ahhh so it changed again then.
Way back when I was in the loop HOPL was broken off from CLIP so it looks like it’s happened again again…
CLIP is exceedingly delayed for it to be intergrated and then broken out from a Programme Lift twice!!!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,399
The 'programme lift' for 2024 and 2025 refers to the intermediate (not sure of the exact term) overhaul that was to have been integrated with and delivered by the CLIP project. This is the next overhaul after HOPL (which had been finished before COVID and as you say was not delivered by the CLIP project). It was the pandemic delay to CLIP which meant that this specific programme lift had to be separated from the modification works, rather than the pre-pandemic delay...

I wasn't really intending to detail the exact internal boundaries between the different departments or projects and their staff - most of which have changed (or at least changed names) since the previous HOPL programme - though CLIP is still CLIP.
Sounds like Petronius Arbiter (reputedly) at his finest....
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,503
Location
London
Are there any updates on this? Is refurbishment progressing on more trains, or has it been paused?
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,514
Location
West London
Paused, second train not expected out from Acton until August at the earliest, first train still running on Central.
 

LUYMun

Established Member
Joined
15 Jul 2018
Messages
1,382
Location
Cancelled
I’m quite late in posting this, but a FOI request to TfL declassifies the timetable notice on the current CLIP train diagram, which has been running on weekdays since 28 May and will run until 9 August, taking on two round trips between Ruislip Gardens and Hainault via Woodford. I gathered this info from the CLondoner92 website, linked here: https://clondoner92.blogspot.com/2024/06/tfl-publishes-timetable-notice-for.html?m=1

Screenshot of the timetable notice:
clip_timetable.png
 

xtmw

Member
Joined
22 Aug 2022
Messages
189
Location
England
Currently refurbed unit Will be out again on the last Monday of July
Actually it's hoped to be running on the penultimate week of July, however it's not confirmed as any run of the CLIP train is subject to change
 

Geogregor

Member
Joined
16 Sep 2016
Messages
457
Location
London
Or of those giving the specification and decisions to those running the program?

For the general travelling public such differentiation is actually irrelevant. Let's call all of them "people running the show"
 

bakerstreet

Member
Joined
29 Nov 2009
Messages
1,161
Location
-
Probably going to become the usual now until full refurb but the worst central line car I’ve been in for quite some time.
Graffiti over driver’s door and wall partition.
Scratched windows
Various other vandalism.
Very reminiscent of my memories of the 1980s.
Not blaming TfL for this – why spend money when the trains are about to be refurbished.
But there are some frustrating people around who find this a good use of their time.
It’s also possible that the spray paint or markers used are stolen too.
1722455567606.jpeg
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
I use it daily and the trains are been run in to the ground. Most are held together with tape
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,128
Location
JB
Probably going to become the usual now until full refurb but the worst central line car I’ve been in for quite some time.
Graffiti over driver’s door and wall partition.
Scratched windows
Various other vandalism.
Very reminiscent of my memories of the 1980s.
Not blaming TfL for this – why spend money when the trains are about to be refurbished.
But there are some frustrating people around who find this a good use of their time.
It’s also possible that the spray paint or markers used are stolen too.
Unfortunately by sharing the image here you’re giving the vandals exactly what they want: publicity. Your words said just as much as the picture did.

I agree TfL/LU are largely blameless, but for different reasons: the cutting of the operational grant has had significant impacts and proactive graffiti removal is one of them. It might be a cliche at this stage, but there is plenty of merit in “LU is the only urban railway in Europe to not receive state funding”, even if it’s not technically true. The fact that LU (despite the fact they are actually making a profit and subsidising the rest of TfL) are still having to find ways to make cuts probably says everything it needs to.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,843
I agree TfL/LU are largely blameless, but for different reasons: the cutting of the operational grant has had significant impacts and proactive graffiti removal is one of them. It might be a cliche at this stage, but there is plenty of merit in “LU is the only urban railway in Europe to not receive state funding”, even if it’s not technically true. The fact that LU (despite the fact they are actually making a profit and subsidising the rest of TfL) are still having to find ways to make cuts probably says everything it needs to.
The grant from central government was replaced by business rates retention going to TfL. If they’re cutting things despite receiving more money, what are they actually spending it on?
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
The grant from central government was replaced by business rates retention going to TfL. If they’re cutting things despite receiving more money, what are they actually spending it on?
Rebranding a load of overground stations…?
Project Managers?
 

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,503
Location
London
Rebranding a load of overground stations…?
Project Managers?
The overground rebranding cost is £6 million. https://www.london.gov.uk/who-we-ar...e-log/foi-overground-line-rebranding-mar-2024

This represents less than 1% of the £700 million value of the cut to TfL's grant. https://www.london.gov.uk/tfl/tfl-funding-settlement-another-short-term-sticking-plaster

Or, just over 1% of the £500 million cost of the Central Line Improvement Programme.

Therefore, I don't think refreshing the station signage on the overground stations (some of which has probably been in situ for the entire 17 years of Overground) is a direct cause of situations such as delays to the CLIP, or a cutback on non-essential maintenance like graffiti repair.

The fact is the massive cuts to TfL's budgets, and the more restrictive access to investment funding from the Treasury (for e.g. New fleets and heavy refurbishments such as the CLIP) are the major causes.

Also, I'm sure that if TfL did repair graffiti on a unit that was about to be stripped out and refurbed anyway, someone would come along and decry the waste of money :D
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,843
The overground rebranding cost is £6 million. https://www.london.gov.uk/who-we-ar...e-log/foi-overground-line-rebranding-mar-2024

This represents less than 1% of the £700 million value of the cut to TfL's grant. https://www.london.gov.uk/tfl/tfl-funding-settlement-another-short-term-sticking-plaster

Or, just over 1% of the £500 million cost of the Central Line Improvement Programme.

Therefore, I don't think refreshing the station signage on the overground stations (some of which has probably been in situ for the entire 17 years of Overground) is a direct cause of situations such as delays to the CLIP, or a cutback on non-essential maintenance like graffiti repair.

The fact is the massive cuts to TfL's budgets, and the more restrictive access to investment funding from the Treasury (for e.g. New fleets and heavy refurbishments such as the CLIP) are the major causes.

Also, I'm sure that if TfL did repair graffiti on a unit that was about to be stripped out and refurbed anyway, someone would come along and decry the waste of money :D
Yes, they no longer have the £700m grant, but instead they’re getting even more from the rates retention https://www.gov.uk/government/news/...t-funding-to-upgrade-londons-transport-system
TfL now benefits from around £2 billion every year in retained business rates following a measure in the 2021 Spending Review
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
As a daily commuter on the Central line I have found the entire refurbishment a joke and am still yet to see the first one. Whoever is in charge needs a major career change
 

Crithylum

Member
Joined
21 May 2024
Messages
333
Location
London Borough of Ealing
Saw a 92 stock poking out of Ealing Common depot today. From a distance it looked much better externally than the in service trains at Ealing Broadway. Also the ‘shark teeth’ (as I like to call it) stickers were on the doors. Unsure about what actual work has been done on this train.
 

Attachments

  • 878D51E6-C062-4A0C-8041-9C277C34B3CF.jpeg
    878D51E6-C062-4A0C-8041-9C277C34B3CF.jpeg
    744.2 KB · Views: 159

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,128
Location
JB
This is one of the CLIP trains (I forget the nominal numbering) and has been out and about on the South Ealing test track recently.
 

danielnez1

Member
Joined
14 May 2012
Messages
311
Location
Seghill
I use it daily and the trains are been run in to the ground. Most are held together with tape
From my experience since the 00s, they have always been in a state of disrepute in one way or another. My guess is that they were produced during a transitional period of manufacturing for BREL/ABB (moving to final assembly), a new bodyshell design etc. IMHO in many ways the whole fleet acted as a prototype for future fleets (and perhaps Metro-Cammell would have been a better builder given their established experience with final assembly practices). That is all moot now I guess.
 
Joined
28 Mar 2024
Messages
41
Location
N/A
From my experience since the 00s, they have always been in a state of disrepute in one way or another. My guess is that they were produced during a transitional period of manufacturing for BREL/ABB (moving to final assembly), a new bodyshell design etc. IMHO in many ways the whole fleet acted as a prototype for future fleets (and perhaps Metro-Cammell would have been a better builder given their established experience with final assembly practices). That is all moot now I guess.
I Cant remember why, but I think the bad state of the Juniper trains introduction, was a final nail in the coffin for Metro Cammel, or am i wrong?
 

Top