• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Arriva Midlands

isaac27

Member
Joined
19 Sep 2025
Messages
86
Location
nuneaton
Has there been any indication on where Derbys Pulsars could go once displaced?
Could go to Tamworth and replace the versas maybe? Although some of derbys pulsars are getting on abit now so I can’t see them staying at wherever they go for long and it Sounds like tamworths 11 new electric busses aren’t happening either because they can’t install the charging infrastructure due to not enough electric supply apparently.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Could go to Tamworth and replace the versas maybe? Although some of derbys pulsars are getting on abit now so I can’t see them staying at wherever they go for long and it Sounds like tamworths 11 new electric busses aren’t happening either because they can’t install the charging infrastructure due to not enough electric supply apparently.

If that is the case, which given how long this has dragged on for, wouldn't surprise me, what other options are there?
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,523
Location
Derby
Could go to Tamworth and replace the versas maybe? Although some of derbys pulsars are getting on abit now so I can’t see them staying at wherever they go for long and it Sounds like tamworths 11 new electric busses aren’t happening either because they can’t install the charging infrastructure due to not enough electric supply apparently.
I think a few bus operators have found this out...
 

isaac27

Member
Joined
19 Sep 2025
Messages
86
Location
nuneaton
If that is the case, which given how long this has dragged on for, wouldn't surprise me, what other options are there?
Heard from somewhere that they would convert the e400mmc hopper busses to hybrid. But I realistically can’t see this happening.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Heard from somewhere that they would convert the e400mmc hopper busses to hybrid. But I realistically can’t see this happening.

Odd choice, how many is there?

I knew new buses for Tamworth seemed a bit optimistic, it's a bit of a kick in the teeth when you look at how much investment is going on elsewhere.
 

isaac27

Member
Joined
19 Sep 2025
Messages
86
Location
nuneaton
Odd choice, how many is there?

I knew new buses for Tamworth seemed a bit optimistic, it's a bit of a kick in the teeth when you look at how much investment is going on elsewhere.
There’s 9 in total Tamworth already have 1. I pretty sure it won’t happen as hybrid busses have never really been reliable.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
There’s 9 in total Tamworth already have 1. I pretty sure it won’t happen as hybrid busses have never really been reliable.

Hybrid seems to be old tech now for buses, it seems to be either straight diesel or electric, hydrogen is a non-starter too.

Just new MMC's would be a result at this point to be honest.
 

isaac27

Member
Joined
19 Sep 2025
Messages
86
Location
nuneaton
Hybrid seems to be old tech now for buses, it seems to be either straight diesel or electric, hydrogen is a non-starter too.

Just new MMC's would be a result at this point to be honest.
Don’t quote me but I’m fairly sure I seen somewhere that Birmingham city council made it a requirement for electric or zero emissions busses for a date in the future to enter Birmingham abit like Leicester is trying to do. This would cause problems on the 110. I’m not sure of they would make an exception for hybrids or ultra low emissions diesels like the new adl’s. We will have to see what happens in the near or not so near future but until they can get something sorted it looks like the e400s are staying.
 

citybus2500

Member
Joined
12 May 2021
Messages
184
Location
Birmingham
Don’t quote me but I’m fairly sure I seen somewhere that Birmingham city council made it a requirement for electric or zero emissions busses for a date in the future to enter Birmingham abit like Leicester is trying to do. This would cause problems on the 110. I’m not sure of they would make an exception for hybrids or ultra low emissions diesels like the new adl’s. We will have to see what happens in the near or not so near future but until they can get something sorted it looks like the e400s are staying.
There is no such requirement for Birmingham coming up. And anway, as is constantly mentioned on here, Arriva are due EVs for the 110.
Hybrid seems to be old tech now for buses, it seems to be either straight diesel or electric, hydrogen is a non-starter too.

Just new MMC's would be a result at this point to be honest.
Hybrids are very much still a thing elsewhere, both full and mild versions.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
There is no such requirement for Birmingham coming up. And anway, as is constantly mentioned on here, Arriva are due EVs for the 110.

Read back a few posts, I'm not sure where @isaac27 has heard it from, but there is doubt over the electrics...

I'm not one for rumours, but there is very little to contradict this claim at the moment.
 

isaac27

Member
Joined
19 Sep 2025
Messages
86
Location
nuneaton
There is no such requirement for Birmingham coming up. And anway, as is constantly mentioned on here, Arriva are due EVs for the 110.

Hybrids are very much still a thing elsewhere, both full and mild versions.
Yes they were and maybe still are due 11 byd deckers however now it’s come to electrify the depot they can’t install the required amount of chargers because the national grid has said they physically can’t supply that amount of electricity through the existing cables and infrastructure. National grid could upgrade the cables to the depot but this would take time and funding. Talks were now that derby lost the Nottingham university contracts they would look at turning these 9 e400 mmc’s into hybrids if they couldn’t get the cables upgraded and send them to Tamworth. I can’t realistically see them turning nearly 10 year old busses into hybrids. We will have to wait and see.

Edit (these byd’s were supposed to be arriving July/ August assuming the installation of the chargers went to plan)

== Doublepost prevention - post automatically merged: ==

This was also posted on the Arriva Facebook group earlier on this week which pretty much backs up what I heard from elsewhere regarding the electrification of Tamworth.
 

Attachments

  • IMG_8595.png
    IMG_8595.png
    479.3 KB · Views: 115
Last edited:

bringiton

Member
Joined
24 Feb 2024
Messages
645
Location
derby
This was also posted on the Arriva Facebook group earlier on this week which pretty much backs up what I heard from elsewhere regarding the electrification of Tamworth.
Tobias is well known by many for posting alot of fake information so i wouldn't count him much as a trust worthy source :)
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Tobias is well known by many for posting alot of fake information so i wouldn't count him much as a trust worthy source :)

Maybe so, but either way, something has clearly gone wrong with the introduction of the electrics that were first announced well over two years ago.
 

citybus2500

Member
Joined
12 May 2021
Messages
184
Location
Birmingham
Yes they were and maybe still are due 11 byd deckers however now it’s come to electrify the depot they can’t install the required amount of chargers because the national grid has said they physically can’t supply that amount of electricity through the existing cables and infrastructure. National grid could upgrade the cables to the depot but this would take time and funding. Talks were now that derby lost the Nottingham university contracts they would look at turning these 9 e400 mmc’s into hybrids if they couldn’t get the cables upgraded and send them to Tamworth. I can’t realistically see them turning nearly 10 year old busses into hybrids. We will have to wait and see.

Edit (these byd’s were supposed to be arriving July/ August assuming the installation of the chargers went to plan)

== Doublepost prevention - post automatically merged: ==

This was also posted on the Arriva Facebook group earlier on this week which pretty much backs up what I heard from elsewhere regarding the electrification of Tamworth.

Talk of conversion to hybrid is nonsense. And there is no requirement to anything better than Euro6 in the West Midlands.

The BYDs are due in December/January.

The depot was already an issue as it is likely to have to move within the next few years.


Tobias is well known by many for posting alot of fake information so i wouldn't count him much as a trust worthy source :)

Well given that they haven't ordered Electroliners for Tamworth, it doesn't start well!!
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
The BYDs are due in December/January.

The depot was already an issue as it is likely to have to move within the next few years.

These two points kind of contradict them selves, are you suggesting the electrics are still coming and there is no issue with fitting the charging equipment or not?
 

cnjb8

Established Member
Joined
26 Feb 2019
Messages
2,301
Location
Nottingham
Yes they were and maybe still are due 11 byd deckers however now it’s come to electrify the depot they can’t install the required amount of chargers because the national grid has said they physically can’t supply that amount of electricity through the existing cables and infrastructure. National grid could upgrade the cables to the depot but this would take time and funding. Talks were now that derby lost the Nottingham university contracts they would look at turning these 9 e400 mmc’s into hybrids if they couldn’t get the cables upgraded and send them to Tamworth. I can’t realistically see them turning nearly 10 year old busses into hybrids. We will have to wait and see.

Edit (these byd’s were supposed to be arriving July/ August assuming the installation of the chargers went to plan)

== Doublepost prevention - post automatically merged: ==

This was also posted on the Arriva Facebook group earlier on this week which pretty much backs up what I heard from elsewhere regarding the electrification of Tamworth.

These two points kind of contradict them selves, are you suggesting the electrics are still coming and there is no issue with fitting the charging equipment or not?
Either way ZEBRA funding was allocated to the 110 with BYDs ordered using this money so Arriva will need to do what they can to get them on the road. Its not unheard of to have new electric buses sitting unused for months or even years because of charging problems at depots
 

joieman

Member
Joined
18 Feb 2024
Messages
960
Location
Loughborough
Tobias is well known by many for posting alot of fake information so i wouldn't count him much as a trust worthy source :)
Me neither, a lot of the information he gives is quite outlandish. I mean, why merge the 16 back into the 127 when Arriva decided about ten years ago that they would be better run separately?
 

MylesW

Member
Joined
28 Nov 2025
Messages
15
Location
leicester
Me neither, a lot of the information he gives is quite outlandish. I mean, why merge the 16 back into the 127 when Arriva decided about ten years ago that they would be better run separately?
Same guy who was going around telling everybody that we were getting a new “X1” from Leicester to Birmingham, as well as that all the Temsa coaches were being scrapped and replaced with the Tourismos…
 

sharpley

Member
Joined
18 Aug 2018
Messages
318
One might think the solution is to move depot.
First Leicester got a brand new modern depot after the original Leicester City bus site was sold to developers Not a quick option towards electrification but the Tamworth garage is right in the town centre so you never know
 

SSmith2009

Member
Joined
20 Dec 2021
Messages
573
Location
East Midlands
First Leicester got a brand new modern depot after the original Leicester City bus site was sold to developers Not a quick option towards electrification but the Tamworth garage is right in the town centre so you never know
They relocated to Abbey Lane as they needed modern facilities and an earlier fire destroying parts of the storage sheds was also a factor in moving to the new site.

going off topic a bit - Centrebus had an issue with electricity supply/capacity so had a substation built onsite to allow them to operate electric buses from Wenlock Way.
 

joieman

Member
Joined
18 Feb 2024
Messages
960
Location
Loughborough
Same guy who was going around telling everybody that we were getting a new “X1” from Leicester to Birmingham, as well as that all the Temsa coaches were being scrapped and replaced with the Tourismos…
Oh yeah, I heard about the Tourismos!
 

sharpley

Member
Joined
18 Aug 2018
Messages
318
They relocated to Abbey Lane as they needed modern facilities and an earlier fire destroying parts of the storage sheds was also a factor in moving to the new site.

going off topic a bit - Centrebus had an issue with electricity supply/capacity so had a substation built onsite to allow them to operate electric buses from Wenlock Way.
Thurmaston had a dedicated 11kv substation installed for electrification too. that's fairly standard for these large charger installations. Maybe Tamworth garage doesn't have a nearby 11kv circuit it can tap into, or the circuit doesn't have the capacity to accommodate a new connection. Either way that's why network reinforcement might be required to electrify Tamworth garage.
 

Dwarfer1979

Member
Joined
24 Feb 2025
Messages
437
Location
Leicester
They relocated to Abbey Lane as they needed modern facilities and an earlier fire destroying parts of the storage sheds was also a factor in moving to the new site.

going off topic a bit - Centrebus had an issue with electricity supply/capacity so had a substation built onsite to allow them to operate electric buses from Wenlock Way.
My understanding is the substation is actually a fairly normal part of electrification of a bus depot, because bus depots need a high volume of electricity they need to be connected to the high power lines (charging a single bus via domestic connections can take days) but this needs to be stepped down to be suitable for charging - in the case of Centrebus I understand the high power line that needed to be connected to was actually running down the road outside so the connectional issues often experienced were minimised. It doesn't necessarily need to be on site but it does need to be close to reduce installation costs and minimise power loss as this is greater at lower voltages needed for actualy charging. The issue, I believe, for Centrebus and Arriva at Thurmaston was around getting the landlord of the depot site to agree to the location of this vital piece of infrastructure as the national grid look for relatively long term guarantees of substation location (50 year leases for instance) which mean landlords may not wish the equipment to be in the best site for the operator as it then becomes a restriction on what can be done with the site if the bus operator leaves. This equipment is not always obviously located and not all of the necessary equipment is clearly visible.

The big issue that operators find with electrifying a depot is that the high power line that they need to be connected to is a distance from the depot meaning the connectional costs can run into the millions which can be difficult to fund. You are starting to find 3rd party suppliers entering the market that will fund and install these connections on the basis that will now be a long term demand for these connections they can charge for generally as electrification becomes more generally widespread. The other issue operators running out of older depot buildings can find is that the building simply can't accomodate the charging infrastructure due to the stress on the fabric of the building and/or the space that has to be taken up to avoid it. With Arriva Tamworth it could be any of these or a combination of all of them, the site is very constrained due to its town centre location that means it may be difficult to make space for the connectional requirements, it may be some distance from the suitable lines with high enough power and the building may be difficult to install the charging infrastructure in.

I think part of the reason for First moving the depot was the old Abbey Park Road site remained owned by the council when the operator was sold, it may be that it wasn't worth buying at the price the council wanted given the costs that would have to be incurred to bring it up to standard and it very quickly was far larger than the operation needed but the site was big enough that they could have done the redevelopment in stages without moving off site if they had actually wanted to.
 

LAIRA

Member
Joined
25 Oct 2014
Messages
436
My understanding is the substation is actually a fairly normal part of electrification of a bus depot, because bus depots need a high volume of electricity they need to be connected to the high power lines (charging a single bus via domestic connections can take days) but this needs to be stepped down to be suitable for charging - in the case of Centrebus I understand the high power line that needed to be connected to was actually running down the road outside so the connectional issues often experienced were minimised. It doesn't necessarily need to be on site but it does need to be close to reduce installation costs and minimise power loss as this is greater at lower voltages needed for actualy charging. The issue, I believe, for Centrebus and Arriva at Thurmaston was around getting the landlord of the depot site to agree to the location of this vital piece of infrastructure as the national grid look for relatively long term guarantees of substation location (50 year leases for instance) which mean landlords may not wish the equipment to be in the best site for the operator as it then becomes a restriction on what can be done with the site if the bus operator leaves. This equipment is not always obviously located and not all of the necessary equipment is clearly visible.

The big issue that operators find with electrifying a depot is that the high power line that they need to be connected to is a distance from the depot meaning the connectional costs can run into the millions which can be difficult to fund. You are starting to find 3rd party suppliers entering the market that will fund and install these connections on the basis that will now be a long term demand for these connections they can charge for generally as electrification becomes more generally widespread. The other issue operators running out of older depot buildings can find is that the building simply can't accomodate the charging infrastructure due to the stress on the fabric of the building and/or the space that has to be taken up to avoid it. With Arriva Tamworth it could be any of these or a combination of all of them, the site is very constrained due to its town centre location that means it may be difficult to make space for the connectional requirements, it may be some distance from the suitable lines with high enough power and the building may be difficult to install the charging infrastructure in.

I think part of the reason for First moving the depot was the old Abbey Park Road site remained owned by the council when the operator was sold, it may be that it wasn't worth buying at the price the council wanted given the costs that would have to be incurred to bring it up to standard and it very quickly was far larger than the operation needed but the site was big enough that they could have done the redevelopment in stages without moving off site if they had actually wanted to.
What you have to remember when plugging in a bus to charge, when you flip the switch it is the same as putting 700 kettles on at the same time. Quote from a depot engineer on a visit to Plymouth depot.
 

sharpley

Member
Joined
18 Aug 2018
Messages
318
If anyone wants to see what large scale charging infrastructure can involve just pop up to Tamworth M42 services. A rapid charging hub for cars and lorries has been installed and required a Primary substation (33kv stepping down to 11kv) to be installed on site, then a few 11kv substations to step the voltage down to the 3 phase mains voltage to the chargers. Very expensive indeed. Whilst a bus garage won't need rapid chargers you can't just connect 20+ chargers without some infrastructure upgrades
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
If anyone wants to see what large scale charging infrastructure can involve just pop up to Tamworth M42 services. A rapid charging hub for cars and lorries has been installed and required a Primary substation (33kv stepping down to 11kv) to be installed on site, then a few 11kv substations to step the voltage down to the 3 phase mains voltage to the chargers. Very expensive indeed. Whilst a bus garage won't need rapid chargers you can't just connect 20+ chargers without some infrastructure upgrades

That took well over 3 years to complete!
 

Top