Apparently it was cancelled because the unit isn't fitted with GSMR.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
might have been cancelled by greater anglia as there was a fatality at seven kings today wich caused major disruption

Even without the answer about the GSMR (bit of a major oversight surely?) the fatality was around lunchtime; the train was due to leave Doncaster mid morning.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,622
Location
Hampshire
Apparently it was cancelled because the unit isn't fitted with GSMR.

Now that's a good move. Let's refurbish a unit to use as a demonstrator, and forget to put one fairly major piece of equipment into it. Oops! :roll:
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Now that's a good move. Let's refurbish a unit to use as a demonstrator, and forget to put one fairly major piece of equipment into it. Oops! :roll:
GSMR doesn't come under the C6 programme, it should have been done at IL like the rest of the fleet, in theory before it went north I guess?
 
Last edited:

TEW

Established Member
Joined
16 May 2008
Messages
6,226
Been up north for so long though, had GSMR fitment even started when it moved up? It certainly wouldn't have been operational back then.
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
Been up north for so long though, had GSMR fitment even started when it moved up? It certainly wouldn't have been operational back then.

321448 went north in October 2012 - GSMR wasn't mandatory back then so even if fitment had started, this particular set may not have been done.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,865
Location
UK
321448 went north in October 2012 - GSMR wasn't mandatory back then so even if fitment had started, this particular set may not have been done.

Bah, send someone into Tesco and buy a prepay GSM phone for £9.99 and a £10 top-up card. Shove it in a Thomas and Friends case, give it to the driver, and job done.

I don't know. Yet again, it takes someone not working in the railway industry to find a quick and easy fix. ;)
 
Last edited:

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Whilst it could, it would be cheaper to do it as they have. Fitting GSM-R would need to be done anyway, you might as well do it now. However hiring a diesel locomotive and barrier wagons would be expensive. I'd imagine though that the entry into service won't have been affected much by this niggle? Or would it have caused a snowball effect of delays, as so often happens nowadays (eg 458/5)
 

nxea321446

Member
Joined
19 Oct 2012
Messages
326
Location
Burnham on crouch
i waited til 2:00 at stratford and then thought its cancelled again then i found out it went through stratford at about 2:30 so i really regreted leaving at that time
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
It is currently on its way south to Ilford. Being hauled by a loco to Peterbrough before working the rest of the way under its own power.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
there might not be a driver available that signs the traction and route (or a pilot for the route). Which may just be a case of rostering after all the false starts
 