• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

1992 stock Refurbishment?

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,265
So having spent all the money and all the time that some of the trains are now underway, now you think would be the time to cancel it - when, as others have said, there isn't a realistic option to replace the 92s and they won't survive without any work being done? It seems daft to me to chuck away all the time and money, the programme might as well be seen through now.
At the rate they're going, the final train emerging from the CLIP programme will be driven straight to the scrap yard.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Recessio

Established Member
Joined
4 Aug 2019
Messages
1,527
Location
London
At the rate they're going, the final train emerging from the CLIP programme will be driven straight to the scrap yard.
Haha true! But, that's better than being driven into the scrapyard ten years before any reasonable prospect of a replacement.
 

RUK

Member
Joined
5 Aug 2009
Messages
467
Location
East of England
At the rate they're going, the final train emerging from the CLIP programme will be driven straight to the scrap yard.
London Underground are using very old Tube trains for some of their engineering trains - presumably the refurbished 1992 Stock could be used for those, once they’ve been replaced?
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,423
London Underground are using very old Tube trains for some of their engineering trains - presumably the refurbished 1992 Stock could be used for those, once they’ve been replaced?
Assuming that they would fit everywhere that seems to be a possibility.
 

Brooke

Member
Joined
13 Jan 2020
Messages
321
Location
Switzerland
Last week there were Minor Delays (and on Friday Severe Delays) “due to Train Cancellations”. And back to Minor Delays again this evening.

Does anyone know if this is down to train unreliability, staffing gaps or other? Its certainly not due to graffiti removal, because many trains are running covered in it again!
 

announcements

Member
Joined
31 Mar 2011
Messages
698
So having spent all the money and all the time that some of the trains are now underway, now you think would be the time to cancel it - when, as others have said, there isn't a realistic option to replace the 92s and they won't survive without any work being done? It seems daft to me to chuck away all the time and money, the programme might as well be seen through now

My point being they ceased on the 1972MkI refurbs, which were 3 units - 2 less than the current CLIP progress. It isn't too late at all, when you consider how many more are left, and rising costs. As you say, others have said what they said and put forward a good case to continue, but this forum should be about discussion and debate and I make no apologies for making a suggestion.
 
Last edited:

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,389
Location
Hertfordshire / Teesdale
My point being they ceased on the 1972MkI refurbs, which were 3 units - 2 less than the current CLIP progress. It isn't too late at all, when you consider how many more are left, and rising costs. As you say, others have said what they said and put forward a good case to continue, but this forum should be about discussion and debate and I make no apologies for making a suggestion.

Ceasing CLIP is certainly something that *could* be done. The question is at what consequence, how likely that consequence might be, and whether that is considered acceptable.

I think the generally accepted view is that “do nothing and let the fleet continue as is” would probably eventually end up with an untenable level of fleet availability, possibly reaching the point where the Central Line couldn’t deliver a service in anything like its normal form. There are also potential indirect and maybe even direct safety issues to consider with this.

There’s also the accessibility work, which has already dragged on well past 2020. Again, in theory exemptions can be applies or legislation changed, but there are consequences to this.

The other option is to downscale CLIP to the absolute bare minimum, although what that might be, what it would save, and how this would work out, is anyone’s guess.

CLIP has already been value engineered. Really it should have happened many years ago. With no fleet replacement on the horizon my own view is that it would be risky to cancel it, as it would be taking a significant gamble on a uniquely troublesome fleet that has given trouble right through its life almost from day one. None of us has a crystal ball, but LU’s engineers are best placed to determine what is needed to keep the fleet running. What is more unfortunate is that LU’s leadership have allowed this all to drift essentially for decades.

If it wasn’t for the fact that LU have had enough of a challenge replacing the Piccadilly fleet, let alone the Bakerloo fleet which may well see 60 years in service, CLIP probably wouldn’t have happened in the first place and we’d have a replacement fleet on the horizon. Worth remembering when people claim London’s transport infrastructure is gold-plated compared with other places.
 

Top