Access to Network Rail Engineering Works document

Status
Not open for further replies.

mawallace

Member
Joined
20 Nov 2006
Messages
296
I recall that I used to be able to download a document which set out all Network Rail planned engineering works planned for the control period by region. I've searched and can't locate this anywhere. Can someone please post a link - I'm looking for the Anglian region.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,613
Location
Nottingham
The Operational Rules give the times that each line is scheduled to be closed for engineering access but doesn't say anything about what work is done when within those closures, or indeed about the plans for "disruptive" closures that require amended timetables.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,248
The Operational Rules give the times that each line is scheduled to be closed for engineering access but doesn't say anything about what work is done when within those closures, or indeed about the plans for "disruptive" closures that require amended timetables.
Just checked a random Engineering Access Statement part 7 for Wessex route, around October this year, and it still does exactly what you'd expect. Service alterations required are explained, and a broad summary of the work is shown. I used the downloadable zip file option here: https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/

The zip file includes four separate directories for Timetable Planning Rules and Engineering Access Statements, 2 years for each.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
Section 7 is the disruptive, section 4 is the standard access times which Edwin is probably looking at.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,613
Location
Nottingham
Just checked a random Engineering Access Statement part 7 for Wessex route, around October this year, and it still does exactly what you'd expect. Service alterations required are explained, and a broad summary of the work is shown. I used the downloadable zip file option here: https://www.networkrail.co.uk/industry-commercial-partners/information-operating-companies/

The zip file includes four separate directories for Timetable Planning Rules and Engineering Access Statements, 2 years for each.

Section 7 is the disruptive, section 4 is the standard access times which Edwin is probably looking at.

I've learned something today!

Looking at the current one some (maybe all) pages are watermarked "Superseded by CPPP" although it is noted that the latest details are uploaded to it anyway (but it doesn't say when). I'm not sure if that means they are up to date or not.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,248
I've learned something today!

Looking at the current one some (maybe all) pages are watermarked "Superseded by CPPP" although it is noted that the latest details are uploaded to it anyway (but it doesn't say when). I'm not sure if that means they are up to date or not.
CPPP stands for confirmed period possession plan. I don’t believe it is made public.
 