1992 stock Refurbishment?

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,397
Not in a hurry, I love the trains as they are. Although they were perfect before their “refresh”.
They absolutely were not!

== Doublepost prevention - post automatically merged: ==

By the time the last refurbished unit rolls out of Acton, the first one will need doing again!
Guess that the limited slack means a slow pace is inevitable if a decent level of service is to be maintained.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Russel

Established Member
Joined
30 Jun 2022
Messages
5,421
Location
Lichfield
Yes they were. Their frontage looked better and the interior worked. Now there’s that unsightly mishmash between blue and red which looks untidy.

It has to be said, the interior, even with the Barman moquette, does scream early 90s, there is no hiding their age!
 

MichaelJWP15

Member
Joined
30 Jul 2025
Messages
12
Location
London
My 12 year-old son is a massive London Underground fan, knows all the history and the stock, and every time we get the Central Line he asks if we can wait until a refurbished 92 stock comes along. I always say that could take a very long time and this conversation confirms it! :)
 

Silent

Member
Joined
31 Mar 2016
Messages
737
Location
London
I think you'll be in the minority on that one!
No I like it as well, although I was born in the early-mid 90s, the interior looks a bit 80s to me in some ways, for example the obviously off-white plastic colours, but the exterior looks 90s futuristic.
 

Alxxxs

Member
Joined
14 Oct 2024
Messages
54
Location
London
No I like it as well, although I was born in the early-mid 90s, the interior looks a bit 80s to me in some ways, for example the obviously off-white plastic colours, but the exterior looks 90s futuristic.
Yes, 1992 stock is based on 1986 experimental stock (specifically the Green Prototype) which was designed in 1985
 

Sunil_P

On Moderation
Joined
31 Oct 2022
Messages
522
Location
Ilford
Rode my first refurbished train today, sat in carriage 93504. The seats definitely look much better than the original moquette, and the motors, at least to my ears, have a definite 2009 stock vibe. The interior destination dot matrix is much needed, but I noticed a significant amount of the top part of the curved windows has been used up.

Exterior-wise, the train looked identical to unrefurbished stock, with the singular exception of the different font used for the destination dot matrix.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,421
Location
Lichfield
he interior destination dot matrix is much needed, but I noticed a significant amount of the top part of the curved windows has been used up.

That's intentional isn't it, to try to control the temperature when the sun comes out?
 

Cheesepuff

New Member
Joined
20 May 2023
Messages
3
Location
London
That's intentional isn't it, to try to control the temperature when the sun comes out?
I don't think so, the connectors for the dot matrix are at the top of the display so it has to be mounted further down the window. If they were at the ends of the display it could have been mounted higher up.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,123
Location
JB
Rode my first refurbished train today, sat in carriage 93504.
Presumably 93504 is a typo for 93054, as the former isn't a 'valid' 92TS number. 93054 is, of course, part of CLIP Train 3, the first to enter service.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
I don't think so, the connectors for the dot matrix are at the top of the display so it has to be mounted further down the window. If they were at the ends of the display it could have been mounted higher up.
The displays have to be at a height as defined by the RVAR (Rail Vehicle Accessibility Regulations) and other regulations. In additon to there not really being a wiring route across the window. So it's highly unlikely that the displays could have otherwise been mounted higher.

The use of the space of the advertising panels was investigated by the CLIP (Central Line Improvement Programme) team during the inception and early stages of the projects, bit was rejected for several reasons. Height certainly did not help at the time compared with stealing some window space.
 

pdsilva

Member
Joined
17 Nov 2024
Messages
7
Location
Glasgow
Right so it was said refurbishing the current stock on the central line would be cheaper than replacing the stock. Now according to Wikipedia 160m of the 500m budget has been spent. But don’t they have a good 80 odd trains to go so wouldn’t that exceed even the cost of the 2024TS order. Or have I missed something?
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Right so it was said refurbishing the current stock on the central line would be cheaper than replacing the stock. Now according to Wikipedia 160m of the 500m budget has been spent. But don’t they have a good 80 odd trains to go so wouldn’t that exceed even the cost of the 2024TS order. Or have I missed something?
A fair amount of the upfront costs will have been spent on the research & preparation which is per-project, not per-vehicle.
 

notverydeep

Member
Joined
9 Feb 2014
Messages
1,176
A fair amount of the upfront costs will have been spent on the research & preparation which is per-project, not per-vehicle.
Indeed, plus a new fleet would also have required a very large investment in depot upgrades, infrastructure modifications and training, in addition to the base cost of the constructing the trains.

Apparently CLIP Train 1 (91111+93446+93222+91263), the third train to return to service made its passenger debut on Friday 19th September between Hainault and Woodford. These vehicles had been out of service since 2018.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,592
Location
UK
I also happened to take a refurbished unit the other day (I don't record numbers so I wouldn't know which one).

A much better experience overall. It also felt cooler than other units with much better airflow. Have they improved/upgraded the fans? There was a noticeable airflow coming out from behind the seating.
 

xtmw

Member
Joined
22 Aug 2022
Messages
189
Location
England
Units were stripped for welding repairs etc before being 'put back together' and becoming a refurbished unit so it's very likely vents were cleaned etc.
 
Last edited:

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
I also happened to take a refurbished unit the other day (I don't record numbers so I wouldn't know which one).

A much better experience overall. It also felt cooler than other units with much better airflow. Have they improved/upgraded the fans? There was a noticeable airflow coming out from behind the seating.
Perhaps just cleaned-out ducts...
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,347
Location
Hertfordshire / Teesdale
Ahead of next weeks TfL Board committee meeting the agenda papers have some interesting snippets


Per section 3.2 (b) over next 15-20 years Central line signalling will get changed to communication based

The full agenda papers link


I’d say that’s quite aspirational, given there’s no funding for Piccadilly resignalling, let alone Central.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
I’d say that’s quite aspirational, given there’s no funding for Piccadilly resignalling, let alone Central.
Two ways one could take that.

1) Yes it is aspirational, because that's a TfL board meeting.

2) Westinghouse Brake and Signal Co (Invensys, Siemens) and Bombardier (Alstom) signalling equipment for the 1992TS and Central Line is in short supply and becoming challenging to procure.
But, as a sub-option to this, a lot of the Central Line was and probably has now been moved to Westrace interlocking, so if this is true then it is either;
A) A misunderstanding in TfL and "Communications Based" means migrating the existing means of protection from the "14 code" track circuits to DTG-R, which is compatible with the interlocking, points, signal positioning, lights on sticks etc. or;
B) Very aspirational that they want to get even deeper into bed with Thales on the S60 equipment for a line with literally no direct interfaces (currently) to any other line. (Yes, I know about Ruislip, but it's via an signalled section of the depot).
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,421
Location
Lichfield
Just spotted a post on Reddit about the 92 kit stock refurbishments, this comment about a previous refurb doesn't seem right to me, so any of the 92 stock have transverse seating? I can't recall ever seeing any.

"1992/9: 4 Cars, 15 Units, Converted from 1992/2 In 2006, Longitudnal and Transverse Seats, Standard Cab, Refurbished Interior, PIS Screens, DC Motors"
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,123
Location
JB
That will refer to the W&C 92TS which received an overhaul in 2006 as part of the like upgrade.

That said, most of it is a complete work of fiction.
 

leytongabriel

Member
Joined
27 Jan 2013
Messages
639
First ride on a refurbished unit and dissapointing to see just the moquette renewed not the worn seat pads.
So the moquette is sagging loose over the worn compressed pads and passenger comfort seems to be the lowest priority again.
 

Busman

Member
Joined
4 Mar 2017
Messages
136
First ride on a refurbished unit and dissapointing to see just the moquette renewed not the worn seat pads.
So the moquette is sagging loose over the worn compressed pads and passenger comfort seems to be the lowest priority again.

Honestly, I have no words. It's the most shambolic refurb I've seen across the board and surely ... ever?

Anyone remember the district line refurbishment and how amazing and transformative that was?
 

Silent

Member
Joined
31 Mar 2016
Messages
737
Location
London
Honestly, I have no words. It's the most shambolic refurb I've seen across the board and surely ... ever?

Anyone remember the district line refurbishment and how amazing and transformative that was?
They didn’t replace the motors though. I wonder how expensive that is?
 

xtmw

Member
Joined
22 Aug 2022
Messages
189
Location
England
The refurbishment isn't focused on the cosmetic side; it's mainly aimed at replacing life expired equipment...
 