RobShipway
Established Member
- Joined
- 20 Sep 2009
- Messages
- 3,337
Given that statement, I wonder if (and hope that) pan wells are included (for the inevitable 25kv takeover when CR2 arrives...
Any electric train delivered since 2004, has had to have a pan well so that if needed they can be transferred to AC routes and if the DC routes get changed to be AC, then the TOC has trains that can do the route after being supplied a pan.