• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

26038 to barry rail centre

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
Will 26038 visit any Preserved Railways in the near future so she can really stretch her legs?

Planned visit to the KWVR in a couple of weeks (hope Tim manages to find a suitable engine to take it there). Then on to Bo'ness I understand.
 

StripeyNick

Member
Joined
25 Apr 2012
Messages
411
Location
Cowbridge, S.Wales
Planned visit to the KWVR in a couple of weeks (hope Tim manages to find a suitable engine to take it there). Then on to Bo'ness I understand.

And possibly down to the SVR in the Autumn.

The 26 is leaving Barry in the week running up to the KWVR gala. Originally, a convoy was coming up from Swanage to pick it up then head north via the DFR. Don't know how the Swanage's 33's failure the other day will affect this.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,668
And possibly down to the SVR in the Autumn.

The 26 is leaving Barry in the week running up to the KWVR gala. Originally, a convoy was coming up from Swanage to pick it up then head north via the DFR. Don't know how the Swanage's 33's failure the other day will affect this.

it has affected it, currently there is nothing to bring the locos, but its being worked on and the gala is still a week and a half away.
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
I see the 26 is no longer able to visit Keighley. :( Nothing too serious wrong with it I hope?
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,668
I see the 26 is no longer able to visit Keighley. :( Nothing too serious wrong with it I hope?

Apparently the fault only stops it going mainline so i imagine not very serious. If you look on the diesel gala facebook event it copies an email where it is said that the 26 will come to kwvr at next oppurtunity.
 

Perseverance

Member
Joined
11 Jan 2012
Messages
35
Everyone felt a little downbeat earlier this week here at Barry on finding the bearing seal faults etc on 26038, but on the up side, the problem isn't too serious. However as the materials lead time is a couple of weeks, unfortunately the loco can't be made ready in time for the KWVR Gala. We're moving 26038 to from our Main Shed to our New Works Shed shortly where the rectification work will be carried out as soon as the materials are received.
John
 
Status
Not open for further replies.

Top