D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,200
Does that mean we have to bring the 483s back?Time to ditch the whole D-stock experiments IMO.
Does that mean we have to bring the 483s back?Time to ditch the whole D-stock experiments IMO.
The 484s on the Island Line are still unproven when it comes to the rigours of anything like normal utilisation; needing only one in service each day drawn from a fleet of four (five) is hardly taxing, even more so given the total daily run is not much more than 250 miles. When the full two-train service is running with some four car sets out, then we’ll see whether the new units are fit for purpose. At the moment, the inability to run two trains is buying them time to iron out kinks, which they really should not have had.Does that mean we have to bring the 483s back?
Oh yes, that’d be a great “climate change” initiative - recharge a battery EMU with a diesel powered lorry!!But seriously even if it was charged en route by Vivarail's mobile (lorry-based) charger…
... a parallel lorry movement required, so why not use the lorry to carry the train the long distance to avoid clogging up main line paths?But seriously even if it was charged en route by Vivarail's mobile (lorry-based) charger, there would still be

Pray tell how you’re supposed to demonstrate a BEMU without charging infrastructure on the ground?Oh yes, that’d be a great “climate change” initiative - recharge a battery EMU with a diesel powered lorry!!
Name me one New or Rebuilt train that has come into service without technical problems, in the last 20years... I'll wait.The 484s on the Island Line are still unproven when it comes to the rigours of anything like normal utilisation; needing only one in service each day drawn from a fleet of four (five) is hardly taxing, even more so given the total daily run is not much more than 250 miles. When the full two-train service is running with some four car sets out, then we’ll see whether the new units are fit for purpose. At the moment, the inability to run two trains is buying them time to iron out kinks, which they really should not have had.
== Doublepost prevention - post automatically merged: ==
Oh yes, that’d be a great “climate change” initiative - recharge a battery EMU with a diesel powered lorry!!
And yet STILL the Railways buy new stock and commits to remove the older stock by a given date because during the three course meal and associated shindig the salesperson says something like; "Oh, yes - these will be great. You'll have no problems at all".Name me one New or Rebuilt train that has come into service without technical problems, in the last 20years... I'll wait.
It rather depends on what you mean by new. Just out of the factory or a new design - because a big part of the problem is the creation of bespoke designs for everyone who orders new trains.Name me one New or Rebuilt train that has come into service without technical problems, in the last 20years... I'll wait.
Perhaps that's what 230001 is missing to make it saleable a pantograph with a fast charge for the batteries.As others have pointed out, you have misunderstood. 230003 - 230005 are not stored, they are in active service running the Marston Vale line. Bad choice of words, original post now edited. And as others have pointed out, Polmadie to Bletchley is some 360 miles and 230001's six big batteries were never designed to go that far. You wouldn't get steam locos going that distance without stopping for water let alone a battery train without charging it so perhaps it's time to ditch the whole steam experiment Mr Stephenson IMO ROTFLMAO FFS
But seriously even if it was charged en route by Vivarail's mobile (lorry-based) charger, there would still be route clearance issues such as gauging to contend with and I expect that Vivarail consider it to be more cost effective to transport it over such a distance by road rather than loco hauling it by rail, such are the upsidedown economics of today's railway system.
== Doublepost prevention - post automatically merged: ==
Oh and p.s. 230001 is still capable of moving further under its own power than HydroFlex, which needs a pantograph![]()