80x to replace Mk4s on TfW?

Status
Not open for further replies.

Caaardiff

Established Member
Joined
9 Jun 2019
Messages
1,377
The CAF capacity at Chester problem is not down to the number of 197's in service per se. It's the number of broken ones at any one time that's the issue.
The CAF maintenance program is pretty much maxed out with the current fleet, without taking into account broken trains.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,329
The CAF maintenance program is pretty much maxed out with the current fleet, without taking into account broken trains.
Is this something that shoud be taken into account when letting new contracts? I.e. "power by the hour" to allow for realistic recent historical/normal damage from useage?
I'm assuming "broken trains" doesn't just mean engine or door failures or whatever: if these sorts of things actually are the cause then I hope TfW are getting a lot of money back.
I am always amazed at the number of trains in the sidings at Chester - and was equally shaken by the units standing idle at Holyhead when we were there last year
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,538
Location
Wales
I'm assuming "broken trains" doesn't just mean engine or door failures or whatever
It could be something waiting spare parts (whatever is in that siding at Chester may well be cannibalised for further parts to keep the rest of the fleet in service too) or units that have hit trees or whatever and are awaiting bodywork repairs.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,770
Is this something that shoud be taken into account when letting new contracts? I.e. "power by the hour" to allow for realistic recent historical/normal damage from useage?
You mean like the IEP contract? Because that went well…
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,329
You mean like the IEP contract? Because that went well…
I was trying to think of a way that the (still apparently fashionable) Thatcherite devotion to outsourcing, contracts and contract law could be made to work in our - the travelling public's - favour!
If there are loads of relativley new units lying around unused just for the want of either a repair or a component then something is badly wrong with either the depot staffing or the stores position, or both.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,538
Location
Wales
There was only one unit in that Middle Yard siding this morning, though there have been more laid up in the past.
 