Could ATW cut their service back to Wolverhamton?
Could ATW cut their service back to Wolverhamton?
The bidder is allowed to apply to change the current services and calling pattern. It's the first time they've been given that freedom so we don't know how academic it actually is. However, any change would need to be approved by the ORR as there might be objection to the changes from other operators and stakeholders.
I remember there being something about four tracking part of the COV-BHM route a while back, but can not remember which part. I know it wasnt going to be much of it though.
Based on the current arrangement, I had a bit of a play on Excel (nothing more technical) and reckon that if you could get away with a headway of three or four minutes then the following should be possible:
4tph VT calling International Only
2tph XC calling International Only
2tph LM calling International Only
2tph LM calling all stations. Probably looped at International
plus a couple of freight paths should still fit in this too.
They can yes, but they still need to provide the specified minimum number of services per day as stated in the ITT and for Manchester that suggests a 3 tph service for much or all of the day.
It's not interesting at all.
Doesn't Liverpool get a peak express and also 2tph in peaks
It's not about population, but the economy and level and type of demand for travel to London.
Manchester, in comparison, gets 6 arrivals at Euston in 61 minutes between 08:52 and 09:52.
Not really.
The morning departures for Euston are:
05:27 (first train - additional calls to standard pattern)
06:05 (additional calls to standard pattern)
07:00 (misses out Stafford)
07:48 (standard pattern)
08:48 (standard pattern)
Manchester, in comparison, gets 6 arrivals at Euston in 61 minutes between 08:52 and 09:52.
I agree but with Wilmslow getting it's hourly service reinstated and Hartford not and Crewe being a calling point on some Manchester services but no longer on Liverpool's, it means a lot of Cheshire business people drive to Wilmslow and Crewe and use services to or from Manchester. Some could more easily drive to Hartford and the ones that board at Crewe can obviously use any train but half of them are Manchester trains and the Voyagers from Chester have more limited catering facilities.
Not everywhere has to be a railhead, or have one within 5 miles.
Chester, Crewe, Warrington, Stockport and Wilmslow are all in Cheshire and have frequent, fast trains to London. It's surely enough without adding in Hartford?
It's interesting the specified requirement for Liverpool is just 27% of the Manchester requirement.
They are yes but they still have to keep the the minimum service requirement.The bidder is allowed to apply to change the current services and calling pattern.
What is this 'requirement' and how is it measured?
They are yes but they still have to keep the the minimum service requirement.
So what is required is determined by the existing number of trains rather than the other way round?
There are no requirement for the bid to include any of the Network Rail proposals, such as a direct Blackpool train, but potential operators can choose to include such a service in their bid. Also there is no requirement for the direct Wrexham service to continue.
Is that 10% not already taken into account in the minimum number of daily calls compared to the current timetable?They are allowed to run up to 10% less than the daily minimum requirement subject to the weekly minimum service requirement being met, as already mentioned.
Is that 10% not already taken into account in the minimum number of daily calls compared to the current timetable?
then you're probably looking at at least 8 if not 10tph between London & Birmingham across the different routes.
with the intention to stop intercity services at Hemel Hempstead, Leighton Buzzard & Berkhamsted after HS2 is built, and the intention to loop some WCML trains via Northampton, I don't think 4tph London-Birmingham is all that mad.
Wow. You can see 14 years into the future? There is no post HS2 timetable so you can't say what the plans are.The post-HS2 WCML timetable for the fast services is the same as the current insofar as the only calls south of Rugby are MKC and Watford. Serving Northampton would basically make the Weedon lines redundant - I think Hemel deserves an hourly service and maybe that's where a fourth Birmingham VT service should stop, but there are no plans for any VT/successor services to serve Hemel or LB.
The thing to remember is that Milton Keynes, Watford and Rugby still need fast limited stop services. Stopping at HH/LB/Northampton makes them no better than a fast local service.
Network Rail's recent post HS2 study had 6 tph on the WCML to Birmingham NS, then there is the 3tph on the indicative HS2 service specification so you're already up to 9 before you add in Chiltern.When you then factor in HS2 services (London-Bham non stop) and Chiltern services (assume a fast of High Wycombe, Bicester North, Banbury, Warwick & Leamington Spa and a slow with that plus Beaconsfield, Princes Risborough, Haddenham & Thame Parkway, Kings Sutton, Warwick Parkway & Solihull)
then you're probably looking at at least 8 if not 10tph between London & Birmingham across the different routes.