nxea321446
Member
move cancelled once again not surprised
Last edited:
move cancelled once again not surprised
It will need another refurbishment by the time it gets into service at this rate.
I thought Wabtec were a reputable and reliable company?
I thought Wabtec were a reputable and reliable company?
This hardly gives me much confidence in them being able to do the entire fleet.
To be fair, a lot of the hard design work and planning will have been done now. From now on, bar a few tweaks here and there - based on feedback or other requirements, it will be just a case of repeating the same process over and over. It should be a lot quicker.
I'd expect that, assuming they go ahead and refurbish the whole class, they wouldn't take over a year to finish each one!
I had a little look inside it earlier, it really does look neat, the vestibules are completely different, theres cool little blue LED's in the window frames, the toilets look much much better and modern, powered slidey door into first class, overall very nice. The cab is still the same tho =/
I had a little look inside it earlier, it really does look cheap, the vestibules are already filled with mud, theres tacky little blue LED's in the window frames, the toilets look all horrid and 'modern', a sure-to-fail powered slidey door into first class, overall very horrible. At least the cab is still the same.
Well, I was hoping to gaze into Ilford on my way home this evening. Unfortunately, the incident at Chadwell Heath put paid to that.
As for the timing, I thought the fleet was planned to be done over 4 years 2015-2019? I suppose that makes it about 2 weeks per unit, and given they can't have that many out of service at once I suppose that's fair. The long wait between the first unit arriving and the others being done somewhat surprises me though. Still, a fully refurbished fleet of 321s should tie in nicely with the thameslink and crossrail opening dates by the look of things.
What's wrong with the existing cab exactly?
hold fire.....this might actually make it happen.....
http://www.eadt.co.uk/news/east_ang...glia_franchise_comes_up_for_renewal_1_2275103
What's wrong with the existing cab exactly?
It did amuse me when touring the Southminster branch on a 321 that the driver sat out the turnaround period in first class reading a paper rather than stay in the cab!Wouldn't the ROSCO be proposing these upgrades primarily by itself, and adjusting the leasing costs as appropriate? At a franchise changeover, that would seem like a good time to be able to adjust the cost.
But that doesn't mean the upgrade work couldn't begin beforehand. The ROSCO can be pretty sure that these trains, especially in their refurbished state, will be in use (and in great demand) for many years to come.
ROSCO will not take the risk.
Unless there is a contract on the table then status quo.
Really? For a train like a class 321? (I'd accept that statement for some stock).
Can there be any possible risk for a near go-anywhere train like that, and other trains built around the same era?
Maybe, but I'd be pretty confident that it wouldn't happen on these trains.
Let's say these trains come off lease. The ROSCO would then have to either slash the price to get someone else to take them as is, consider scrapping them, or do the upgrade work itself and suddenly have loads of interest.
The same goes for the 317s (especially the 317/7s) and 319s.
And also the 313s and 315s in due course.
hold fire.....this might actually make it happen.....
http://www.eadt.co.uk/news/east_ang...glia_franchise_comes_up_for_renewal_1_2275103