• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Alliance Rail GNWR Services Approved

Status
Not open for further replies.

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Scotland trains are rarely heavily loaded beyond Carlisle.

I have to concur with LNW-GW Joint's remarks about Scotland services. I saw a VT service at Preston (late running 09:54) - Pendolino and boarded the following TPE service (10:58) - Class 350 both going to Edinburgh and both were packed - this was a Thursday morning in June this year - the Class 350 was packed all the way to Edinburgh.
--- old post above --- --- new post below ---
You seem to misunderstand me.

How would you intend to serve Stoke, Macclesfield, Wilmslow etc. Where would the cuts be? What would you propose as stopping patterns? Perhaps someone on the forum would like to comment on your ideas as they affect the Potteries?

Surely one train would travel via Crewe and therefore serve Wilmslow on the way whilst the other would serve Macclesfield and Stoke en-route?
--- old post above --- --- new post below ---
But what service would you cull, it is all very well saying it only needs 2tph on each route, but what mitigation are you suggesting for the losses? I am with Philip C here with his post. Why doesn't Wilmslow warrant a service? I expect it makes a fair whack from wealthy Cheshire residents in its catchment area, more than say Runcorn would ever do.

Arguably the second Liverpool could call Warrington Bank Quay if Runcorn wasn't worthy of two services per hour.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,705
Location
Scotland
I have to concur with LNW-GW Joint's remarks about Scotland services. I saw a VT service at Preston (late running 09:54) - Pendolino and boarded the following TPE service (10:58) - Class 350 both going to Edinburgh and both were packed - this was a Thursday morning in June this year - the Class 350 was packed all the way to Edinburgh.
Maybe it's when I'm travelling, but I've caught Euston to Edinburgh/Glasgow services six or seven times over the last three months and none of them have been busy north of Lancaster. Definitely less than half the seats occupied. TPE services do tend to be busier - dare say that they sell a fair few AP tickets.
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
I suspect the right balance would be three Manchester and two Liverpool per hour, as HS2 propose.

Of course, there isn't enough capacity on WCML to do that. I'd suggest a franchise requirement for two Manchester and one Liverpool an hour and a fourth to one or the other and let the franchisee make their mind up.

The service that brings in the most money is probably the one that serves the most people too.
 

Camden

Established Member
Joined
30 Dec 2014
Messages
1,949
Haha! But the view from Manchester hey?

The subject was brought up though in relation to the spending of 50 odd bill on HS2. Rather than just rationalising services and using the line capacity better. I really disagree that three trains an hour is the right level for Manchester, I really don't think it is, especially if there are able to be interchange options from better service patterns.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Haha! But the view from Manchester hey?

The subject was brought up though in relation to the spending of 50 odd bill on HS2. Rather than just rationalising services and using the line capacity better. I really disagree that three trains an hour is the right level for Manchester, I really don't think it is, especially if there are able to be interchange options from better service patterns.

Camden, you can optimise line capacity all you like but it's not going to stop you needing a new line within the next few decades. You may as well build HS2 now before any more conflicting development is built and get the benefit from it sooner rather than later.
 

Philip C

Member
Joined
21 Feb 2013
Messages
407
Haha! But the view from Manchester hey?

The subject was brought up though in relation to the spending of 50 odd bill on HS2. Rather than just rationalising services and using the line capacity better. I really disagree that three trains an hour is the right level for Manchester, I really don't think it is, especially if there are able to be interchange options from better service patterns.

If the average Liverpool train is 75% full and the average Manchester train is 50% full there are TWICE the number of passengers travelling to Manchester as to Liverpool (3tph vs. 1tph). Making each service 2tph would make Liverpool trains 37.5% full and Manchester trains 75% full.

As pointed out by other posters there is no airline operating between Liverpool and London. National Express list 11 daily trips. Between London and Manchester there are 8 flights per day to Heathrow and National Express list 13 daily trips. I interpret this as meaning that the scope for a reduced Manchester service to lose traffic to other modes is significant, whilst there is little scope for additional Liverpool services eating into traffic currently using other modes.

You suggest that Wilmslow could do without its hourly train. Your posting (@#166) "With respect to Wilmslow, a small town doesn't necessarily warrant a direct link to London" ignores that this small town of more than 30,000 people acts as a railhead for a whole sweep of South Manchester and North Cheshire. It is an area disproportionately populated by those more likely to switch to airline rather than catch the local to Crewe and to change there. Passengers lost would be disproportionately first class ticket holders (George Osbourne seemingly excepted!). Wilmslow is also the natural point at which business traffic from 'Airport City Manchester', "a £800 million expansion of Manchester Airport currently under construction. The plan will follow an airport city model with the aim of stimulating the Greater Manchester economy by creating on-site logistics, manufacturing, office and leisure facilities" would most easily access the main line to London.

At posting #175 you make the comment that "but less explainable are large numbers of people going to Preston from London. Could it be used as a railhead for north Manchester and Liverpool areas? Where do they all disperse to if they are not still on the train when it departs Preston?" Perhaps they go to the Fylde or East Lancashire or even Preston itself? Why would people travel via Preston, on a train which will have called at Wigan if their destination is North Manchester or North Liverpool? Again "High numbers at Preston for Scotland has got to be Liverpool passengers who don't have a direct service" - why wouldn't they change at Wigan, unless they are all cramming onto the Ormskirk shuttle?

There may be a case for enhancing service provision to Liverpool but doing this at the expense of Manchester would be wrong. The railway geography, the competitive situation and the overall level of demand argue against it. I suspect that those specifying and providing services will continue to agree with me for a long time to come.

If the words "Haha! But the view from Manchester hey?" are indicative of this thread (which was originally about the GNWR development) descending into a sterile Merseyside versus Greater Manchester spat then count me out!
 

Camden

Established Member
Joined
30 Dec 2014
Messages
1,949
Camden, you can optimise line capacity all you like but it's not going to stop you needing a new line within the next few decades. You may as well build HS2 now before any more conflicting development is built and get the benefit from it sooner rather than later.
Is that really the case though? Yes if you want to run direct trains to all and sundry at high frequencies regardless of whether those trains are well used or not, but perhaps no if things are looked at differently. I think that HS2 will get built as far as Birmingham but I don't think it will go further based on the new politics of the Labour party.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
I think that HS2 will get built as far as Birmingham but I don't think it will go further based on the new politics of the Labour party.

Erm... What?

It's hardly anything to do with Labour in particular. There is opposition to the scheme across all parties and the project isn't particularly popular with the public either. Most people think it will only ever get to Brum, irrelevant of who is in power.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,705
Location
Scotland
The subject was brought up though in relation to the spending of 50 odd bill on HS2. Rather than just rationalising services and using the line capacity better.
You can rationalise all you want, but there's a fixed number of tracks and they can support a fixed number of trains. An passenger numbers are only going one direction.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,269
Location
Isle of Wight
Erm... What?

It's hardly anything to do with Labour in particular. There is opposition to the scheme across all parties and the project isn't particularly popular with the public either. Most people think it will only ever get to Brum, irrelevant of who is in power.

Phase 2 is far easier to justify politically and financially, if Phase 1 is built I see no reason to think that it won't be extended.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Surely a quick way of boosting Liverpool services without compromising Manchester's precious three trains an hour would be to extend one of the Manchester services to Liverpool via Chat Moss...? :idea:;)

It's hardly anything to do with Labour in particular. There is opposition to the scheme across all parties and the project isn't particularly popular with the public either. Most people think it will only ever get to Brum, irrelevant of who is in power.

Which would be ironic, as Brum is far too close to London to reap most of the benefits of High-speed Rail. If I was planning HS2, phase one would be a 'Y' shaped network from London to Manchester and Leeds with Birmingham being avoided... but I'm not... and in any case I'm well off-topic now!
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
At posting #175 you make the comment that "but less explainable are large numbers of people going to Preston from London. Could it be used as a railhead for north Manchester and Liverpool areas? Where do they all disperse to if they are not still on the train when it departs Preston?" Perhaps they go to the Fylde or East Lancashire or even Preston itself?

Or Barrow or Windermere. There is such a problem with overcrowding on those TPEs (as with all the others) that it can be best to board at Preston rather than Lancaster. Much less stressful.

Why would people travel via Preston, on a train which will have called at Wigan if their destination is North Manchester or North Liverpool? Again "High numbers at Preston for Scotland has got to be Liverpool passengers who don't have a direct service" - why wouldn't they change at Wigan, unless they are all cramming onto the Ormskirk shuttle?

If a journey I'm doing requiring a change has a section of line in common, it varies as to where I change. If I know one of the trains will be overcrowded, I tend to change such that I get a seat for the maximum time possible. If I'm comfortable on the first train I might stay on it. If the connection is too long at one station and the first train is slower, I might stay on it to waste time. The availability of split Advances might be better at Preston than Wigan. Preston has a better choice of on-station catering than Wigan.

A few reasons, IOW.

There may be a case for enhancing service provision to Liverpool but doing this at the expense of Manchester would be wrong. The railway geography, the competitive situation and the overall level of demand argue against it. I suspect that those specifying and providing services will continue to agree with me for a long time to come.

For London I'd agree, though I do toy with the idea that 2tph to Manchester from London with 4tph peak would make more sense than 3tph of fresh air, and would allow enhanced south Manchester local services. But it could be firmly argued that those locals don't need increasing in frequency until they're 12-car 20m EMUs (or 10-car 23m if you prefer) full and standing rather than silly little capacity-wasting 16m 2-car DMUs.

For Scotland I do wonder if returning to portion working as XC did with the 158s might make sense.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,705
Location
Scotland
For Scotland I do wonder if returning to portion working as XC did with the 158s might make sense.
XC with 158's or TPE with 185's?

Edit: That was before I came back to the UK, never knew they did that. Would've thought even XC didn't hate their customers enough to subject them to Manchester-Edinburgh in a 158!
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
XC with 158's or TPE with 185's?

XC used 158s to portion work Liverpool/Manchester to Scotland services, two per day I think, in the late 1990s prior to the North West frequency increases of the 1998 timetable. The Manchester one was a double portion working - it left Manchester Airport attached to a NWRR/NWT/fNW Windermere train, split from that at Bolton (the Windermere went via Wigan), continued on its own Bolton-Preston, then joined the set from Liverpool at Preston and proceeded north. I have half a feeling, but am not 100% sure, that it split again further up with half to Glasgow and half to Edinburgh.

I suppose that could be (approximately) recreated using 185s or (better) 350s.
--- old post above --- --- new post below ---
Edit: That was before I came back to the UK, never knew they did that. Would've thought even XC didn't hate their customers enough to subject them to Manchester-Edinburgh in a 158!

Notably they never received Virgin livery, as VT were a bit embarrassed about them. Though they did have InterCity red seating, a smoking compartment (!) and proper 2+1 First Class!

I don't mind 158s, though. Some of the refurbs with the tombstone seats, particularly the lower density ATW variant (or perhaps better the ScotRail Inverness sets as the colour scheme is nicer), are excellent units. Only real problem with them[1] was that they were, in the background of a declining railway, built too short.

[1] The seat pitch also felt a bit miserly, but that was mainly the seat design; those refurbs replacing them with more upright seating have increased legroom noticeably without affecting pitch.
 
Last edited:

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,705
Location
Scotland
I don't mind 158s, though. Some of the refurbs with the tombstone seats, particularly the lower density ATW variant, are excellent units. Only real problem with them was that they were, in the background of a declining railway, built too short.
Don't get me wrong, I don't object to a 158 journey either, but they really aren't suited to the inter-city role. Having done Edinburgh/Glasgow to Preston on 185's a few times I think a 158 would be taking the Michael.
 

miami

Established Member
Joined
3 Oct 2015
Messages
3,305
Quite excited by the idea of a Crewe-Queens Park service. It's a shame they didn't wire down as far as SPB when it opened.

Any predictions for when it would likely run? Presumably arrivals into London from about 12-16 and 19 onwards, with departures 10-14 and 20 onwards?

As for a 6 car train, if it's 1 car in First, and 5 cars in standard, that's about the same real capacity as a 9 car pendilino anyway. I'd rather a real train (with leg room and mobile phone signal and a power socket per seat) rather than these stinky excuses, but you can't win them all.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Another thing to note is that GNWR have only been granted firm rights for calls at Crewe, Preston and Poulton-le-Fylde. Queen's Park - Euston and calls at Milton Keynes Central, Nuneaton, Tamworth, Lichfield Trent Valley and Kirkham & Wesham are all on a contingent basis, thus dependent on network capacity.

The Trent Valley stops are probably quite lucrative - well, I'd imagine so. GNWR are/were also planning to operate a daily service from Hartford to Euston and return also calling at these stations. Rugeley and Atherstone seem to be missing out on some calls...
 

JaJaWa

Established Member
Joined
14 Feb 2013
Messages
1,734
Location
⠀
Quite excited by the idea of a Crewe-Queens Park service. It's a shame they didn't wire down as far as SPB when it opened.

Any predictions for when it would likely run? Presumably arrivals into London from about 12-16 and 19 onwards, with departures 10-14 and 20 onwards?

As for a 6 car train, if it's 1 car in First, and 5 cars in standard, that's about the same real capacity as a 9 car pendilino anyway. I'd rather a real train (with leg room and mobile phone signal and a power socket per seat) rather than these stinky excuses, but you can't win them all.

How does a 6 car Pendolino have the same capacity as a 9 car Pendolino?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,108
Location
Redcar
How does a 6 car Pendolino have the same capacity as a 9 car Pendolino?

Alliance and Alstom have engaged the services of a Doctor with experience in making things bigger on the inside than the outside?
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
Alliance and Alstom have engaged the services of a Doctor with experience in making things bigger on the inside than the outside?

Does that mean we can expect such facilities as a library and swimming pool on board? As I'm sure they appear in at least one other vehicle he's been involved with.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,442
Perhaps he meant it will have the same number of standard class seats?

It probably wont have that many standard class seats. One first class coach wont be enough, it would probably have two. Also, if they are using 6 coach trains I suspect that the new design will be for 20m coaches rather than 23m. Reducing the coach size would mean that 6 coach trains could be doubled up like Voyagers whem neccessary. 12 x 23m is too big for most stations (the driving units are 25m meaning an overall length of 280m). 6 x 12 (240m) would fit. It would be pretty crazy to have a 140m unit that is virtually the smallest size that is too big to double up.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
It probably wont have that many standard class seats. One first class coach wont be enough, it would probably have two. Also, if they are using 6 coach trains I suspect that the new design will be for 20m coaches rather than 23m. Reducing the coach size would mean that 6 coach trains could be doubled up like Voyagers whem neccessary. 12 x 23m is too big for most stations (the driving units are 25m meaning an overall length of 280m). 6 x 12 (240m) would fit. It would be pretty crazy to have a 140m unit that is virtually the smallest size that is too big to double up.

Reducing the Pendolinos to 20m carriages (versus the ~24m they are today) would have a serious effect on their passenger capacity which would probably be enough to negate any benefit that might come from being able to double them up. Train carriages are getting longer and longer because the amount of space needed for the doors, toilets etc remains pretty much constant regardless of the length, so the extra length can be used solely for seating.

Which stations on the WCML core could not take a 280m long train? I'm aware of the problems at many of the terminus stations, which make 11-car the limit for a single unit, but if a few doubled-up six-car Pendolinos could fit at Euston and the major intermediate stops on the WCML it could allow two smaller destinations to be served by the same WCML path.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
Euston and Watford could fit them I reckon (they fit the Sleeper). MKC is a bit short (which is a shame, as a Sleeper stop there would make more sense than Watford).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
Fall back which is likely to last a long time, just cannot see how they are going to get into Euston once HS2 construction starts.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Fall back which is likely to last a long time, just cannot see how they are going to get into Euston once HS2 construction starts.

They have only got approval for 6 services per day which might make things easier, originally they were trying to get paths for 12 services per day (6 x Blackpool and 6 x Leeds via Warrington.)
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Just out of interest (perhaps I am a 'low cost' 'Ouigo' type contributing here :) ) if I lived at Blackpool and wanted a fast cheap ticket service to the London area, I would not care twopence if the train got me to Euston or Queens Park. The Bakerloo is at hand and buses, so good enough. I presume that NWR, or whatever they will be called, has done the market research?
 
Status
Not open for further replies.

Top