Aberdeen - Inverness line: could further improvements be made?

Status
Not open for further replies.

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,510
Location
Moorpark, CA
Getting away from airports for a moment: would there be any case for redoubling Inverurie-Insch and Kennethmont-Keith i.e. back to the late 1960s track situation?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tobbes

Established Member
Joined
12 Aug 2012
Messages
1,242
Getting away from airports for a moment: would there be any case for redoubling Inverurie-Insch and Kennethmont-Keith i.e. back to the late 1960s track situation?
Was Aberdeen to Inverness ever double throughout?
 

Red Onion

Member
Joined
4 Apr 2012
Messages
416
Location
Aberdeen
Getting away from airports for a moment: would there be any case for redoubling Inverurie-Insch and Kennethmont-Keith i.e. back to the late 1960s track situation?

I would even suggest a second platform at Keith to allow trains to pass in the platforms.
 

option

Member
Joined
1 Aug 2017
Messages
639
Interesting article on what's been done as 'Phase 1'

Journey time over the 173-kilometre-long Aberdeen and Inverness route is around 2 ¼ hours with an irregular, about two-hourly service frequency.
Whilst the Scottish Government’s long-term objective for the Aberdeen to Inverness line is the provision of an hourly service with a two-hour journey time,

It has taken four years to deliver A2I phase one – one of the UK’s longest redoubling projects – as well as a series of enhancements to provide more-efficient loop operation. On a single-track railway, this is perhaps likely to offer greater time savings than line speed enhancements.


Aberdeen to Inverurie is on the electrification plans. (from Montrose or Dundee)
I doubt that would see any increase in line speed, currently 75mph max from Aberdeen, but better acceleration should speed up journeys a little, & clear blocks quicker.
(Though Dundee-Aberdeen is 100mph max)

Inverness end is 75mph max as well, but from Inverurie to Elgin there's quite a few sections where it drops to 60mph. But there's only the IC services using that track, so not much 'bang for your buck' if you increase line speed there.


I suspect any further improvements would be bundled in with electrification, which is presumably a future phase, as mentioned here
 

Wynd

Member
Joined
20 Oct 2020
Messages
741
Location
Aberdeenshire
Double to Insch, redouble the tunnels at the north end of aberdeen, electrify to Inverurie, reintroduce inter-modal freight to Inverurie & Elgin.

Oh and reopen Platforms 8&9 at Aberdeen.

And provide for a Junction at Dyce for eventual reopening of Peterhead via Boddam.
 

computerSaysNo

Established Member
Joined
14 Dec 2018
Messages
1,669
Double to Insch, redouble the tunnels at the north end of aberdeen, electrify to Inverurie, reintroduce inter-modal freight to Inverurie & Elgin.

Oh and reopen Platforms 8&9 at Aberdeen.

And provide for a Junction at Dyce for eventual reopening of Peterhead via Boddam.
The tunnels at the north end of Aberdeen can't be redoubled as they're not wide enough for the enhanced loading gauge of the rest of the route. If they were wide enough they'd have been doubled as part of the current project.
 

Wynd

Member
Joined
20 Oct 2020
Messages
741
Location
Aberdeenshire
The tunnels at the north end of Aberdeen can't be redoubled as they're not wide enough for the enhanced loading gauge of the rest of the route. If they were wide enough they'd have been doubled as part of the current project.
How are we going to get inter-modal freight back on the line if they wont fit through the tunnels?
 

computerSaysNo

Established Member
Joined
14 Dec 2018
Messages
1,669
I doubt that would see any increase in line speed, currently 75mph max from Aberdeen, but better acceleration should speed up journeys a little, & clear blocks quicker.
If I'm remembering correctly the max linespeed between Inverness and Aberdeen is 85mph but a fair amount is around 75.
I can't see linespeed improvements being possible without realignment as the corners are the limiting factor. Better accelerating rolling stock would help slightly but the stations are fairly far apart so the majority of the time is spent at linespeed.

== Doublepost prevention - post automatically merged: ==

How are we going to get inter-modal freight back on the line if they wont fit through the tunnels?
Freight will fit through the tunnels at present as there is a single track through the centre of the tunnel (giving maximum height and space on both sides). If the north tunnel was double tracked then the tracks would need to be offset from the centre, closer to the edge wall and with less overhead clearance.
 

Wynd

Member
Joined
20 Oct 2020
Messages
741
Location
Aberdeenshire
If I'm remembering correctly the max linespeed between Inverness and Aberdeen is 85mph but a fair amount is around 75.
I can't see linespeed improvements being possible without realignment as the corners are the limiting factor. Better accelerating rolling stock would help slightly but the stations are fairly far apart so the majority of the time is spent at linespeed.

== Doublepost prevention - post automatically merged: ==


Freight will fit through the tunnels at present as there is a single track through the centre of the tunnel (giving maximum height and space on both sides). If the north tunnel was double tracked then the tracks would need to be offset from the centre, closer to the edge wall and with less overhead clearance.

My understanding is that the tunnels restrict the gauge of certain containers and also restrict the timetable.
 