Then they did the design of the line up to Perth, when they stopped, and moved to the whole ECML, up as far as Aberdeen. The whole design for the whole line to Aberdeen is done, which is why there are sporadic bridge closures or rebuilding a between Dundee and Aberdeen, as the bridge rebuilding team moves from one bridge to the next around the country.
The reason they stopped at Perth, is that this was before COVID, and there was an expectation that Perth station would be remodeled at some point in CP7. Design work couldn't start, and indeed electrification cannot begin, until Perth is razed and rebuilt. The signalling, the layout, and the station are woefully inadequate, and the design team just moved on to somewhere else. Obviously COVID happened, and now there's less money and things are more expensive, so they haven't rebuilt Perth, so the design team haven't come back to finish the job.
mods note - split from this thread.
Fife Rail Electrification/Decarbonisation
This thread will be dedicated to the later phases of the ongoing Fife Circle Electrification project, and certain aspects around it. I’d like to ask an initial question. The B9130 road which goes over a cobble bridge at Markinch station is FAR too low to support any means of electric wires or...
Not wanting to derail the thread, but what were/are the plans for redeveloping Perth station?
This was my boyhood station, and electrification to Perth has always been something I've wanted to see.
I can't figure out how the station could be razed and redeveloped due to the listed status, and general NIMBYism which is so prevalent in the Fair City.