Apparently 7 x 350s and 3 x 730s suffered significant damage.

== Doublepost prevention - post automatically merged: ==
How many 350's were WMT going to off lease on completion of 730 introduction?
Rumours circulating that control of a dam was the cause of the river bursting its banks leading to the flooding. I’m sure the investigation will get to the truth.
If thats correct the insurers are going to have fun sorting out liability
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bnsf734

Member
Joined
15 Oct 2007
Messages
645
Location
Nuneaton
Reported on a Facebook group yesterday that a video on the West Midlands Railway facebook page put out by WMR stated 5 units were damaged by the floods.

I cannot find the video myself.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,312
sources from within rail industry have seen the following info, how true I do not know, but multiple people have sent me the same:-

That flooding at Northampton last Sunday....

7 desiros are beyond repair
Need all new electics and bogies

Been estimated it's going to cost £1.5 MILLION pound per desiro x 7

Also 3 class730s also beyond repair, also needing new bogies and electrics

Estimate for those is £1.2 MILLION pounds each

LNWR are now in dispute as too who is paying for this


Northampton waterways OPENED a dam up the road causing the whole river to burst and Northampton station flooding in 73 minutes starting at 2338 Saturday evening
All caught on CCTV

They didn't release the dam at the other end hence what caused the flood

The 3 x 730s and 5 x 350s all had pans up and drawing power at the time the water came in and flooded and exploded each unit
2 x 350s in bay 5 had pans down
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
I've also seen that, but I would be more inclined to trust what WMT themselves have said of it being 5 units seriously damaged - they have no possible motive to lie about it, if anything their motive would be to say it's worse than it is in order to excuse disruption not caused by these 5 missing units.

Re-leasing 5 of the off-lease 350/2s is probably the easiest short term fix, once they've found someone to cough up for it.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,397
sources from within rail industry have seen the following info, how true I do not know, but multiple people have sent me the same:-

That flooding at Northampton last Sunday....

7 desiros are beyond repair
Need all new electics and bogies

Been estimated it's going to cost £1.5 MILLION pound per desiro x 7

Also 3 class730s also beyond repair, also needing new bogies and electrics

Estimate for those is £1.2 MILLION pounds each

LNWR are now in dispute as too who is paying for this


Northampton waterways OPENED a dam up the road causing the whole river to burst and Northampton station flooding in 73 minutes starting at 2338 Saturday evening
All caught on CCTV

They didn't release the dam at the other end hence what caused the flood

The 3 x 730s and 5 x 350s all had pans up and drawing power at the time the water came in and flooded and exploded each unit
2 x 350s in bay 5 had pans down
If there is any truth in this then LNWR and the ROSCO(s) will be going after 'Northampton waterways' (whatever that is) and their insurers legally without a shadow of a doubt. Me learned friends will have a field day.

== Doublepost prevention - post automatically merged: ==

Re-leasing 5 of the off-lease 350/2s is probably the easiest short term fix, once they've found someone to cough up for it.
Assuming that five are fully serviceable l agree.
 
Last edited:

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,596
If there is any truth in this then LNWR and the ROSCO(S) will be going after 'Northampton waterways' (whatever that is) and their insurers legally without a shadow of a doubt. Me learned friends will have a field day.

== Doublepost prevention - post automatically merged: ==
Won't it be LNR going after the ROSCO (for failing to provide the contracted stock) who in turn will go after NR who in turn will go after 'Northampton waterways' (probably an arm of the EA?).
 

meld3

Member
Joined
28 Aug 2019
Messages
204
Location
West Midlands
Won't it be LNR going after the ROSCO who in turn will go after NR who in turn will go after 'Northampton waterways' (probably an arm of the EA?).
Don't hold your breath....
In 2007 I had a similar problem, my office's flooded with 3 feet of water from the nearby canal because someone forgot to open a sluice gate to relieve water pressure or some such reason.
Insurers were still pursuing the waterways when I sold the offices in 2021....
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,752
Won't it be LNR going after the ROSCO (for failing to provide the contracted stock) who in turn will go after NR who in turn will go after 'Northampton waterways' (probably an arm of the EA?).
No. The other way round if anything - if units are a write-off the claim will be from ROSCO to TOC.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
Won't it be LNR going after the ROSCO (for failing to provide the contracted stock) who in turn will go after NR who in turn will go after 'Northampton waterways' (probably an arm of the EA?).

Depends I guess on the terms of the lease, and in particular whether accidental damage (which is what this would come under) is the TOC's to fix/insure against or the ROSCO's. Car leases, for example, are available on both sets of terms.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,397
Who would have been flooded if they didn't? Dammed if you do, dammed if you don't...
I saw what you did there lol....

I agree your comment but that doesn't mean that they get to dodge the consequences of their choices.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,422
Location
Lichfield
In theory, bringing back the 350/2's that have just gone off lease would be a quick fix, but seeing how long and complicated every process on the railways, it'll be a non-starter.

What effect is this having on LNWR at the moment?
 

Razorblades

Member
Joined
17 Dec 2021
Messages
450
Location
Copshaw Holm, Scottish Borders
Some of the 9 Class 323s that have recently been returned off-lease could be reinstated to help relieve this situation if only the various stakeholders could act in a joined-up fashion (mind you, if reinstating 350/2s is not possible....).
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,422
Location
Lichfield
Short formations and cancellations, as one might expect, including 8 down to 4 which is catastrophic and results in people being left behind. (12 down to 8 is tolerable if cramped).

Sadly, I can see this now being the norm until LNR (finally) get the 730/2s into service.

I have no faith in the railway being joined up and proactive enough to do anything such as taking back some 350/2s or 323s that would actually be beneficial to the passengers...
 

EyeKay

Member
Joined
16 Mar 2024
Messages
88
Location
UK
Short formations and cancellations, as one might expect, including 8 down to 4 which is catastrophic and results in people being left behind. (12 down to 8 is tolerable if cramped).
I can confirm this. I was on a Crewe - Euston formed of a single 350 this morning. Absolutely rammed. Not helped by the Manchester-Eustons being cancelled due to a landslip.
 

NickBucks

Member
Joined
17 May 2013
Messages
250
Well Met Office forecasting heavy rain and 80mph Friday pm and Saturday.Hope some contingency plans are in place!
 

Wivenswold

Established Member
Joined
24 Jul 2012
Messages
1,570
Location
Essex
This will result in significant legal action between all the parties involved. Initial solicitors letters will no doubt have already been sent.
Liability will be a fascinating dispute, sadly my firm doesn't insure any of them as I'd love to get my hands on this claim.
 

M60lad

Established Member
Joined
31 May 2011
Messages
1,563
I thought that LNWR are supposed to be getting some new trains which I've seen this year stabled outside Crewe Station, why can't some of these replace the ones damaged in Northampton floods? Unless not enough staff have been trained on them yet.
 

TMD Tom

Member
Joined
13 Apr 2016
Messages
22
The Environment Agency opened the flood gates at Sixfields on the Nene, which caused flooding of the station. There’s obvious questions about that decision and what advice was given during the weather warning that this was a possibilty.

At the Riverside Sidings, flood water came up above the railhead, however the units stabled there are fine and moved under their own power.

There were five units in the bays with pans up, where flood water came up to solebar level. These were:

350377, 350233, 350242 and
350113, 350254

ROG 37s were used to move these.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,162
I thought that LNWR are supposed to be getting some new trains which I've seen this year stabled outside Crewe Station, why can't some of these replace the ones damaged in Northampton floods? Unless not enough staff have been trained on them yet.
If it was that easy, the Class 701s would all be in service by now.

The Class 730/2s are not yet cleared for passenger service.
 

modernrail

Established Member
Joined
26 Jul 2015
Messages
1,440
Seriously bad form if thr EA did that without having a little look on the map to see what would be affected downstream and then issue very specific targeted warnings through their systems, including phone calls.

You don’t purposely flood a large mainline station without giving NR notice, even if only on safety grounds.

It might well be a totally justified action but I struggle to believe the EA are not in the firing line here, unless of course they did put a warning through that was then not acted on.

Whether the EA are actually legally culpable is another matter. I can see this falling between some cracks, particularly if there was a general warning out for the area. If that was the case perhaps the onus shifts on the rail companies. They might argue lack of precedent but if the warning for that area was strong enough - I am sure the EA will argue that legally, no further warning was necessary.

Couple of further thoughts
- should the pans not have been down if the units were out of service. I have no knowledge on this point but would have thought there might be advantage in standard procedure to not having trains pan up if they are not doing anything - in case anything funny comes down the wires?

- how might this work with the contracts with the DfT. Gov now takes revenue risk but does that is a long way from Gov taking risk on leased assets. Does that fall to the TOC? If so, is this an example of a risk that genuinely sits with the private sector under the current model for non-nationalised TOCS (and if so is something that will be back on the public side for nationalised TOCS)
 
Last edited:

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
No units could/should have been pan up, as the station was blocked and the power isolated under planned engineering work at the time of the flooding
 

modernrail

Established Member
Joined
26 Jul 2015
Messages
1,440
No units could/should have been pan up, as the station was blocked and the power isolated under planned engineering work at the time of the flooding
Could that engineering work have impacted/delayed a decision to move the units that might otherwise have been an easier/quicker decision?
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,888
Location
Northampton
The Environment Agency opened the flood gates at Sixfields on the Nene, which caused flooding of the station. There’s obvious questions about that decision and what advice was given during the weather warning that this was a possibilty.

At the Riverside Sidings, flood water came up above the railhead, however the units stabled there are fine and moved under their own power.

There were five units in the bays with pans up, where flood water came up to solebar level. These were:

350377, 350233, 350242 and
350113, 350254

ROG 37s were used to move these.

Interesting.
Might be worth mentioning that the arm of the Nene that flows though Sixfields is a different one to the one coming from the North, and it's a flood relief channel to the latter that is very close to the station and presumably the cause of the station flooding. The confluence is downstream of the station.
To me it suggests that another flood gate further downstream (possibly at South Bridge) should have been opened at about the same time. What presumably happened is that the released water then met restriction further downstream and flowed back up (against the normal flow) the storm channel to the station.
Also explains why the whole of Jimmys' End wasn't under water - the flood relief channel had the effect pf delivering the excess water into a very confined area, and the only place for it to go was the station.
 

SLC001

Member
Joined
13 Jan 2022
Messages
171
Location
Northampton
We live near Sixfields and the flood plain around us never looked full to capacity - levels have been much higher in recent times. Mind you, if they opened the flood gates at Sixfields that may explain it. It is worrying that the levels at Sixfields were so high - was the flood plain capable or big enough to absorb the excess water or take it off fast enough to prevent the high levels seen? Whatever, one hopes that a full enquiry is carried out to prevent as much as is possible similar occurrences in the future. In this latest case, the railway has suffered badly.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,888
Location
Northampton
We live near Sixfields and the flood plain around us never looked full to capacity - levels have been much higher in recent times. Mind you, if they opened the flood gates at Sixfields that may explain it. It is worrying that the levels at Sixfields were so high - was the flood plain capable or big enough to absorb the excess water or take it off fast enough to prevent the high levels seen? Whatever, one hopes that a full enquiry is carried out to prevent as much as is possible similar occurrences in the future. In this latest case, the railway has suffered badly.

There was an enquiry after the 1998 floods; the cause was given as blocked storm drains. The report said that the defences were now fit for all but a one in 200 year event.
Doesn't time fly!
 

SLC001

Member
Joined
13 Jan 2022
Messages
171
Location
Northampton
There was an enquiry after the 1998 floods; the cause was given as blocked storm drains. The report said that the defences were now fit for all but a one in 200 year event.
Doesn't time fly!
Which suggests something went wrong such as blocked culverts and drains possibly caused by the flooding and / or human error. Knowing the issues near us, I wouldn't be surprised if cost cutting through lack of money contributed to the problem. I do know disputed land ownership and responsibility for maintenance has caused minor flooding near us.
 
Status