Just looked on AIVR. 29/11/2005.

This is now connected at Acton Wells Jc and the crossover on the UP side of Acton Main Line. Theoretically through trains could now operate.
It is not connected on the down side end of Acton ML via the freight sidings as the cables just end before the underpass over junction.
Is there a placing into service date known for the full section?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,711
Location
Nottingham
This video includes a virtual flythrough of the scheme and dates for energisation and entry into service.

 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,534
Location
Preston Lancs
Great video. So energisation on Dec 27th and test trains likely ( but not stated) January, February and March.
 

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
27th December 0400
That's when it will be fully energised and ready for testing, snagging and handover to maintenance etc. It wont be available for service trains quite yet.

== Doublepost prevention - post automatically merged: ==

Great video. So energisation on Dec 27th and test trains likely ( but not stated) January, February and March.
Pretty much. :)

It should be available for normal traffic by Easter.

== Doublepost prevention - post automatically merged: ==

This video includes a virtual flythrough of the scheme and dates for energisation and entry into service.

Loving the typo in there. "Acton Drive-under"

1766151724624.png
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,935
Location
Mold, Clwyd
Diversion of (electric) passenger trains during OOC construction is mentioned in the video, but that's not planned is it?
There's still no electrified link into Euston or the West London Line, only to the North London Line for ECS and potentially freight moves.
Bi-modes will still be needed to reach Euston.
 
Last edited:

sad1e

Member
Joined
26 Aug 2024
Messages
1,034
Location
London
Diversion of (electric) passenger trains during OOC construction is mentioned in the video, but that's not planned is it?
There's still no electrified link into Euston or the West London Line, only to the North London Line for ECS moves.
Bi-modes will still be needed to reach Euston.
Would be a Very long diversion but they could stick some electric trains into Liverpool st once the electrification is available for service trains.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,266
Diversion of (electric) passenger trains during OOC construction is mentioned in the video, but that's not planned is it?
There's still no electrified link into Euston or the West London Line, only to the North London Line for ECS and potentially freight moves.
Bi-modes will still be needed to reach Euston.
The diversion is to allow 345 units operating Ealing - western destinations shuttles to get back to depots either OOC or Ilford for maintenance rather than in service passenger use.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,711
Location
Nottingham
The diversion is to allow 345 units operating Ealing - western destinations shuttles to get back to depots either OOC or Ilford for maintenance rather than in service passenger use.
Not sure if the 80x diverted into Euston will use this electrification but they will still have to revert to diesel, as there is a non-electrified section beyond Acton Wells on that route.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,313
Not sure if the 80x diverted into Euston will use this electrification but they will still have to revert to diesel, as there is a non-electrified section beyond Acton Wells on that route.
This was described back earlier in this thread, where a key problem on such short connections is installing neutral sections between the different electrification systems in place where they are not impractical given signals, gradients, junctions, etc.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
This was described back earlier in this thread, where a key problem on such short connections is installing neutral sections between the different electrification systems in place where they are not impractical given signals, gradients, junctions, etc.

Yes, but… that issue is resolved with this electrification.

Were the stretch through Willesden SW sidings electrified, it would all be on the same feeder AIUI, ie Acton Lane. (i might be wrong of course).
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,625
Location
Northampton
Yes, but… that issue is resolved with this electrification.

Were the stretch through Willesden SW sidings electrified, it would all be on the same feeder AIUI, ie Acton Lane. (i might be wrong of course).
Would you not want to still have a neutral section on the Willesden SWS so that a problem at Willesden West London Jn didn't require an emergency switch off of the North London line though?
 
Joined
5 Aug 2015
Messages
913
Location
Norfolk
Yes, but… that issue is resolved with this electrification.

Were the stretch through Willesden SW sidings electrified, it would all be on the same feeder AIUI, ie Acton Lane. (i might be wrong of course).
They're both Acton Lane but on each of the two different feeds at Acton Lane, hence why there's a neutral section at Metre Bridge Jnc as W.L. Jnc to North Pole is on the same feed as WCML.
1770481757531.png
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
Would you not want to still have a neutral section on the Willesden SWS so that a problem at Willesden West London Jn didn't require an emergency switch off of the North London line though?

You don’t necessarily need a neutral for that, but i hadn’t realised the feeding arrangements so yes you would need one. Easy enough to provide though.
 
Joined
5 Aug 2015
Messages
913
Location
Norfolk
Electrifying the South West sidings would only happen with LO West Orbital route which plan to rebuild the sidings as the new line's new stabling point. Would be interesting to see where they put a neutral section as it might be a bit constrained planning for low speed movements into those sidings. I think they want to put a third line over Grand Union Canal to access the sidings
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,534
Location
Preston Lancs
Well I took a trip to London yesterday to ride on the Elizabeth From Tottenham Court Road took the Lizzie eastbound then westbound . In the Acton Main Line area there was huge activity. Still piles with masts and nothing attached to them and piles and masts lying on the ground. I saw six cranes. Now of course, not all this will be in connection with the electrification but encouraging- I am not convinced the infrastructure is ready for test trains though.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Well I took a trip to London yesterday to ride on the Elizabeth From Tottenham Court Road took the Lizzie eastbound then westbound . In the Acton Main Line area there was huge activity. Still piles with masts and nothing attached to them and piles and masts lying on the ground. I saw six cranes. Now of course, not all this will be in connection with the electrification but encouraging- I am not convinced the infrastructure is ready for test trains though.
I'd imagine much of what you saw would likely be for Old Oak Common.
 

Phillipimo

Member
Joined
5 Jan 2013
Messages
237
Location
Portsmouth

I found this cabride video along the line from early January. The electrification looks pretty much complete. Starts from the 45:30 mark.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,534
Location
Preston Lancs
I'd imagine much of what you saw would likely be for Old Oak Common.
Yes, you are probably correct. Lots of new Galv visible and not much aged.

OT but as an aside I only saw one headspan as opposed to portals and TTCs heading to Paddington so that project is progressing nicely too.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,865
Location
Beeston (Notts)
Yes, you are probably correct. Lots of new Galv visible and not much aged.

OT but as an aside I only saw one headspan as opposed to portals and TTCs heading to Paddington so that project is progressing nicely too.
Absolutely, great to see the conversion to independent registration marching along. They've converted a lot more of them to MIRs between OOC & Paddington as well, and done rather a lot west of Southall (including converting a headspan to a mid-point anchor portal of all things!)
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,274
Location
Churn (closed)
I got it checked on AIVR. Picture quality is poor but it's fully wired as marked in red. The link east of AML does not seem to be wired, but image quality is too poor at this time of year to be sure.

1766151724624-png.194193
 

Top