Hindsight is a wonderful thing, but, wonder if people agree with me that HS2 money would have been better spent on making 2 track busy lines into 4 track, especially on the very northern parts of ECML and WCML. Thinking of the derailment today, the pressure on ECML will be very high, but no extra slots are presumably available. The other option being as taken, just to give Birmingham residents 20 mins extra in bed before their London meetings.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
In some areas HS2 is the only way to delivery 4-tracking, in others an on-line upgrade might have been more sensible. Although the need for 400m platforms makes things awkward to keep on-line for too long.
The other option being as taken, just to give Birmingham residents 20 mins extra in bed before their London meetings.
This is not the primary reason behind building HS2. It was a (very silly) political decision to make the narrative all about the journey time. The benefits of HS2 are in taking the fast trains off the existing 4-track WCML between Euston and Rugby.
 

Norm_D_Ploom

Member
Joined
29 Nov 2019
Messages
242
Location
Halifax
Yes, you'd have got a lot done for the money being spent on HS2 but ultimately at some point you would still need the extra capacity.
HS2 was always the right solution but it could have been managed, specified and delivered better.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Yes, you'd have got a lot done for the money being spent on HS2 but ultimately at some point you would still need the extra capacity.
HS2 was always the right solution but it could have been managed, specified and delivered better.
Very Much this.
 

thedbdiboy

Established Member
Joined
10 Sep 2011
Messages
1,207
Agree with all of the above - at it's heart HS2 is (and always should have been articulated as) an extra pair of tracks for capacity; if you're building those in a crowded island you won't necessarily put them next to a formation laid out in the 1830s which wasn't designed for (and has never been ideal for) modern speeds.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,369
Location
East coast of Yorkshire
I think there are two issues here:

Is HS2 in its cut-back but massively over budget form good value for money, and my answer would be no

Did we need a WCML bypass, yes, but given the relatively short distances speeds should have been limited to 300kph/185mph and train lengths compatible with the classic network should have been specified, in other worsds a much less expensive solution.

As to what we could have 'bought' with the HS2 money, everyone will have their pet projects, but going for the 'low hanging fruit' seems to be something that doesnt seem to be part of current thinking. People get hung up on the gold plated solution, and ignore simple improvements that could be made.
 

Norm_D_Ploom

Member
Joined
29 Nov 2019
Messages
242
Location
Halifax
I think there are two issues here:

Is HS2 in its cut-back but massively over budget form good value for money, and my answer would be no

Did we need a WCML bypass, yes, but given the relatively short distances speeds should have been limited to 300kph/185mph and train lengths compatible with the classic network should have been specified, in other worsds a much less expensive solution.

As to what we could have 'bought' with the HS2 money, everyone will have their pet projects, but going for the 'low hanging fruit' seems to be something that doesnt seem to be part of current thinking. People get hung up on the gold plated solution, and ignore simple improvements that could be made.
Yes, improvements could have been made to every line coming out of every London terminus. But it costs a lot more to work alongside a live railway and can involve significant disruption whilst you do it.
So we're back to HS2 being the correct concept but delivered incorrectly.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,659
Location
Selby
Hindsight is a wonderful thing, but, wonder if people agree with me that HS2 money would have been better spent on making 2 track busy lines into 4 track, especially on the very northern parts of ECML and WCML. Thinking of the derailment today, the pressure on ECML will be very high, but no extra slots are presumably available.
Widening a 2-track railway to a 4-track railway is no easy task. Bridges (over or under) need to be rebuilt. If you're 4-tracking through stations then the stations will often need to be rebuilt. Where the route passes through towns and cities, you'll likely need compulsory purchase and demolition of some buildings to make space for it. The cost and disruption of doing extensive works on an extant line is immense. Just look at the WCML upgrade of the 2000s, or the current Transpennine upgrade – and that one is, as far as I can tell, doesn't actually need any new land because it is using land that was railway land anyway – years of hobbled running, blockades, road replacements, diversions, reduced capacity, delays – building HS2 as a brand new line was orders of magnitude cheaper and quicker plan to deliver than any attempt to get the extra capacity for local and long-distance services out of the existing ECML, MML, XCML and WCML.

The other option being as taken, just to give Birmingham residents 20 mins extra in bed before their London meetings.
Trivialising the benefits of HS2 like that is pathetic and a gross distortion of what the railway was going to deliver before Sunak suknackered it.
 

Norm_D_Ploom

Member
Joined
29 Nov 2019
Messages
242
Location
Halifax
Agree with all of the above - at it's heart HS2 is (and always should have been articulated as) an extra pair of tracks for capacity; if you're building those in a crowded island you won't necessarily put them next to a formation laid out in the 1830s which wasn't designed for (and has never been ideal for) modern speeds.
DB did a lot of that though didn'tthey ?
( along with new lines) and for a while it worked OK.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,097
Location
London
Depends on what you have to work with. Bear in mind the WCML is already 4-track for much of its length. Where it goes through built-up areas, expanding the formation and station footprint for two extra tracks would be prohibitively disruptive and expensive.

In Belgium, they are four-tracking Brussels - Ottignies and Ghent - Bruges along the existing formation - either there was historical provision or they are just lucky. When they built express tracks for Brussels - Ghent (L50A) they went for an entirely new alignment from the old L50.
 
Joined
9 Dec 2023
Messages
583
Location
High Wycombe
The example I always use is Coventry - New Street. Quadrupling would create space for more both fast and slow trains, but there's no capacity for those fast trains to go anywhere else, eg another Cross Country service, or more Avanti services. HS2 would create that capacity. Obviously money and space are issues, but in an ideal world IMO, you'd do both, HS2 first - it enables other local upgrades to reach their full potential.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
If you're quadrupling over Shap, what's the chances that something like a landslip that takes out two tracks doesn't take out all four?
 

thedbdiboy

Established Member
Joined
10 Sep 2011
Messages
1,207
DB did a lot of that though didn'tthey ?
( along with new lines) and for a while it worked OK.
The WCML south of Birmingham is though unique in being the first 'intercity' railway - even routes engineered 10 years later had a better understanding of the evolution of motive power. The engines of the 1830s struggled with hills but due to their lower speeds didn't have so many issues with curves, so exactly the opposite of modern high speed lines.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
We could have pursued the standard European approach to HSR, which is to use conventional tracks as far as Watford and not to build entirely new stations.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
We could have pursued the standard European approach to HSR, which is to use conventional tracks as far as Watford and not to build entirely new stations.
The downside to that approach being that it wouldn't release any capacity at all.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,043
Location
Liverpool
Hindsight is a wonderful thing, but, wonder if people agree with me that HS2 money would have been better spent on making 2 track busy lines into 4 track, especially on the very northern parts of ECML and WCML. Thinking of the derailment today, the pressure on ECML will be very high, but no extra slots are presumably available. The other option being as taken, just to give Birmingham residents 20 mins extra in bed before their London meetings.
Aside from the time savings being more like 40 minutes, it was never about the speed of getting to London. It was about relieving capacity on three major trunk routes out of London when it was first thought up, all of which are already four track railways for much of their length. HS2 would've been the extra two tracks for all three railways with enough of a speed advantage to also help reduce road and air traffic at the same time.

We could have pursued the standard European approach to HSR, which is to use conventional tracks as far as Watford and not to build entirely new stations.
As mentioned above, the European approach would not release any capacity. The better comparison would be the Tokyo-Osaka line which was at capacity even as it was electrified and so was instead relieved by an entirely new route that we now know as the Tokaido Shinkansen which runs like a long-distance Elizabeth Line as much as it does a high-speed intercity passenger railway. HS2 would've been much the same in it's original form.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,659
Location
Selby
We could have pursued the standard European approach to HSR, which is to use conventional tracks as far as Watford and not to build entirely new stations.
I don't know enough about continental HSR to know if (a) unlocking capacity on overcrowded mainlines was as significant a feature of the plans as it is in the UK, and (2) if the approaches to Paris and other major destinations were as constrained as they are into Euston, Piccadilly, New Street and Leeds ... but building a new HSR only north from Watford and then sharing tracks into Euston would not have worked because the key point is that Euston and the WCML is already at capacity, and there would be no space for new trains. The best you could achieve in that case would be to replace existing AWC trains with HS2 trains, but that would entirely defeat the point of it.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,097
Location
London
I don't know enough about continental HSR to know if (a) unlocking capacity on overcrowded mainlines was as significant a feature of the plans as it is in the UK, and (2) if the approaches to Paris and other major destinations were as constrained as they are into Euston, Piccadilly, New Street and Leeds ... but building a new HSR only north from Watford and then sharing tracks into Euston would not have worked because the key point is that Euston and the WCML is already at capacity, and there would be no space for new trains. The best you could achieve in that case would be to replace existing AWC trains with HS2 trains, but that would entirely defeat the point of it.

As far as the French network is concerned, almost certainly no.

You are absolutely correct - we have an at-capacity 4-track approach to Euston serving 3 markets (local, regional and long-distance) where it has been abundantly clear for quite some time a 6-track approach is needed. As as you say similar story with Piccadilly, New Street and Leeds.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
We are where we are. The net new services are the captive Curzon ones. Those can increase if justified. Maybe they become very discounted to attract people away from the WCML, even from Solihull, Coventry etc. - as that is where the capacity sits. Especially when it is OOC only, might be a tactic.

Everything else is constrained by the WCML. Even assuming Handsacre... until we can incrementally get to Crewe, there are no new trains north of Lichfield.

So that means:
1) Current trains via Coventry get stops added (all call at Watford, MKC, Rugby)
2) Additional paths will open from Euston WCML until Handsacre-ish - in reality, some extra LNR services which could turn at Tring, Bletchley, Northampton, Rugby. Unsure if Nuneaton would work. Those are helpful.

That's about it. If we could get onto the Cross Country line and head towards Derby, you could see some additional calls on the MML (no new paths but more semi-fast in the South Midlands and Home Counties) - again that's about it. It's all very bitty sadly, until you reach Crewe.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Widening a 2-track railway to a 4-track railway is no easy task. Bridges (over or under) need to be rebuilt. If you're 4-tracking through stations then the stations will often need to be rebuilt. Where the route passes through towns and cities, you'll likely need compulsory purchase and demolition of some buildings to make space for it. The cost and disruption of doing extensive works on an extant line is immense. Just look at the WCML upgrade of the 2000s, or the current Transpennine upgrade – and that one is, as far as I can tell, doesn't actually need any new land because it is using land that was railway land anyway – years of hobbled running, blockades, road replacements, diversions, reduced capacity, delays – building HS2 as a brand new line was orders of magnitude cheaper and quicker plan to deliver than any attempt to get the extra capacity for local and long-distance services out of the existing ECML, MML, XCML and WCML.
Not so with TRU.
The grade separation at Ravensthorpe, the new fast alignment westbound at Heaton Lodge and rebuild of Deighton station all require new railway land.
I think some of the improvements around Church Fenton also needed new land.
Eliminating level crossings with bridges or tunnels usually needs new land, hence the need for a T&W application and public enquiry for most major upgrades.
Local authorities can also have the last word on railway construction, such as the replacement of the bridge and level crossings at Steventon on the GWML.
(Shades of the HS2 "bat cave").
 

redengine

Member
Joined
1 Mar 2019
Messages
27
As far as the French network is concerned, almost certainly no.

You are absolutely correct - we have an at-capacity 4-track approach to Euston serving 3 markets (local, regional and long-distance) where it has been abundantly clear for quite some time a 6-track approach is needed. As as you say similar story with Piccadilly, New Street and Leeds.
It's only 4-track for a relatively short distance until the DC Lines split off the Slow Lines. And much of the DC Line service can go down the Bakerloo Line at Queen's Park. It's a much better set-up than, say, the Great Western Main Line, where having only 4 tracks between Old Oak Common and Maidenhead really is far from ideal (and with the advent of the Lizzy Line, the old solution of running a deliberately bad local service to deter patronage no longer works).
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,209
Location
Oxford
There are 6 tracks from Primrose Hill all the way into Euston, all are AC electrified and two have DC as well.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,097
The most congested part of the WCML is the bit south of Rugby, that is already 4 tracks (2 of them via Northampton). HS2 effectively 6 tracks it and increases the capacity massively.

The issue is the 2 additional tracks should've gone further north but we all know what happened there.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
There are 6 tracks from Primrose Hill all the way into Euston, all are AC electrified and two have DC as well.

Um, there’s only 5 running lines from Primrose Hill to Camden South Junction.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,369
Location
East coast of Yorkshire
Local authorities can also have the last word on railway construction, such as the replacement of the bridge and level crossings at Steventon on the GWML.
(Shades of the HS2 "bat cave").
I think this is at least part of the problem. Local authorities can block or frustrate major infrastructure builds that are required as part of a 'national asset'. This blocking can be for totally political reasons. Personally I would say that once a scheme has been approved by Parliment (i.e. something like HS2), or an improvement is required for something like electrification then local authorities capacity to block and frustrate should be severely limited. I would couple this with generous (above market value) compensation for those directly affected, i.e. those whose land is purchased or environment is affected directly. These sort of projects should not fall into the normal planning rules once a detailed proposal has been approved by Parliment.

I wonder how much extra cost of HS2 could be attributed to Local Authority attempts to frustrate and complicate...
 

devon_belle

Member
Joined
21 Jul 2022
Messages
642
Location
Surrey
Expanding the original alignment would also then require some sharper corners on a line that is wiggly enough as it is. Either that, or some very expensive and space-hungry realignments.