Right so you're going to cascade life expired stock on to Cross Country and Exeter - Waterloo to replace stock that is up to 10 - 15 years younger.
You have to be pulling my leg?
There are 96 142's, 25 143's and 23 144's (which ironically don't make it into your plan or haven't been mentioned by anyone else) so I guess 144 fleet is staying whilst the 156 fleet goes to the torch.
Agree - I thought it a bit odd to be pushing for some of the 15xs to be scrapped before the 144s....
I love how everyone is pushing for Newcastle - Middlesborough to be electrified yet they haven't thought of the small matter of the incorrect supply for the Metro that would have to be dealt with first
Perhaps they're going to suggest de-electrifying Tyneside local services - wouldnt be the first time that's happened
Only a mixture of 200 extra carriages/trains between Northern, Transpennine and FGW to be conveniently ignored.
You have some good ideas and they will probably be achieved eventually but not before the current fleets have long gone.
The plans are likely to be
1) Electrify Preston - Blackpool. This mini project will allow NR to practice OHLE installation and allow VWC terminators (at Preston) to serve Blackpool. Note that this will give this city a direct but sparse link to London.
Nope - highly unlikely, can't see there being a benefits case for the infrastructure changes to justify this one.
2) Electrify Preston - Manchester. This will bring a number of ex 142 services to a close.
More likely as it would also aid diversions from the WCML
3) Electrify Manchester - Liverpool (both ways). This begins to really cut a swathe into the NW 142 fleet
Again, can't see a benefits case stacking up for this one. New DMUs would probably be cheaper
4) Electrify York - Leeds then on to Manchester. Now this begins to boost Transpennine capacity as at least 2tph across the Pennines become electric.
Given they've just put new units on TPE, I can't see this one making a benefits case for electrification, particularly since the TPE stuff tends to start / end beyond York / Manchester
Electrifying Morpeth - Bedlington and Newcastle - Metrocentre would (with the separation of diagrams) cascade 2-3 units and give Northumberland a real rail service
Again, probably cheaper to new build suitable DMUs than electrify
Now this is the point where the fun begins. Either electrify the MML north or electrify the GW west. The MML would be best done in stages with it reaching Leicester, then Nottingham, then Derby, then Sheffield before reaching the Wakefield line. Then attention would need to be paid to lines off such as Nottingham - Sheffield, Sheffield - Leeds via Barnsley and Derby - Birmingham. The GW would probably reach Bristol first then head for Exeter and Cardiff next. A Bristol suburban scheme and Bedwyn would probably come next.