I know nothing is running in passenger service but I heard a train horn this morning near Hayes and harlington. Just curious.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Shimbleshanks

Established Member
Joined
2 Jan 2012
Messages
1,283
Location
Purley
Not exactly RUNNING as such but there are plenty of trains parked on the Brighton main line in Purley today. Our neighbour opposite has had a GBRf Class 66 chuntering away at the bottom of her garden since the small hours of the morning.
 

radamfi

Established Member
Joined
29 Oct 2009
Messages
9,267
Eurotunnel still runs 24 hours a day on Christmas Day, although at a reduced frequency.
 

petegunstone

Member
Joined
9 Oct 2014
Messages
30
I know nothing is running in passenger service but I heard a train horn this morning near Hayes and harlington. Just curious.

All kinds of horns on this service. Furthermore, the traction appears to be so devilishly reliable that it effortlessly deals with all manner of supply, infrastructure, timetable and pathing challenges. I would dearly like to know why it hasn't been deployed more ubiquitously. It would slash the quantity of digital ink spilt on this forum!

http://www.realtimetrains.co.uk/train/S73184/2015/12/24/advanced
 

VP185

Member
Joined
13 Feb 2010
Messages
401
No passenger services running on GWR but drivers will be booking on both Christmas Day and Boxing Day to go in and start the HSTs up to prevent flat batteries and for defrosting purposes (should the temperature dip below zero!)
 

broadgage

Member
Joined
11 Aug 2012
Messages
1,094
Location
Somerset
No passenger services running on GWR but drivers will be booking on both Christmas Day and Boxing Day to go in and start the HSTs up to prevent flat batteries and for defrosting purposes (should the temperature dip below zero!)

Sounds a waste of fuel and of costly overtime payment.
Could not a shore supply be used to keep batteries charged and engines warm ?
 

Tracked

Established Member
Joined
30 May 2011
Messages
1,338
Location
53.5440°N 1.1510°W
Thought I heard a train horn when I was walking home earlier, I'm just outside the centre of Doncaster. Didn't hear it come north though, and as it's fairly quiet outside I would expect to, could be something in the works I suppose?
 

73001

Member
Joined
2 Jun 2010
Messages
447
Location
Liverpool
Sounds a waste of fuel and of costly overtime payment.
Could not a shore supply be used to keep batteries charged and engines warm ?

I think the cost of setting this up, in several depots and stabling points across the area and essentially twice for each HST (at either end of the train) for 2 days a year would be prohibitive compared to the cost of a few hours overtime or the damage to an engine.
 

wensley

Established Member
Joined
29 Jun 2008
Messages
2,045
Location
On a train...somewhere!
Thought I heard a train horn when I was walking home earlier, I'm just outside the centre of Doncaster. Didn't hear it come north though, and as it's fairly quiet outside I would expect to, could be something in the works I suppose?

There are a total of 25 engineering trains required on the Marshgate and Doncaster South S&C renewals sites throughout the course of both projects. It'd more than likely be one of these trains manoeuvring within the worksite.
 
Last edited:

Tracked

Established Member
Joined
30 May 2011
Messages
1,338
Location
53.5440°N 1.1510°W
There are a total of 25 engineering trains required on the Marshgate and Doncaster South S&C renewals sites throughout the course of both projects. It'd more than likely be one of these trains manoeuvring within the worksite.

Thanks, just looking for stuff south of town, there was something moving around Doncaster Up Decoy at about that time :)
 

Finfanero

Member
Joined
27 Sep 2014
Messages
400
Location
Snaith
There are a total of 25 engineering trains required on the Marshgate and Doncaster South S&C renewals sites throughout the course of both projects. It'd more than likely be one of these trains manoeuvring within the worksite.

What's actually happening at Doncaster this weekend ?
 