The biggest passenger issue they fixed during that work was replacing the many collapsed seat cushions - sadly at the moment that's back to being really common on ones I've ridden lately.
Almost every priority seat has collapsed cushions (atleast previously).

By the time the 92 stock is complete, they may as well skip the 96 stock refurb as they will be end of life!
Because TfL LOVES retiring trains when they should :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mrmartin

Established Member
Joined
17 Dec 2012
Messages
1,290
Its amazing - but not unique to LUL - that what used to be regarded as ‘routine’ - ranging from overhaul and repaint to a seat retrim is now regarded as a ‘project’ rather than a routine exercise. Interesting that on buses, where the operation is of course contracted, TfL require a ‘refurb’ (panels, repaint, retrim etc) of buses typically at 7 years and can do so because there is no ‘direct’ cost to them (though clearly it gets built into contract prices). Hence the buses - generally - are cleaner and smarter than tubes. But on LUL everything is seemingly reliant on a ‘bid’ for money to carry out what in many cases should be routine works (I’m not including accessibility mods in this).
Agreed. Also TfL requires even minicabs can't be 10 years old!

== Doublepost prevention - post automatically merged: ==

CLIP budget is currently £500 million. Piccadilly line stock was £1.5 billion in 2018 money, assuming same number of trains on the central line it would be £1.4 billion, or £1.9 billion in today’s money according to the inflation rate. The reality is the cost could be higher depending on the terms of the options TfL has.

This doesn’t include the cost of altering infrastructure for the trains, such as change in swept path. For the Piccadilly line this has made the total cost of the programme £3.4 billion.
Doesn't seem like a good deal to me? £500m for maybe 15 years (if you are lucky) vs £2bn for a new fleet which should last triple that, plus you don't have the very high risk of huge cancellations in the project going wrong that we've seen. (Though in fairness given the huge amount of issues all recent tfl fleets have had, maybe not quite as clear cut as it should be). And you do have to spend the money eventually anyway!

And surely it's possible to order trains that don't require loads of infrastructure changes with enough collaboration?
 
Last edited:

RUK

Member
Joined
5 Aug 2009
Messages
457
Location
East of England
CLIP budget is currently £500 million. Piccadilly line stock was £1.5 billion in 2018 money, assuming same number of trains on the central line it would be £1.4 billion, or £1.9 billion in today’s money according to the inflation rate. The reality is the cost could be higher depending on the terms of the options TfL has.

This doesn’t include the cost of altering infrastructure for the trains, such as change in swept path. For the Piccadilly line this has made the total cost of the programme £3.4 billion.
Bear in mind that the Central line trains will be longer, probably 11-car to make them at least the length of the 1992 Stock, as opposed to the 9-car 2024 Stock on the Piccadilly line, which will presumably make the Central line trains more expensive on a per-train basis - I don’t know whether or not you accounted for that in your calculation.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,494
Location
London
Any costs will have increased by much more than inflation - inputs like steel, aluminium, copper, electronics are typically 50 to 200% more expensive than 2020.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,299
Location
Bath
Bear in mind that the Central line trains will be longer, probably 11-car to make them at least the length of the 1992 Stock, as opposed to the 9-car 2024 Stock on the Piccadilly line, which will presumably make the Central line trains more expensive on a per-train basis - I don’t know whether or not you accounted for that in your calculation.
No I did not account for this, good point.
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,519
Location
London
Agreed. Also TfL requires even minicabs can't be 10 years old!

== Doublepost prevention - post automatically merged: ==


Doesn't seem like a good deal to me? £500m for maybe 15 years (if you are lucky) vs £2bn for a new fleet which should last triple that, plus you don't have the very high risk of huge cancellations in the project going wrong that we've seen. (Though in fairness given the huge amount of issues all recent tfl fleets have had, maybe not quite as clear cut as it should be). And you do have to spend the money eventually anyway!

And surely it's possible to order trains that don't require loads of infrastructure changes with enough collaboration?
But also that's £0.5bn now versus £2.0bn now - in the short-term world of politics and funding cycles, that's a future TfL's problem 15 years down the line
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,299
Location
Bath
But also that's £0.5bn now versus £2.0bn now - in the short-term world of politics and funding cycles, that's a future TfL's problem 15 years down the line
I would argue TfL isn’t that bad about planning ahead these days, and it’s more £0.5bn ‘now’ is a lot easier to raise with local government financing rules, and is actually spread over a far longer period than the cost of a new fleet.
 

WH241

Member
Joined
9 Mar 2025
Messages
10
Location
London
I just hope the rolling stock has a decent service life once fully refurbished. I seem to recall the D stock had a fairly short service life after refurbishment.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,372
Location
Hertfordshire / Teesdale
I just hope the rolling stock has a decent service life once fully refurbished. I seem to recall the D stock had a fairly short service life after refurbishment.

IIRC the D stock refurbishment was somewhat downscaled compared to earlier plans for this reason. Compared to something like the 73 stock it ended up being a largely cosmetic refurb.
 

announcements

Member
Joined
31 Mar 2011
Messages
693
The D stock seemed fairly substantive to me when you consider the new flooring, grab poles, CIS, seating, exterior work and windows being added to car ends.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,516
Location
West London
The D stock seemed fairly substantive to me when you consider the new flooring, grab poles, CIS, seating, exterior work and windows being added to car ends.
D Stock refurbishment was planned to be much more substantive. Compared with the trial refurbished unit 7008, the draught screens were not altered, the ventilation ducting remained unchanged and the lighting remained in the same position. The driver’s desk was also not updated as planned.
 
Last edited:

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
D Stock refurbishment was planned to be much more substantive. Compared with the trial refurbished unit 7008, the draught screens were not altered, the ventilation ducting remained unchanged and the lighting remained in the same position. The driver’s desk was also not updated as planned.
There were also plans to completely re-wire the D78 stock as per the 1973TS with the LUL/RSE/024 Part.6 cables to replace the old RME spec cables, this was also shelved.

It wasn't in too bad of a condition on the single core cables when it was converted to the RAT, but all of the screened cables were completely life expired so perhaps a partial re-wire could have been in order.
 

announcements

Member
Joined
31 Mar 2011
Messages
693
D Stock refurbishment was planned to be much more substantive. Compared with the trial refurbished unit 7008, the draught screens were not altered, the ventilation ducting remained unchanged and the lighting remained in the same position. The driver’s desk was also not updated as planned.
And even the D stock trains in service today have kept the same lighting and vent grilles; I saw nothing wrong with them to need changing.
 