When Old Oak Common is built, is the plan to close Acton Main Line?
I dont think so mind you its not used by many trains I think one all station to Paddington an hour. (expecting to be corrected on that.)
Currently the 2tph Paddington to Greenfords stop. From Crossrail, the frequency is doubling to 4tph, a new station building is being built, a new footbridge, step-free access improvements, platform extensions for 10 cars, new platform canopy, and passenger info systems.
Aren't all platforms (including Acton) being extended to 12 car - or as long as possible?
Aren't all platforms (including Acton) being extended to 12 car - or as long as possible?
http://www.crossrail.co.uk/news/art...act-awarded-network-rail-release#.T7AJqsWaU08
This states Crossrail will be 10 coach trains, so that's the length the platforms are being extended to.

What I meant to say was that I assume there will be the possibility to add 2 carriages as and when extra capacity is required [to most stations, certainly those in the core tunnel].
What I meant to say was that I assume there will be the possibility to add 2 carriages as and when extra capacity is required [to most stations, certainly those in the core tunnel].
The deep tunnelled stations are going to be long enough to allow for the possibility of future 240m trains, but only fitted out for 200m initially.
A similar idea (but on a larger scale) to the Tyne Wear Metro's 3 car tunnels that are only fitted out for two cars, there's a load of space behind the false headwalls.
This sort of future proofing would not normally be necessary on the surface stations - as long as space is available they'd just build 200m platforms initially.