zwk500
Veteran Member
Is there a placing into service date known for the full section?Just looked on AIVR. 29/11/2005.
This is now connected at Acton Wells Jc and the crossover on the UP side of Acton Main Line. Theoretically through trains could now operate.
It is not connected on the down side end of Acton ML via the freight sidings as the cables just end before the underpass over junction.



