150222
Member
- Joined
- 9 Jul 2011
- Messages
- 1,002
Not provided by Northern and not on every service (and is it even provided outside of summer?).
I know im just saying. Fair comment though.
Not provided by Northern and not on every service (and is it even provided outside of summer?).
Yes, there are "plans" to wire the TPE line through Leeds - my comment was about the fact that Lancashire won't need any 158s "back" (since its definitely getting more electrification/ additional units in the cascades). Really, the "Lancashire" 158s are now in Scotland anyway, and not in Yorkshire.
my comment was about the fact that Lancashire won't need any 158s "back"
The Sheffield - Hull/ Scarborough service runs via Goole, which I doubt would be electrified? There are enough question marks over the swing bridge at Selby (meaning that Leeds - Selby - Hull may not be wired?)...
I was about to say the 158s were for Liverpool - Manchester Airport, but that'll be going over to EMU operation when electrified so there'd be no point repatriating them.
Ah OK I didn't realise it went via Goole
One might wonder what Hull Trains would use for such a service...
Since there is no standard 125/140mph EMU around at the moment...
Since there is no standard 125/140mph EMU around at the moment...
180's aren't exactly standard are they ?
Surely the 390 is the standard 125/140mph EMU at the moment? Or even the 395 (with suitable modifications for long distance inter-city running)?
Well boys,
i was speaking to a ticketman at Horsforth station and he told me who's Northern's successor will be.........DRUM ROLE...........................FIRST!!
It seems a little odd that the only service available at the southern end of the Humber Bridge offers only 9 trains per day and no winter Sunday service at all. It is the scarcity of a service that leads potential passengers to find alternatives which, in turn, gives NR a reason to claim there is no demand and consequently withdraw services completely