1992 stock Refurbishment?

Chiltern 165

Member
Joined
11 Aug 2024
Messages
97
Location
London
The biggest passenger issue they fixed during that work was replacing the many collapsed seat cushions - sadly at the moment that's back to being really common on ones I've ridden lately.
Almost every priority seat has collapsed cushions (atleast previously).

By the time the 92 stock is complete, they may as well skip the 96 stock refurb as they will be end of life!
Because TfL LOVES retiring trains when they should :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mrmartin

Established Member
Joined
17 Dec 2012
Messages
1,290
Its amazing - but not unique to LUL - that what used to be regarded as ‘routine’ - ranging from overhaul and repaint to a seat retrim is now regarded as a ‘project’ rather than a routine exercise. Interesting that on buses, where the operation is of course contracted, TfL require a ‘refurb’ (panels, repaint, retrim etc) of buses typically at 7 years and can do so because there is no ‘direct’ cost to them (though clearly it gets built into contract prices). Hence the buses - generally - are cleaner and smarter than tubes. But on LUL everything is seemingly reliant on a ‘bid’ for money to carry out what in many cases should be routine works (I’m not including accessibility mods in this).
Agreed. Also TfL requires even minicabs can't be 10 years old!

== Doublepost prevention - post automatically merged: ==

CLIP budget is currently £500 million. Piccadilly line stock was £1.5 billion in 2018 money, assuming same number of trains on the central line it would be £1.4 billion, or £1.9 billion in today’s money according to the inflation rate. The reality is the cost could be higher depending on the terms of the options TfL has.

This doesn’t include the cost of altering infrastructure for the trains, such as change in swept path. For the Piccadilly line this has made the total cost of the programme £3.4 billion.
Doesn't seem like a good deal to me? £500m for maybe 15 years (if you are lucky) vs £2bn for a new fleet which should last triple that, plus you don't have the very high risk of huge cancellations in the project going wrong that we've seen. (Though in fairness given the huge amount of issues all recent tfl fleets have had, maybe not quite as clear cut as it should be). And you do have to spend the money eventually anyway!

And surely it's possible to order trains that don't require loads of infrastructure changes with enough collaboration?
 