Probably better of working in retail, back office or something similar if you want those kind of long term guarantees. The operational side of the railway has always required a bit more flexibility in order to operate successfully at reasonable cost, that's s a major part of the reason it usually pays significantly better rates
The staff
are being flexible, but management want to take that flexibility to a whole new level.
Would you be happy if you looked at your roster and on Friday 22 January you were turn 12, starting at 0725 and finishing at 1615 paying 8hr50min, but on Monday 18 January the alteration sheet for Friday 22 January gets posted and turn 12 is cancelled and you are now booked on STP turn 1012, starting at 0725 and finishing at 1915, the new STP turn does
exactly the same work as turn 12 up to 1615 but then you have to do 2 addition trips before finishing!
There are no engineering works or sporting events on etc, the 2 additional trips are normally on LTP turn 27 which has been cancelled (due to no driver available because the depot is 8 drivers short) and split up with the work added onto other <cancelled> LTP diagrams (turning them into very long STP diagrams) meaning the drivers who are on these <made up> STP diagrams are now working an 11hr50 day instead of their normal 8hr50, is that fair?
Oh they could also do it on the other 3 days you are booked to work that week so your 35 hour week has suddenly become a 47 hour week, but because they are <made up> STP diagrams you don't get a shorter working week later on to get your hours back down, you just get paid the overtime even though you haven't been asked if you want to work overtime.
This has been going on for a while now and is
not what STP diagrams are for, they are there to take account of engineering work or special events etc that
do have an effect on the service, not to take account of poor planning from Management!