quailking14
Member
Before the Beeching cuts of the 1960s, the Chiltern mainline from Tyseley to Dorridge used to have 4 tracks, with Acocks Green, Olton and Solihull stations having 2 platforms, as opposed to one platform as they do now. I was once thinking about the practicality of restoring the 4-tracks from Tyseley to Dorridge, and restoring second platforms on Acocks Green, Olton and Solihull stations to increase capacity and train Frequency on this part of the line?