• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. N

    Cambridge South new station opening

    Seems to vary by time of day and wind direction. It is certainly noticeable at the allotments and in Hobson square at times. In other news spotted these interesting metal sleepers with hollow centres. There is also a coming soon notice for the coffee shop.
  2. N

    Cambridge South new station opening

    Anyone know if the new (manual?) cut out just north of long road was used here?
  3. N

    Cambridge South new station opening

    And on the other side the list continues with Tesco, Gail’s and Subway. While loss of M&S would be felt I assume EWR will bring expansion on the eastern side and maybe on or two retail outlets to go with it. Long past are the days where M&S was the only retail offering on station road.
  4. N

    Cambridge South new station opening

    1T11 is now 5T11 and on the move?
  5. N

    Cambridge South new station opening

    Presumably that means 1T11 is fouling the points south of Cambridge South.
  6. N

    Cambridge South new station opening

    I see the disruption template has not been updated to mention Cambridge South yet: https://www.nationalrail.co.uk/service-disruptions/cambridge-20260703/ (Stations not served lists include numerous local stations, but not Cambridge South)
  7. N

    Cambridge South new station opening

    Disruption to the wires at 'Cambridge' today - I wonder if we will see any services reversing at Cambridge South. As for the lack of enclosed waiting areas - one thought I had on the topic is that there are a *lot* of trains and you are unlikely to be waiting for very long.
  8. N

    Cambridge South new station opening

    Both entrances have 2 wide and 3 standard gates.
  9. N

    Cambridge South new station opening

    I have been past the last couple of days in the morning and there was a healthy stream of people exiting, but I would not call it crowded. Not huge numbers heading to the station but I expect London commuters would be earlier. Of course it is a site with 24/7 activity and shift work so the...
  10. N

    Cambridge South new station opening

    A big thank you is indeed due to the whole team that worked on the station, @mr_moo included. Various friends/neighbours/colleagues who have visited the station or seen the news have been universally positive and/or jealous of our new local facility. Need to keep reminding them it's really for...
  11. N

    Cambridge South new station opening

    I'm not entirely sure that's accurate - at least one older college was extended and refurbished in brick prior to the founding of Downing in 1800. I fear this takes us away from railway matters though :-). The exception being the recent (2019) Anne McLaren Building which I believe is a...
  12. N

    Cambridge South new station opening

    Photo for reference of the charger. My assumption is that a double socket became a single socket with key switch somewhere in the design process.
  13. N

    Cambridge South new station opening

    Oh no. (Edited above).
  14. N

    Cambridge South new station opening

    And here are an assortment of more general photos of the station, both interior and exterior. They show the interior wood paneling and ceiling, the text based public artwork, and very red balustrade on the bridge stairs. Exterior photos show the platform environments, the emergency escape over...
  15. N

    Location Cabinets in hot weather

    On a topical note here are a couple of brand new cabinets at Cambridge South station today. Both sounded like they had powered ventilation hard at work in the sun. I don't know if they are Signalling or station services but they look suitably industrial.
  16. N

    Cambridge South new station opening

    I had a good look around this afternoon. It's very impressive on the inside! The staff were kindly allowing visitors through the gateline to have a wander around. Plenty of families, railfans and 'influencers' about. Here is a selection of photos showing GBR branding, posters, and the station...
  17. N

    Cambridge South new station opening

    Since there are questions on branding here is a picture of the type of thing that is being used on the stairs. More later…
  18. N

    Cambridge South new station opening

    I think it was demolished some time around 2018. I had a quick look at the new station site today and took a few pictures from new angles. Lots of activity, but opening preparations rather than construction. The fences have been moved back much closer to the station, the coffee stall ...
  19. N

    Cambridge South new station opening

    Surely a missed opportunity to launch the Great British Railway Sandwich!
  20. N

    Cambridge South new station opening

    What sort of testing can we expect to happen over the next couple of weeks?

Top