Until they change the goalposts where Freight actually makes a meaningful amount to a business case then it isn't going to make a huge difference.
Well then, if there isn't alot of freight (if any) and the problem is low bridges could the tactics used on that Scottish branch (I can't remember if they banned frieght altogether or just electric freight) be used to avoid bridge works? Alternatively, if raising the bridges would also enhance the freight guage maybe that would strengthen the case?
I don't think the Scottish scheme I'm talking about had gaps in the wires. I think there was one 'neutral section', under one bridge where physical clearances were suffcient but electrical clearances weren't. The rest of the line I think was managed by planning clearances based on using particular types of EMU, rather than trying to make the route universally available.We seem to be going around in circles here. Network Rail have looked at that and concluded that there would be so many gaps in the wires that it would mean the Crewe-Chester shuttle would have to remain as DMU as there would be no suitable commuter EMU able to operate on the line.
I don't think the Scottish scheme I'm talking about had gaps in the wires. I think there was one 'neutral section', under one bridge where physical clearances were suffcient but electrical clearances weren't. The rest of the line I think was managed by planning clearances based on using particular types of EMU, rather than trying to make the route universally available.
I thought Network Rail looked at dis-continuous electrification because none of the tried and tested methods would work?
With regards to third rail isn't there an EU regulation forbidding it on overground lines except where it is replacing existing third rail?
Would singling the line allow electrification to proceed without massive bridge works all over the place?
Its relatively lightly used and dynamic loops should permit the existing timetable to be maintained....
Would require pretty much wholesale re-signalling.
I seem to remember that as part of the engineering work done around Highbury and Islington to Camden parts, at least, were converted to overhead ?.