This is the time and place where I remind all concerned that RTT is by no means official software, and how it chooses to display reasons for cancellations is entirely down to the third-party developers...
(...not that I don’t approve - I think it is a nice “Easter egg” feature!)
Tyrell Check said:12:35 Sheffield to Huddersfield due 13:50 will be terminated at Barnsley. It will no longer call at Dodworth, Silkstone Common, Penistone, Denby Dale, Shepley, Stocksmoor, Brockholes, Honley, Berry Brow, Lockwood and Huddersfield. It will be starting late from Sheffield and is expected to be 11 minutes late. This is due to slippery rails.
My favourite was on the London Underground: "Journeys are being delayed due to late running"
I know what they mean by it, but it seems like a tautology.I got a similar explanation from platform staff at South Kensington - which actually made some sense.
It was a wet Sunday and every family in London seemed to have decided to head for the museums. Crowded trains, extended dwell times, widening gaps. As the gaps widened the crowding got worse, the delays longer and the gaps ... wider. And as the gaps got wider, the crowding ...
(Repeat ad infinitum)
"Delays due to late running" is probably as easy and accurate as any other brief explanation.
Interesting in this case, it still ran from Barnsley to Huddersfield but ECS via Wakefield Kirkgate, meaning it was able to start back from Huddersfield near enough right time.Basically during the day some heavy delays have been steadily building up due to leaffall slippage and it's an attempt to get the service back to something like normal before the evening peak, this particular unit forming the 1708 off Huddersfield.
That's happened a few times lately, curtailing at Penistone (to Huddersfield) or Meadowhall (to Sheffield) are the usual ways of trying to this route back on time.Interesting in this case, it still ran from Barnsley to Huddersfield but ECS via Wakefield Kirkgate, meaning it was able to start back from Huddersfield near enough right time.
Indeed, well aware that it's due to leaf fall (using this line 3 or more days a week) just never seen that reason stated before!well let's think it through logically... what happens in Autumn? the trees decide they don't want their leaves anymore and the nasty trees drop them all over the lines... perhaps someone was trying to avoid the rail industry being a laughing stock for having problems with leaves on the line?
The definition of the codes shown on RTT do not correlate with the real meaning of the codes given in the Delay Attribution Board’s “Rules and Principles”, for example I2 is actually AC/DC Trip. In any case delay attribution is a far, far more complex beast than most outside the industry realise. Delay attribution is an internal rail industry process which just happens to occasionally leak into the outside world through open data feeds; fundamentally it isn’t meant for public consumption. You just have to trust* that the vague reasons given on RTT are correct and that the professionals who spend all day every day allocating each delay minute, full and part cancellation know what they are doing even if it appears odd and arcane from outside looking in.
*get it?
That's happened a few times lately, curtailing at Penistone (to Huddersfield) or Meadowhall (to Sheffield) are the usual ways of trying to this route back on time.
Its the section of route between Penistone and Huddersfield where the worst of the slippery rails occurs, so of course running empty via WKK gets round that.
My only issue is why can't they run 'in service' via WKK so any Huddersfield bound passengers don't have to wait 45 mins or so at Barnsley (assuming the next service is on time!)
As far as I know they do. It used to run from the Sheffield end and turn back at Lockwood due to the viaduct at Paddock being too weak for locos, but a decade or so ago it was repaired and can now take the RHTT at a maximum speed of 10mph.Don't they run the RHTT train on the Penistone line?
As far as I know they do. It used to run from the Sheffield end and turn back at Lockwood due to the viaduct at Paddock being too weak for locos, but a decade or so ago it was repaired and can now take the RHTT at a maximum speed of 10mph.
Don't they run the RHTT train on the Penistone line?
)IIRC it runs from York Thrall Europa in the wee hours of the morning.
It could do with running on the Aire & Wharfe lines too, the 321/322s in particular are starting to struggle but even the 333s aren't immune at the moment.
it does: Skipton is the furthest south point on the Carlisle circuit. Skipton is also the furtherst north point on the York>Leeds>Gascoigne Wood> Skipton> Ilkey>Leeds> Bradford>Halifax>Knaresborough>York Circuit
Foster Square doesn't seem to get treated
66431 & 432 today.tonight's has a stop at Baildon between 2230 & 2246. Not sure if this one still has 20's on it.
tonight's has a stop at Baildon between 2230 & 2246. Not sure if this one still has 20's on it.
where?![]()
Seems to be Holgate Road C.S. - it's scheduled start point is called York Thrall Europa
Don't they run the RHTT train on the Penistone line?