• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

[AT] Austrian timetable 2026 online

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
The 2026 timetable has finally been uploaded and can be seen on the ÖBB site.

Due to the opening of the Koralmbahn, it is a very major changeover with much reduced journey times on the Südbahn and plenty of changes for international services.

Also, DB closures in the second half of 2026 mean many changes on the Westbahn too.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
Vienna - Ostrava is now 5 trains a day, with departures at 0810, 1210, 1410, 1610 and 1810. Just the 1010 gap to plug before the service can be described as two-hourly. Isn't one of Regiojet / LeoExpress (I forget which) supposed to be introducing a Vienna - Poland connection as well?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
There's a Prague-Vienna-Villach RJ train too.
Vienna-Graz-Ljubljana-Trieste is now RJX via Graz, Villach and Udine - Ljubljana gets a separate EC service via Maribor.
And more journey time reductions to come when the Semmering tunnel opens.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,727
The 2026 timetable has finally been uploaded and can be seen on the ÖBB site.

Due to the opening of the Koralmbahn, it is a very major changeover with much reduced journey times on the Südbahn and plenty of changes for international services.

Also, DB closures in the second half of 2026 mean many changes on the Westbahn too.
Is there a link to the new PDF route timetables - I couldn't see one? But that might just be me not seeing it!
 

doc7austin

On Moderation
Joined
31 Dec 2023
Messages
473
Location
not disclosed
Vienna-Graz-Ljubljana-Trieste is now RJX via Graz, Villach and Udine - Ljubljana gets a separate EC service via Maribor.
That permanently eliminates the last long-distance train between Italy and Slovenia via Villa Opicina. The EC Triest-Ljubljana-Vienna was also cut back to Ljubljana earlier this year.
 

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
That permanently eliminates the last long-distance train between Italy and Slovenia via Villa Opicina. The EC Triest-Ljubljana-Vienna was also cut back to Ljubljana earlier this year.

Well, that border crossing has been without Long-distance trains - or indeed any passenger trains - quite often in recent years.

From what I heard, there are some ideas about Milan - Ljubljana, which actually might make sense. Vienna - Trieste is simply much faster via Udine now.
 

Frothy

Member
Joined
19 Jul 2012
Messages
165
Location
Deepest darkest France
I've noticed that the ZSSK Eurocity trains to Bratislava and Košice are running to and from Wien Westbahnhof, at four-hourly intervals.

Presumably these will also run via Marchegg, although the Zurich-Bratislava RJX will still run via Petržalka.
 

duesselmartin

Established Member
Joined
18 Jan 2014
Messages
2,153
Location
Duisburg, Germany
The 2026 timetable has finally been uploaded and can be seen on the ÖBB site.

Due to the opening of the Koralmbahn, it is a very major changeover with much reduced journey times on the Südbahn and plenty of changes for international services.

Also, DB closures in the second half of 2026 mean many changes on the Westbahn too.
gone is the Bolzano to Vienna RJ.
 

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
gone is the Bolzano to Vienna RJ.

This was already known. South Tyrol paid a subsidy for it and (rightly) decided it was not worth it. The train was slow and timings unattractive (which could not be changed because a RJ set was and is only available in marginal timings, ie only when it would otherwise sit around in Innsbruck overnight).

== Doublepost prevention - post automatically merged: ==

For anyone planning trips:

The ICE trains Vienna - Germany via Passau will effectively not run from February onwards because of DB works. Until the summer their number will be much reduced with a diversion adding an hour to journey time; from Summer onwards they will not run at all. instead Vienna - Munich will get additional trains, with some interesting runnings via Simbach, Diesel-hauled between Wels and Munich.

For the second half of the year, Vienna - Zurich will also be much less frequent and much slower (as will Vienna - Tyrol/Vorarlberg) because the DB works on the Passau line means more capacity is needed between Salzburg and Rosenheim for freight diversions, so all trains will be slowed down to harmonise running times.
 
Last edited:

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
Are there any OeBB Railjet extensions from Vienna to Bratislava via Marchegg from October onwards? Or is the timetable staying hourly REX plus the odd ZSSK extensions for now?
 

doc7austin

On Moderation
Joined
31 Dec 2023
Messages
473
Location
not disclosed
One question: Wasn't there some talk a year ago, that a summer-seasonal Munich-Verona overnight RJ/EU was supposed to be introduced, wasn't it ? I've never heard about that again.
 

SeanG

Established Member
Joined
4 May 2013
Messages
1,377
The ICE trains Vienna - Germany via Passau will effectively not run from February onwards because of DB works. Until the summer their number will be much reduced with a diversion adding an hour to journey time; from Summer onwards they will not run at all. instead Vienna - Munich will get additional trains, with some interesting runnings via Simbach, Diesel-hauled between Wels and Munich.
Is there any where to find out the timings of these and what stock/loco will be used?
Are they on Vagonweb (and if so what services am I looking at)?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
I've noticed that the ZSSK Eurocity trains to Bratislava and Košice are running to and from Wien Westbahnhof, at four-hourly intervals.
Presumably these will also run via Marchegg, although the Zurich-Bratislava RJX will still run via Petržalka.
Marchegg (Gr) is on the "intermediate stops" list for these 3 EC trains, presumably with the existing ZSSK Ex stock.
47 minutes Wien Hbf-Bratislava hl.st would seem to be the new fastest journeys between the two capitals, possibly ever!
 

Frothy

Member
Joined
19 Jul 2012
Messages
165
Location
Deepest darkest France
Marchegg (Gr) is on the "intermediate stops" list for these 3 EC trains, presumably with the existing ZSSK Ex stock.
47 minutes Wien Hbf-Bratislava hl.st would seem to be the new fastest journeys between the two capitals, possibly ever!
I can actually see 4 daily EC services in each direction - one of them runs only between Bratislava and Wien Westbahnhof. Good spot on the Marchegg (Gr), I can't see that on the Scotty App.

They do take nearly an hour from arriving at Hbf to arriving at Westbahnhof!
 

Attachments

  • Screenshot_2025-10-07-13-52-06-45_9b9006c62c9acc50837eced207eb394e.jpg
    Screenshot_2025-10-07-13-52-06-45_9b9006c62c9acc50837eced207eb394e.jpg
    338.1 KB · Views: 57
  • Screenshot_2025-10-07-13-53-18-38_9b9006c62c9acc50837eced207eb394e.jpg
    Screenshot_2025-10-07-13-53-18-38_9b9006c62c9acc50837eced207eb394e.jpg
    337.4 KB · Views: 56

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
Are there any OeBB Railjet extensions from Vienna to Bratislava via Marchegg from October onwards? Or is the timetable staying hourly REX plus the odd ZSSK extensions for now?

That is it for now, there would not be enough RJ sets to extend services. It will surely happen in the future, but possibly with the new RJ KISS sets on order. Which would not be bad, since travelers between the two cities, especially commuters, will always be in the majority, and those sets are well suited to it.

== Doublepost prevention - post automatically merged: ==

One question: Wasn't there some talk a year ago, that a summer-seasonal Munich-Verona overnight RJ/EU was supposed to be introduced, wasn't it ? I've never heard about that again.

There was, but it came to nothing, I heard because of regular nighttime possessions on the Italian side.

== Doublepost prevention - post automatically merged: ==

I've noticed that the ZSSK Eurocity trains to Bratislava and Košice are running to and from Wien Westbahnhof, at four-hourly intervals.

Presumably these will also run via Marchegg, although the Zurich-Bratislava RJX will still run via Petržalka.

Yes, all via Marchegg except for the RJ (its 1116 is not approved on the new line - the route via Petrzalka is a specific, exceptional approval, but it does not have general approval in Slovakia.)
 
Last edited:

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
Did the Polish services always have 4 hours to fester at Vienna? Seems excessive even for this kind of uber long-distance services. Unless those sorts of operations are only ever expected to be one round trip a day then the layover almost doesn't matter ...
The current timetable has approximately 2h layover, not 4h. I wouldn't be surprised to see the Poland services eventually combined with the Semmering, just as the Prague has been for some years, but it would require new rolling stock I imagine.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
The current timetable has approximately 2h layover, not 4h. I wouldn't be surprised to see the Poland services eventually combined with the Semmering, just as the Prague has been for some years, but it would require new rolling stock I imagine.

I mean calculated at Wien Hbf. From arriving Hbf from Poland to departing Hbf to Poland, it's nearly 4 hours of festering (including the 2-hour stopped time at Westbahnhof).
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
I mean calculated at Wien Hbf. From arriving Hbf from Poland to departing Hbf to Poland, it's nearly 4 hours of festering (including the 2-hour stopped time at Westbahnhof).
Sorry, I checked the timetable not the stock workings - you are correct, and the new EC204/5 set actually lays over for 19hr at West!
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
Sorry, I checked the timetable not the stock workings - you are correct, and the new EC204/5 set actually lays over for 19hr at West!

Thanks. Out of interest, where does one check stock workings for OBB/PKP services?

When you said 19 hours I wanted to say overnight stabling is an exception then I looked at the timings.

EC205 arrives at Wien Hbf at 15:49 and ought to form an afternoon return working back to Poland.
EC204 departs from Wien Hbf at 14:10 and ought to be formed out of an early morning inbound service from Poland.

Given the current timetable structure (which is a good structure as there is a well defined symmetry applied across Austria and the Czech Republic as far as I can see), odd:49 to even:00 only gives a 21-minute turnaround if the turnaround was performed entirely within Hbf (or Ostbahnhof in my 'what might have been'). Feels ropey for services about 10-hours in length. But then the Vienna Hbf festering time would be even less if the service continued to Graz. If it's good enough for carrying on to Graz it's good enough for a turnaround. In fact once Breclav - Wienna upgrade is complete the journey time would be reduced by about 10 minutes, so the 21-minute turnaround would become 40-45.

As for through running to Graz - PKP's new intercity rolling stock is only specc'd for 200km/h, which is no good for the Koralmbahn. That suggests the Poland services will be terminating at Vienna for a very long time to come. So shoehorning a lot of terminating services over infrastructure designed for through services will remain a long-term feature.

I'm still surprised these Polish and Slovakian services loop all the way to Westbahnhof to terminate, as there is yard space between Hbf and Meidling (assuming they are intended for reversals and not long-term stabling). It must mean yard capacity (or entry exit capacity) has been exhausted already by the other terminating services? As for the ugly routing I previously described - I based that on the published platforms of the handful of in-service Westbahnhof - Hbf runs in the current timetable - platforming isn't yet published for the Dec 2025 timetable on the OeBB journey planner. The S80 (booked to use platforms 3 and 4 at Wien Hbf) is only half-hourly, so theoretically there should be room for accommodating a 10-minute dwell for the Polish services (timings do seem to work out). This would be a much smoother route through Meidling without having to cross tracks or run bang road. We'll have to see what the finalised Dec 2025 timetable has to say in terms of platforming.

Even with the smoother routing through platforms 3 and 4, the route between Meidling and Wbf has several level crossings with busy arteries. If, like the Polish services, ZSSK intercities into Vienna turning at Wbf are also two-hourly (in the medium term), then you have barriers coming down twice an hour (hourly each way). That's an enormous amount of congestion and safety externalities caused by economically useless glorified ECS moves. And I'm sure Polish farepayers are delighted their money is paying for their rolling stock asset spending hours touring Vienna being unproductive.

This isn't just something slightly imperfect, it's a howler.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
The Polish trains generally run ECS to Westbahnhof already, so just being opened to passengers instead. It’s largely conflict free through the back platforms at Meidling, same route as the peak hour 2016 starters from Hbf over the flyover.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
Thanks. Out of interest, where does one check stock workings for OBB/PKP services?
Nothing official - I used Vagonweb: this has standard formations for all of them (bar the Graz which doesn't use PKP stock) but a couple are formed wrong way round - hence being able to link them.
When you said 19 hours I wanted to say overnight stabling is an exception then I looked at the timings.

EC205 arrives at Wien Hbf at 15:49 and ought to form an afternoon return working back to Poland.
EC204 departs from Wien Hbf at 14:10 and ought to be formed out of an early morning inbound service from Poland.
12.10 in fact - 14.10 is EC102 which is formed off the early Katowice, as now.

I had assumed that the layovers would be tightened up to sweat the assets, but obviously PKP don't think like that.
 

Frothy

Member
Joined
19 Jul 2012
Messages
165
Location
Deepest darkest France
Something else that I've come across:

RJ 256/259 Wien Hbf-Praha Hl.N have been extended to/from Linz at the beginning/end of the day. Dep. Linz Hbf. 05.32, arrival from Prague 00.28. Given this is 2 hrs longer than the EC via Summerau, it's clearly not aimed at end-to-end traffic.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
Something else that I've come across:

RJ 256/259 Wien Hbf-Praha Hl.N have been extended to/from Linz at the beginning/end of the day. Dep. Linz Hbf. 05.32, arrival from Prague 00.28. Given this is 2 hrs longer than the EC via Summerau, it's clearly not aimed at end-to-end traffic.

The hour of operation doesn't look to be for peak volumes either. I wonder if it's because the situation of terminating in Vienna itself has become a bit desperate.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
The hours of operation (of RJ 256/259 Wien Hbf-Praha Hl.N extended to/from Linz) Dep. Linz Hbf. 05.32, arrival from Prague 00.28 doesn't look to be for peak volumes either. I wonder if it's because the situation of terminating in Vienna itself has become a bit desperate.
No - it replaces a Flughafen-Linz (and vv) which now terminates at Hbf so no change in stabling requirement, purely a destination swap.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
No - it replaces a Flughafen-Linz (and vv) which now terminates at Hbf so no change in stabling requirement, purely a destination swap.

Ah thanks.

=======

A slightly different aspect of the timetable -

The standard OeBB timetable for Vienna - Graz is 2 an hour, xx:24 (off Wien Hbf) semi-fast and xx:53 fast. All xx:24 continue to Villach but only half the of the xx:53 go to Villach

Westbahn's timetable from March of 5tpd (if confirmed) has Vienna departure times at xx:16, which is a fast path approximately mirroring OeBB's xx:53. If Westbahn's timetable eventually ramps up to one an hour (which appears to be Westbahn's intention), then Vienna - Graz will have a half-hourly fast service, and Vienna - Villach half-hourly with holes. That'll be a pretty good timetable and not far off OeBB Infra's 2024 target network.
 

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
I have acknowledged this topic is entirely academic, I have also said that in the context of Vienna itself the layout will probably work alright. This is an international section of a UK forum, so forgive me if my interaction is through the lens of 'what does this mean for the UK'. If this doesn't interest you you are welcome to read on.

Rolling stock utilisation is uneconomical. The infrastructure doesn't come free either - all at Hbf-Wbf mileage incurs variable wear and tear which will need to be paid for. Level crossing downtime carries a quantifiable economic cost.

I see you've qualified the 'conflict-free' with 'almost so'. IMO 'almost' isn't good enough for the most important and busiest node in Austria, and arguably the centre of the Central European rail network. I'll wait until platforming is published for the 2026 timetable, as each routing through Meidling carries its particular set of problems, and I don't want to list every possible eventuality.

Vienna's network is built for flexibility. The problem with building for flexibility is that the movements you end up having to accommodate almost always turn out to the ones you didn't design the infrastructure for. In this instance luck came to the rescue (that the Connecting Line and Westbahnhof happen to be available. For a rail-competent country it shouldn't have come to luck. Your point about the S80 project being controversial is an important one - we've created a dependency between ramping up long-distance services to the east and a controversial / low priority project. That dependency should never have existed in the first place. I recognise that there are probably credible mitigation options on the horizon that means what's currently an annoyance won't turn into a problem - i.e. by the time Polish and Slovakian ECs

I'm advocating for discipline. Build your infrastructure to send a very clear message how that infrastructure is intended to be used - as the Dutch have done at Utrecht. I've never mentioned turning a train around in 10 minutes - so I'd appreciate if you didn't try to misrepresent my point. A 10-platform face Ostbahnhof would be more than capable of turning around the long-distance services from Stadlau / Budapest.

'Bringing all long-distance services into one station' need not mean making everything work through. All that's needed would have been building the Westbahn connection. Westbahn could have been designated the specific direction to run through to the airport and Budapest. Instead of demolishing the entire old station, one could have kept (and marginally expanded) the old terminus stations and just built one or two through islands on the current Hbf station footprint for 4tph Westbahn - Airport - Hungary movements and S80, S60 and regional trains. You would not need additional yard space for terminating long-distance trains. I believe all that could be done for a lower cost than Hbf and the whole railway estate would be more land efficient.

As for 'there *will* be more through running in the future' - that's an article of faith, which has proven unreliable and I have no reason to believe it'll be reliable for the future. Through running relies far more on uniform fleet than terminus workings. Terminus workings only require fixed formation. With terminus workings you can have different train lengths and different top speeds on different sides - for through workings you need everything compatible. You've made two statements

1) so many of our trains are international ones and there will never be a uniform fleet
2) there *will* be more through running in the future

One statement will dominate the other and in my view it's clear that 1) will dominate for the foreseeable future. 200km/h PKP units on order will be no good for the 250km/h Koralmbahn (and Semmering from 2030) timings. The way things are evolving, you'll have more Westbahn coming from Graz more Regiojet coming from the north both with very different rolling stock strategies/requirements. I think the conditions for more terminating moves being required at Hbf in the future are already baked in.

I disagree that nobody could have foreseen the current operating pattern when Hbf was being planned - the major Austrian schemes were well underway, the Czech high-speed plans were being drawn up; the international nature of the Vienna node was probably even more clear back then and liberalisation wasn't a new thing either. The basic idea of a 2tph frequency per major direction per speed profile (basically what's in the 2040 target network) wouldn't have been controversial in the early 2000s (as you wouldn't have made the Westbahn and Koralmbahn investments for anything less).

There is probably enough spare capacity in the system for those 'run through and terminate on the other side' movements. For somewhere as strategic as Vienna, such spare capacity ought to be kept 'clean' as performance buffer, not clogged with ECS movements just because you can 'get away with it'.

If you don't want to engage with any of the above (and I won't be offended), my basic point is this -

Do I think the Vienna node is a success? On the whole, yes. Do I see it as a blueprint for other node improvement projects in Britain? Almost certainly not.

No, I do not intend to discuss it further,
a. Because I don’t feel it is a discussion, rather a very one-sided lecture,
b. Because I opened this thread to discuss the Austrian timetable 2026 and you hijacked it for something else entirely. Please open a new thread

Also I do not know how the UK now comes in. I would Never Dream about seeing Vienna as a blueprint for the UK because I cannot see a Single case there that would be in any way comparable. Quite apart from the fact that I am interested in UK railways but defer to the experts.

== Doublepost prevention - post automatically merged: ==

No - it replaces a Flughafen-Linz (and vv) which now terminates at Hbf so no change in stabling requirement, purely a destination swap.

It might be for efficient platform or more likely Rolling stock utilisation, both of which are good reasons.

However, in this case I think it is the wrong decision, as it was *the* train to reach the Vienna Airport morning departure bank.
 
Last edited:

NCT

Established Member
Joined
18 Apr 2025
Messages
2,095
Location
London
No, I do not intend to discuss it further,
a. Because I don’t feel it is a discussion, rather a very one-sided lecture,
b. Because I opened this thread to discuss the Austrian timetable 2026 and you hijacked it for something else entirely. Please open a new thread

Also I do not know how the UK now comes in. I would Never Dream about seeing Vienna as a blueprint for the UK because I cannot see a Single case there that would be in any way comparable. Quite apart from the fact that I am interested in UK railways but defer to the experts.

I had moved the topic on but seems you are intent on going over old grounds ...

As a point of order, the increase in the number of Hbf - Wbf moves and their operating in passenger service is a feature of the 2026 timetable.

I appreciate this is your thread. However, other participants will apply contexts and perspectives to a topic that might be different to yours. I don't know why you feel so affronted by it.

For the record, I don't intend on continuing with this either as I think we've both set out our stalls.
 

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
However, in this case I think it is the wrong decision, as it was *the* train to reach the Vienna Airport morning departure bank.

Sorry, got it wrong. The train I meant is RJ 821 which runs roughly one hour earlier.

== Doublepost prevention - post automatically merged: ==

As a point of order, the increase in the number of Hbf - Wbf moves and their operating in passenger service is a feature of the 2026 timetable.

I appreciate this is your thread. However, other participants will apply contexts and perspectives to a topic that might be different to yours. I don't know why you feel so affronted by it.

It is not "my" thread, but one about the 2026 timetable. While I agree that a discussion about the new passenger services Hauptbahnhof - Westbahnhof is perfectly legitimate, I do not see how it can lead to a general withering criticism about everything we built since 2000. It is not that I do not have criticism of my own - there is enough - but it remains OT and your criticism is much too broad and superficial (IMHO).

As it is, I am not really worried about the additional trains since they already run ECS and their long journey time between Westbahnhof and Meidling will preclude operational difficulties. In fact, I think they are put into passenger service because the Meidling stop has really grown in importance and it is worthwhile for passengers from the north to be able to reach it since the trains already run there. However, unlike at Hbf, there is no way to accomodate an extended stop at Meidling to check the train is empty, so this is done at Westbahnhof.

By way of example on another topic: I always thought and still think that the lack of integration of HS2 into the classic network in Birmingham and north thereof was a mistake. I have stated this in one of the gazillions of HS2 thread. I got rebuked, and that is fine: It is not my native country, not my country of residence, and above all it is not my money being spent. So right enough, I might have an opinion but I don't have a legitimate say and no one on RailUK needs to read my opinion more than once or maybe twice.
 
Last edited:

Top