I feel that an upgraded A27 would be better value for money than a high speed train line from London. Getting into London is relatively quick from most places on the South Coast. But getting along the coast can be rather tedious and slow.
Well, with upgraded trains, you'll hopefully get less cars on the road....I feel that an upgraded A27 would be better value for money than a high speed train line from London. Getting into London is relatively quick from most places on the South Coast. But getting along the coast can be rather tedious and slow.
not just the New ForestPresumably a tunnel under the New Forest as well. The verderers aren't going to accept any damage to the forest. That in itself would likely be 20 miles long.
Given the mess HS2 got itself into, its almost certain that future high speed projects, if they occur, will be increasingly dominated by tunnels.not just the New Forest
you've got to somehow avoid the Dorset heathlands between Bournemouth and Dorchester, and then tunnel through the South Downs chalk west of Dorchester
Brighton to Southampton is basically a continuous stretch of developed area. Unless a high speed line has numerous stations, all in built up areas, then people are still going to be using cars to get to it. Or existing trains, and then you need to add interchange stations in appropriate intermediate places.Well, with upgraded trains, you'll hopefully get less cars on the road....
I have to totally agree with the above comment. I think with having to built tunelling all over the place, the cost of the project would be too much for any government to pay out and you would have to increase fares to an amount that possibly most people would not be able to afford to pay for it.Brighton to Southampton is basically a continuous stretch of developed area. Unless a high speed line has numerous stations, all in built up areas, then people are still going to be using cars to get to it. Or existing trains, and then you need to add interchange stations in appropriate intermediate places.
As others point out I believe a high speed E/W alignment would be impossible to build without the vast majority being underground, and even then much would have to be under water, eg if directly serving Portsmouth.
But if you’re contemplating tunnelling all over the place, why not use fairly short tunnels in the Winchester area to fully four track Basingstoke to Southampton, and run Waterloo to Southampton at 100 mph throughout, or faster if AC electrified?
This whole thread is all pie in the sky thinking anyway. Realistically there just isn't demand to pay for any level of enhancement on the south's railways now. As posters have pointed out in another thread the collapse in peak demand on the Portsmouth direct means that only two trains an hour can be justified from Waterloo to Portsmouth.I have to totally agree with the above comment. I think with having to built tunelling all over the place, the cost of the project would be too much for any government to pay out and you would have to increase fares to an amount that possibly most people would not be able to afford to pay for it.
As we've noted before, the SWML has alignments that would favour higher speed services (200kph?) so the relative simplicity of judicious 4-tracking would give a good return. That would be easily justified if the existing 3rd rail east of Basingstoke was progressively replaced with ac as it reached end of life.Brighton to Southampton is basically a continuous stretch of developed area. Unless a high speed line has numerous stations, all in built up areas, then people are still going to be using cars to get to it. Or existing trains, and then you need to add interchange stations in appropriate intermediate places.
As others point out I believe a high speed E/W alignment would be impossible to build without the vast majority being underground, and even then much would have to be under water, eg if directly serving Portsmouth.
But if you’re contemplating tunnelling all over the place, why not use fairly short tunnels in the Winchester area to fully four track Basingstoke to Southampton, and run Waterloo to Southampton at 100 mph throughout, or faster if AC electrified?
If I was doing this I wouldn't bother with a new high speed line through this area, I'd just upgrade the existing line from Southampton through to Dorchester, then construct a new line, not of high speed design to save costs on a relatively short stretch that isn't beneficial, going via Bridport, Charmouth and then joining the West of England mainline somewhere around where Seaton Junction used to be, which would then be combined with upgrading the existing route through to Exeter, primarily by redoubling it. The hardest bit would be the new line between Dorchester and Seaton Jct, not just due to the topography and geology, but pre-Beeching no rout existed through there, except for a few branch lines on a North-South alignment.not just the New Forest
you've got to somehow avoid the Dorset heathlands between Bournemouth and Dorchester, and then tunnel through the South Downs chalk west of Dorchester
There's not demand from London, but there might be demand from up North, which is why I suggested to connect it to HS2.This whole thread is all pie in the sky thinking anyway. Realistically there just isn't demand to pay for any level of enhancement on the south's railways now. As posters have pointed out in another thread the collapse in peak demand on the Portsmouth direct means that only two trains an hour can be justified from Waterloo to Portsmouth.
Southern can only justify the half hourly service from Brighton to Southampton / Portsmouth. SWR no longer run the slower Southampton train, just the 2tph Weymouth services. CrossCountry can't justify an hourly service south of Reading. Nothing points to anyone having to afford anything.
It is possible that a 'proper metro' along parts of the south coast network would actually be better spending than a faster service, but with trains to Brighton now running half hourly from the west coastway, it isn't obvious that the demand (or political will) is there for that either.
This probably isn’t a good idea for a London - Exeter route, as even with a full SWML upgrade it would still be slower than going via the WofE Line (which in itself takes twice long as the Reading - Taunton Line). Even for a local service, the demand just isn’t there for rail to Bridport and Lyme Regis, and Weymouth to Exeter would probably still be quicker going via Yeovil anyway.If I was doing this I wouldn't bother with a new high speed line through this area, I'd just upgrade the existing line from Southampton through to Dorchester, then construct a new line, not of high speed design to save costs on a relatively short stretch that isn't beneficial, going via Bridport, Charmouth and then joining the West of England mainline somewhere around where Seaton Junction used to be, which would then be combined with upgrading the existing route through to Exeter, primarily by redoubling it. The hardest bit would be the new line between Dorchester and Seaton Jct, not just due to the topography and geology, but pre-Beeching no rout existed through there, except for a few branch lines on a North-South alignment.
Those north-south branches all follow the river valleys, your new route would need long base tunnels through the chalk followed by multiple viaducts crossing the valleys. When the LSWR got to Dorchester they took one look and said "too difficult" so went to Weymouth, instead heading west via Yeovil, skirting the Dorset Downs and following the River Axe. Technically it could probably be done but the cost would be high, with no population centres or industries en route. And there's the environmental factor - does anyone really think a tunnel is going to be allowed under Maiden Castle?If I was doing this I wouldn't bother with a new high speed line through this area, I'd just upgrade the existing line from Southampton through to Dorchester, then construct a new line, not of high speed design to save costs on a relatively short stretch that isn't beneficial, going via Bridport, Charmouth and then joining the West of England mainline somewhere around where Seaton Junction used to be, which would then be combined with upgrading the existing route through to Exeter, primarily by redoubling it. The hardest bit would be the new line between Dorchester and Seaton Jct, not just due to the topography and geology, but pre-Beeching no rout existed through there, except for a few branch lines on a North-South alignment.
I’ve often wondered whether it would be practical to heavily upgrade the Reading - Taunton Line to an “HS3” to the South West rather than build a new alignment*, considering that the line was sort of built as a 19th-century equivalent of a high speed line anyway - It replaced the original GWR “long way round” via Bristol.
Those north-south branches all follow the river valleys, your new route would need long base tunnels through the chalk followed by multiple viaducts crossing the valleys. When the LSWR got to Dorchester they took one look and said "too difficult" so went to Weymouth, instead heading west via Yeovil, skirting the Dorset Downs and following the River Axe. Technically it could probably be done but the cost would be high, with no population centres or industries en route. And there's the environmental factor - does anyone really think a tunnel is going to be allowed under Maiden Castle?
There's not demand from London, but there might be demand from up North, which is why I suggested to connect it to HS2.
He also describes the route between Reading and Castle Cary as "a thoroughly bad railway" and explains that it "turns sharply as often as the river."The Reading - Taunton line itself wasn't particularly straight and was no faster than the Waterloo - Exeter route into the 1960s. Gerry Fiennes' 'I Tried to Run a Railway' states that the route was chosen as the primary route as there was no need for a reversal at Exeter St Davids (the primary route to Plymouth was definitely the coastal route) and the climb between St Davids and Central was avoided.
There are definitely a few meanders that could be straightened if you were happy to break out the chequebook and the diggers- the curves near Lavington spring to mind. How much time that would save, I don't know. Others, e.g. around Bedwyn/Savernake, are non starters because you'd start requiring tunnels and bridges.The idea of upgrading an existing line to high speeds rather than building one in itself isn’t a terrible idea though, particularly if the demand isn’t there for a new line but the existing one could benefit from a faster service. I’ve often wondered whether it would be practical to heavily upgrade the Reading - Taunton Line to an “HS3” to the South West rather than build a new alignment*, considering that the line was sort of built as a 19th-century equivalent of a high speed line anyway - It replaced the original GWR “long way round” via Bristol.
*Certain stretches could be straightened to allow 140+mph running, but where it already allows the track infrastructure could be left alone.
Most English tourists in Spain are scousers. Other cities can produce demand too. And never underestimate a Northerner's desire to be in the sun, and the South Coast gets more of it than the North.If there’s not demand from London - the largest and most concentrated area of population and economic activity in Europe - there won’t be demand from ‘up north’.
Most English tourists in Spain are scousers.
Do you actually live in the UK?Most English tourists in Spain are scousers. Other cities can produce demand too. And never underestimate a Northerner's desire to be in the sun, and the South Coast gets more of it than the North.
I do have a great old poster which shows the line from Waterloo to Exeter as being nearly as straight as the B&H. After Exeter it has Okehampton, Launceston, Wadebridge and Padstow - and I always wonder if that little collection of towns in a row having a direct London service today would add up to something.There are definitely a few meanders that could be straightened if you were happy to break out the chequebook and the diggers- the curves near Lavington spring to mind. How much time that would save, I don't know. Others, e.g. around Bedwyn/Savernake, are non starters because you'd start requiring tunnels and bridges.
I'd also be concerned about the impact on local services if you started running trains so fast on the B&H, especially with Devizes Parkway station in the works.
Broadly, though, I agree that new high speed lines just aren't required in the south. South and east of London, distances are too short to get much benefit from high speeds (Kent's HS1 services are a lucky bonus), and elsewhere most of the trunk routes are well enough engineered/aligned (SWML, GWML, B&H) that you're probably better off just upgrading them where possible. I suspect Devon and Cornwall, which would have the most to gain, would benefit more from local upgrades than a brand new shiny high speed line duplicating the B&H, for example.
So which abandoned route to Exeter were you thinking of?Rather than creating new lines, where possible would it maybe be better if demand levels require it to be re - opening lines closed back in the Mid 1960s to early 1970s, if the path for those lines still exist?
Would some of these lines being rebuilt and re - opened help elevate the bottlenecks such as Dawlish for example?
And is the alignment of an old line likely to be suitable for high speed running?So which abandoned route to Exeter were you thinking of?
Great Western Main Line is a century-old railway yet it's still possible to upgrade it to high speed running.And is the alignment of an old line likely to be suitable for high speed running?
I believe we’ve seen from projects such as East West Rail that rebuilding an old alignment is as expensive as building new.
Okehampton is what I had in mind and I know that the merits of reopening it have been discussed to death. However, I do think reopening such lines where possible is better than carving up more of the countryside and farmland of the UK.The merits (or lack of) reopening the Okehampton route have been discussed to death on a dedicated thread.
The only other route which might be considered duplicate is the Teign Valley route for Exeter - Newton Abbot. It was a twisting single track branch line with single line infrastructure which closed 5 years before most people had heard of Dr Beeching, because traffic was virtually non-existent. The half mile long single track tunnel at Perridge has collapsed. Some of the trackbed is under the A38.
Frankly, if the Treasury suddenly decided due to a drunken bet to make the funds available to reopen all bar two closed railway lines in Devon and Cornwall, the Teign Valley would still be a candidate to miss out.