Trainman40083
Established Member
I am told that 57305 failed on this train at Ferry hill South Junction. Thunderbird 57008 on 1Z99 from Newark to assist. Wonder why they didn't use 66315 that was on the back. 6E97 stuck behind at Ferry hill.
It also isn't on the back.Possibly because 66 315 is unable to provide hotel power?
57012 is the Newark Thunderbird. 57008 was on the Pathfinder trip this morning.Thunderbird 57008 on 1Z99 from Newark to assist.
Is rescue loco 57008? Or the 66 on the freight?Possibly because 66 315 is unable to provide hotel power?
Sorry, I thought it was on that train.It also isn't on the back.
Neither is 57008!Possibly because 66 315 is unable to provide hotel power?
Is there heat and light on the train?We've been shoved a short distance by the freight loco which was stuck behind us to a loop the thunderbird can access
Yes , hasn't gone out today, there is a generator MK2 coach on boardIs there heat and light on the train?
That is luckyYes , hasn't gone out today, their is a generator MK2 coach on board
Is 9525 fitted with a generator? Seems unlikely given that 57306 was taken to Newcastle and back on the tour yesterday.Yes , hasn't gone out today, their is a generator MK2 coach on board
And only 215 minutes late. Driver, open it up... FULL POWERWe are back on the mainline!
We are back on the mainline!
Wasn't it just held at Retford to let 1E28 past, which has likewise been delayed in that area?Is 57012 now in trouble?![]()
Yes , I assume it failed trying to get back going after being stationaryDid it fail while already in the loop? Doesn't look to have really delayed mainline services
Yeah this would match what I expected.Yes , I assume it failed trying to get back going after being stationary
And the story ends with the train arriving into Kings Cross 152 minutes late. I hope all the passengers got home okay.