Am I correct in thinking that the only thing that prevents this is the way the pins are wired on the couplers and it was a Network SouthEast wheeze to prevent Regional Railways pinching their shiny new trains?
If this is true, does GWR have any plans to rewire the 16X to standard so that they can multiple work within their entire DMU fleet?
If this is true, does GWR have any plans to rewire the 16X to standard so that they can multiple work within their entire DMU fleet?