• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Airport stations that are not through stations

Status
Not open for further replies.

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
A point that seems somewhat of a conundrum for rail planners (well, transport planners) is the difference between an airport that is not near a mainline that passes through and one out in the sticks that is not on the way to anywhere.

Examples of the latter are - Heathrow (!!!), Stansted, Bristol (coach transfer), Manchester.

Ones which are conveniently inline are Gatwick, Southampton and Brum.

This means that the last can be served by services that are passing through anyway. It was calculated by Dr (Lord) Mawhinney's report on the Heathrow access that only 10% maximum of HS2 pax would be destined for an airport and so he recommended a shuttle from OOC would do the job.

Nevertheless, airline pax usually have luggage so the difference between asking them to change is whether they view the transfer as a 'people mover' or a new train. Even at Gatwick, one has to get on a people mover to get to the northern terminal.

I don't know what the patterns of access are at Manchester, but doubtless our north west correspondents will have a better idea.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
A point that seems somewhat of a conundrum for rail planners (well, transport planners) is the difference between an airport that is not near a mainline that passes through and one out in the sticks that is not on the way to anywhere.

Examples of the latter are - Heathrow (!!!), Stansted, Bristol (coach transfer), Manchester.

Ones which are conveniently inline are Gatwick, Southampton and Brum.

This means that the last can be served by services that are passing through anyway. It was calculated by Dr (Lord) Mawhinney's report on the Heathrow access that only 10% maximum of HS2 pax would be destined for an airport and so he recommended a shuttle from OOC would do the job.

Nevertheless, airline pax usually have luggage so the difference between asking them to change is whether they view the transfer as a 'people mover' or a new train. Even at Gatwick, one has to get on a people mover to get to the northern terminal.

I don't know what the patterns of access are at Manchester, but doubtless our north west correspondents will have a better idea.

But what about people boarding HS2 at Brum International bound for the city centre? Couldn't the shuttle be extended to Curzon St?
 

JGR

Member
Joined
31 Jan 2012
Messages
147
Location
Ipswich
Heathrow and Stansted are themselves convenient termini for services to other places of interest en route. The Piccadilly line and Cross Country Birmingham to Stansted services, for example.
Not being on a mainline is not necessarily a problem, as an airport is a destination in its own right to some extent.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The Manchester Airport link was authorised by the British Railways Act 1984, though construction didn't start until 1990 or 91. The authorised route included not only the line that now exists, but also a reversing loop which has never been built, and now never will be. It would have continued WSW through the airport station, then curved to the right, crossing the M56 airport spur, and finally merged with the line heading back east towards the Styal line.

If built, it would have allowed through north-south services on the Styal line to be diverted via the airport, and the airport station would not have been cluttered up with trains originating, terminating or reversing.

Today the airport station is primarily a starting and terminating point for trains which run to and from routes all over the north via Manchester Piccadilly.

The station originally had two platforms. A third was added in 2008, and a fourth started construction in about September 2013. This is in addition to the Metrolink platform which started construction in 2011. Future westward extension remains a possibility, both for the Metrolink line and the heavy rail line.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
The station originally had two platforms. A third was added in 2008, and a fourth started construction in about September 2013. This is in addition to the Metrolink platform which started construction in 2011. Future westward extension remains a possibility, both for the Metrolink line and the heavy rail line.

Thanks very much. I note that HS2 passes within a half mile of the terminal. Is this a case for a people mover or this western extension to link with it? I appreciate that the HS2 line is supposed to be a dead end at Piccadilly and I wonder if the links have been properly thought about?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,741
Location
Nottingham
Thanks very much. I note that HS2 passes within a half mile of the terminal. Is this a case for a people mover or this western extension to link with it? I appreciate that the HS2 line is supposed to be a dead end at Piccadilly and I wonder if the links have been properly thought about?

Assuming you are referring to Manchester Airport.

A people mover is quite possible. The HS2 station is also quite near a section of Metrolink which was planned but never built, and would have made the Metrolink airport extension loop back to itself near Wythenshawe hospital. Quite possible this will be built to improve access to HS2 from the various parts of southern Manchester that the Metrolink airport route passes through.

However I don't think the heavy rail loop will ever be built - it has probably been blocked by other development and heavy rail will have good interchange with HS2 at Piccadilly. It was probably only ever worthwhile when there were significant numbers of loco-hauled trains, as a MU or push-pull can probably reverse in the station in the length of time it would take to go round the loop.

HS2 as currently planned will have a triangular junction for the Manchester branch, so that trains could run from Piccadilly via the airport station and then turn northwards. There are no plans to do so in service at present (it's mainly to provide access to the depot site near Wigan) but particularly if HS2 is extended from Wigan to Scotland it might be worth running Manchester-Scotland trains that way.
 

NorthernSpirit

Established Member
Joined
21 Jun 2013
Messages
2,277
Just a thought, what if the current Leeds Bradford Airport at Yeadon was built in its original intended place at Clifton, Hartshead Moor? (the site is now occupied by a golf course). As Brighouse, Clifton Road closed in the 1930's.

Considering that its half a mile to where the airport would have been, would the railway station at Clifton Road be reopened or would the line been diverted through a tunnel to the site considering that the historic village of Clifton was above so no cut 'n' cover was possible?
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
There are through trains calling at Manchester Airport. The half hourly Manchester Picc to Crewe local trains call there using the triangular Junction at Heald Green. So, in effect, it could be called a through station even if this service has to reverse there.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
However I don't think the heavy rail loop will ever be built - it has probably been blocked by other development and heavy rail will have good interchange with HS2 at Piccadilly. It was probably only ever worthwhile when there were significant numbers of loco-hauled trains, as a MU or push-pull can probably reverse in the station in the length of time it would take to go round the loop.

I'm sure the loop won't be built, but a westward or south-westward heavy rail extension remains a possibility, to connect with the Mid-Cheshire line.

As Joseph Locke has pointed out, there is space to realign Platform 2 slightly southward, towards Platform 1, and extend those two tracks, narrowly missing the south side of the station building. However a cut-and-cover tunnel would be required under the apron near Terminal 2.
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,714
East Midlands Parkway is a through station but I never get if that was built to serve East Midlands Airport or to serve as an East Midlands Park and Ride station. Luton Airport Parkway is also a through station.

My Uncle was the chief architect for Manchester Airport station, I should ask him why its designed how it is.
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
But what about people boarding HS2 at Brum International bound for the city centre? Couldn't the shuttle be extended to Curzon St?

Why?? Pax from BHX airport heading to the city centre would do better to travel from International to New Street. It makes no sense to travel out to the HS2 Interchange and then come back to Curzon Street. The transit time to HS2 Interchange is likely to be a further 5-10 minutes. Then there is the frequency - how many tph will there be from Interchange to Curzon Street?

BHM-BHI is 9tph and generally takes 10-16 minutes. Even on a stopper there's no time advantage to using HS2 via a longer route, if going to the centre. Going to HS2 Interchange only makes sense if heading away from Brum.
 

Lrd

Established Member
Joined
26 Jul 2010
Messages
3,018
The half hourly Manchester Picc to Crewe local trains call there using the triangular Junction at Heald Green. So, in effect, it could be called a through station even if this service has to reverse there.
That's a through service using a terminus station though. A through station has tracks that run though the station.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
That's a through service using a terminus station though. A through station has tracks that run though the station.

I suppose I wasn't being too finicky when I opened the thread, seeing that modern trains are driveable from both ends. It was more the convenience to pax vs the need to change vs the possibility that airport terminating trains will always run with nearly empty coaches for the last stretch, given Mawhinney report findings.

I wonder how full the Stansted ones are after they leave Bishops Stortford? In my neck of the woods, the issue is about running trains from London through from BRI to WSM to which very few pax are destined. In that case, local commuter pax can take up some of the space. With Stansted it could only be airport workers who add to the load?

Edwin_m 's mention of trains to Scotland from Manchester Airport is interesting.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Edwin_m 's mention of trains to Scotland from Manchester Airport is interesting.

Those would be HS2 trains from Manchester Piccadilly to Scotland via Manchester Airport (HS2) station.

There are already trains from Manchester Airport to Scotland via Piccadilly.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
A third was added in 2008, and a fourth started construction in about September 2013. This is in addition to the Metrolink platform which started construction in 2011. Future westward extension remains a possibility, both for the Metrolink line and the heavy rail line.

I understand the possible future western link was taken in consideration when considering where to position platforms 3 and 4.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I understand the possible future western link was taken in consideration when considering where to position platforms 3 and 4.

Or to be more exact, when placing the third platform (now platform 1) and the fourth platform (to be platform 4).
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Or to be more exact, when placing the third platform (now platform 1) and the fourth platform (to be platform 4).
As I understand it, the through platforms would be the present Platform 1 (the third to be constructed) and Platform 2. Platform 3 and the not-yet-completed Platform 4 would remain terminal platforms.

The western link features in the Manchester Airport Master Plan to 2030. It would curve south-west, passing under the present apron and cargo area, and join the Mid-Cheshire line between Ashley and Mobberley. It would enable through services to Chester and North Wales, and would also enable services from the north via Manchester to continue in a loop, returning to the WCML via the Hartford chord (and vice-versa).

I guess another possibility might be services to Crewe and Stoke via Northwich and the Middlewich branch to Sandbach, to supplement the present service via Styal and Wilmslow.
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
As I understand it, the through platforms would be the present Platform 3 and the not-yet-completed Platform 4. Platform 1 (the third to be constructed) and Platform 2 would remain terminal platforms.

[Edit: this post is now a bit pointless as Greybeard has edited his post to agree with me.]

I think the station building would be in the way of any direct extension to either the platform 2 or 3 lines (the two original lines). I think the early plan for the reversing loop had been dropped by the time the station building was designed, and the idea of any other western extension had not yet arisen. The original station building is symmetric about a line midway between these two platforms.

I think the link building to the ground transport interchange would be in the way of any extension to the future platform 4 line.

I think any westward heavy rail extension would have to be, as I said above, of the platform 1 line and a slightly diverted version of the platform 2 line.

As for the Metrolink lines, the link building is designed to allow a wall to be demolished to allow their extension to pass through its basement and under the roads in front of the building's west face.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
I think the station building would be in the way of any direct extension to either the platform 2 or 3 lines (the two original lines). I think the early plan for the reversing loop had been dropped by the time the station building was designed, and the idea of any other western extension had not yet arisen. The original station building is symmetric about a line midway between these two platforms.

I think the link building to the ground transport interchange would be in the way of any extension to the future platform 4 line.

I think any westward heavy rail extension would have to be, as I said above, of the platform 1 line and a slightly diverted version of the platform 2 line.

As for the Metrolink lines, the link building is designed to allow a wall to be demolished to allow their extension to pass through its basement and under the roads in front of the building's west face.
Yes, sorry, I had a memory lapse - I will correct my previous post. I agree that Platforms 1 & 2 (the southernmost ones) would become the through platforms, with the Platform 2 line moved over parallel with that of Platform 1. As you said, the third platform (now 1) was aligned with the western link in mind (hence the current large gap between the tracks).

The Metrolink extension would curve northwards under the link building as you say, crossing the M56 to the site of the proposed HS2 station at Davenport Green.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
The Metrolink extension would curve northwards under the link building as you say, crossing the M56 to the site of the proposed HS2 station at Davenport Green.

Are there any plans for how the extensions interface with the proposed HS2 Interchange station? The published plan I have (dated Dec 2012) does not mention it.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Are there any plans for how the extensions interface with the proposed HS2 Interchange station? The published plan I have (dated Dec 2012) does not mention it.

I don't think the heavy rail extension, if built, would interface directly with HS2.

No plans have been published in recent years for a Metrolink extension, but an old version, showing the once-proposed airport loop, is here. This dates from long before HS2's route was announced.

The Metrolink route currently under construction generally follows the eastern side of the loop shown here from Roundthorn to the airport. If the western side were built in future, the stop shown at Davenport Green would be close to the HS2 station and would doubtless be developed into an interchange, possibly with some modification of the Metrolink route or stop location. There is also a possibility of some sort of people mover between the two airport stations but it's very non-specific at present.
 
Last edited:

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,515
East Midlands Parkway is a through station but I never get if that was built to serve East Midlands Airport or to serve as an East Midlands Park and Ride station. Luton Airport Parkway is also a through station.

My Uncle was the chief architect for Manchester Airport station, I should ask him why its designed how it is.

I remember hearing quite a few years ago that a rail corridor to Luton airport had been reserved ,I see the present Luton ,East Midlands and Liverpool parkways as cut price compromises relying on bus connections rather than proper integrated airport stations which I know is better than nothing ,but considering the boom in rail travel in the last 20 years it's slightly surprising southend is the only proper airport station constructed since Manchester
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There's an item on the TPE website about replacement of overnight Manchester Airport - Piccadilly services by buses, for platform 4 works. I think this is the first official admission by any relevant body that platform 4 works have started.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
I remember hearing quite a few years ago that a rail corridor to Luton airport had been reserved ,I see the present Luton ,East Midlands and Liverpool parkways as cut price compromises relying on bus connections rather than proper integrated airport stations which I know is better than nothing ,but considering the boom in rail travel in the last 20 years it's slightly surprising southend is the only proper airport station constructed since Manchester
In my experience the bus connection between Liverpool South Parkway station and John Lennon Airport is reasonably quick and frequent. South Parkway, being at the confluence of three lines, has the advantage of through services to many destinations in different directions. I think the airport would have to grow a lot to justify an integrated station.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
In my experience the bus connection between Liverpool South Parkway station and John Lennon Airport is reasonably quick and frequent. South Parkway, being at the confluence of three lines, has the advantage of through services to many destinations in different directions. I think the airport would have to grow a lot to justify an integrated station.

I think the worst thing about the bus link is Arriva's policy of having a standard single price for Merseyside (that is expensive for a short journey) and not offering a cheaper period return ticket.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,322
It is surely ridiculous that Crossrail actually passes under the apron of the London City airport, a very busy airport nowadays, but there is no station.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
It is surely ridiculous that Crossrail actually passes under the apron of the London City airport, a very busy airport nowadays, but there is no station.

I think the problem there is there's no space to put a station building anywhere. Plus it's not particularly close to the airport terminal.
 
Status
Not open for further replies.

Top