of the main broadcasters of the contents of a very interesting press release which a government department had embargoed until midnight. I was able to help the journalist with what it meant, provide some useful facts etc, so that they were ready to hit send on their view on it as soon as the embargo time had passed. (And so was I!)

And similarly with an announcement the PM made one day at 8pm. The media knew its contents around 30 minutes previously (and so did I!)
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,522
Location
West London
I assume at some point that press release will get uploaded to the TfL website for the world to see.

Barking Riverside station to open 18 July
The new 4.5km stretch of railway will connect the new development of Barking Riverside to Barking town centre in seven minutes
The extension of London Overground to a brand-new station at the heart of Barking Riverside will open to customers in one week (Monday 18 July) providing new quicker, easier and sustainable journey options to this key regeneration area.
The new station at Barking Riverside is fully step-free, bringing the total across the London Overground network to more than 60 stations, helping make London a more accessible city for everyone and support people's independence when travelling in London.
 
Last edited:

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
Is the GOBLIN now the GOBRIN? Asking the important questions here.
 

JaJaWa

Established Member
Joined
14 Feb 2013
Messages
1,734
Location
Is the GOBLIN now the GOBRIN? Asking the important questions here.

The London Overground “lines” (or should that be “routes”) have now been officially named. It is now the “Gospel Oak to Barking Riverside route”.

GOBLER?
GOB-RER?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,188
Location
0035
For reasons that are not clear to me, the TfL Press Office seems to hold back on getting it uploaded to TfL’s own website usually until 10:30 - 11:30 so few hours after everyone else has reported it. Could you imagine if they waited 3 hours to upload a service update to website, so the thinking behind this needs to be explained to me.
The TfL ‘Press releases’ section of the website doesn’t appear to be a full exhaustive list of their press releases, these are located on the “PRGloo” website which is closed for the public.

 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,276
Location
Gatley
I'm planning on going to Riverside on 18th (having missed Crossrail's big day - though I hope to be there for the first day of through running).

Apologies if they're already in this thread, but what are the distances (miles & chains) between:
Tilbury Line Junction East and Barking Riverside Up Junction,
Riverside Up Junction and Ripple Lane West Junction,
Ripple Lane West Junction and Barking Riverside.

I see that Barking Riverside Up Junction is a timing point on RTT for trains from Barking Riverside but not trains to Barking Riverside. Could someone explain that to me, please, thanks.

Has a detailed track diagram for the Riverside extension been published, and if so, could someone post a link.

Thanks for any information - much appreciated.
 

leytongabriel

Member
Joined
27 Jan 2013
Messages
639
...... to Barking Riverside ' route'. Groan. It's a railway LINE isn't it. Having got over the 'link' fad are we know going to suffer marketing 'routes' for a decade ?
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London
The London Overground “lines” (or should that be “routes”) have now been officially named. It is now the “Gospel Oak to Barking Riverside route”.

Is that a name? I'd call it a lengthy description. Not as lengthy as "Highbury & Islington to New Cross, Clapham Junction, Crystal Palace and West Croydon route" though. Jeez.

GOBLER?
GOB-RER?

EMBARGO (Electric Metro from BArking Riverside to Gospel Oak)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
I'm planning on going to Riverside on 18th (having missed Crossrail's big day - though I hope to be there for the first day of through running).

Apologies if they're already in this thread, but what are the distances (miles & chains) between:
Tilbury Line Junction East and Barking Riverside Up Junction,
Riverside Up Junction and Ripple Lane West Junction,
Ripple Lane West Junction and Barking Riverside.

I see that Barking Riverside Up Junction is a timing point on RTT for trains from Barking Riverside but not trains to Barking Riverside. Could someone explain that to me, please, thanks.

Has a detailed track diagram for the Riverside extension been published, and if so, could someone post a link.

Thanks for any information - much appreciated.
The up and down halves of the junction are quite well separated by distance, but the down junction is grade separated and conflict free, so does that perhaps mean trains don’t need to be timed there?

The route taken by up trains is more conflicting, as far as the sectional appendix shows it there seems to be a flat crossing of the eastbound entry route into the Ripple Lane sidings.

If you want the detailed layout and distances they’re in the Anglia online sectional appendix, you need to refer to routes EA1390 and EA1395. Links to sectional appendices are on the Network Rail page here:
 

Basil Jet

On Moderation
Joined
23 Apr 2022
Messages
1,090
Location
London

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
TfL are scheduled to open Barking Riverside tomorro, but have now put out a Press Release suggesting Essential Journeys only

Customers making essential journeys should check before they travel and always carry water
Transport for London is advising customers to only travel if essential on Monday 18 and Tuesday 19 July, due to the high temperatures forecast.

But then add
TfL will work hard to keep as many services running as possible and is carrying out enhanced inspections to mitigate the impact of the extreme weather.

So looks like it might get some sort of record, a new line and station that is opened, but don’t want anyone to use it for first 2 days
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
That's a general advisory due to the heatwave isn't it though
 

zero

Established Member
Joined
3 Apr 2011
Messages
1,601
It's not going to get too hot until 10am so the first few trains should be ok
 

bicbasher

Established Member
Joined
14 May 2010
Messages
1,839
Location
London
So the GOBLIN along with the ELL are planned to operate normally today and Tuesday on the Overground network despite the weather conditions, which just happens to coincide with the opening of Barking Riverside.
 

TheHSRailFan

Member
Joined
16 Jun 2018
Messages
297
Fair few people out this morning on the first train. Many doing it before midday where the heat will start to effect the rail network.

Lift was not working, we had to change trains to the other platform and a freight train had held the train rightrright after it left the ramp.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,268
I imagine far fewer bloggers and YouTubers will want to be there on the first day than with the opening of the Liz Line or Battersea Northern Line extension!
 

JaJaWa

Established Member
Joined
14 Feb 2013
Messages
1,734
Location
Not sure if this is one for the Barking Riverside thread or the TfL map watch but...
  • Barking Riverside is incorrectly shown with an interchange symbol on the line diagrams
  • All of the out-of-station interchanges including the publicised Elizabeth line connection are missing
  • They've also accidentally added an interchange symbol to Beckton when they moved that branch (or maybe they assumed that all lines end with that symbol)
 

Attachments

  • Barking Riverside line diagram.jpg
    Barking Riverside line diagram.jpg
    277.8 KB · Views: 246
  • Beckton and Barking Riverside incorrectly shown with blobs.jpg
    Beckton and Barking Riverside incorrectly shown with blobs.jpg
    191.3 KB · Views: 249
  • Chingford and Epping correctly shown without blobs.jpg
    Chingford and Epping correctly shown without blobs.jpg
    257.6 KB · Views: 246
Last edited:

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,765
Location
SW London
So the GOBLIN along with the ELL are planned to operate normally today and Tuesday on the Overground network despite the weather conditions, which just happens to coincide with the opening of Barking Riverside.
Service currently suspended because of signal failure at Walthamstow Queens Road.

Unlike the usual hoohah when a new line opens in London, there was nothing on the local BBC news - presumably because they don't want to encoiurage people to come out and play on it today.
 

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,302
Barking Riverside does have a river pier so maybe that is what the interchange blob is for?
 
Status
Not open for further replies.

Top