• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Nottingham59

    Electrifying Mainlines for Battery Train operation (using Class 897 as an example

    This thread is to discuss the electrification needed on mainlines for 125-mph capable battery trains. To start things off, these are my thoughts for main lines in my part of the world (i.e. the MML and the Cross Country route) BEMU SPECIFICATION It seems to me that the 10-car Class 897...
  2. Nottingham59

    Minimum height of a railway flyover?

    If a flat rail junction is to be replaced by a flyover, say at Newark flat crossing, then how high does that flyover have to be? Obviously, it will need to accommodate W12 gauge rolling stock on the lower track, plus an allowance for electrification. Add the depth of the upper beam supporting...
  3. Nottingham59

    What lessons do Ember Coaches have for battery operation on the railways?

    Driving to John O'Groats last week, I was struck by the Ember electric coach service that now runs from Inverness to Wick and Thurso. I was genuinely surprised to see these EVs, as the Far North Line has always been held up as an example of a route that would be impossibly far for battery...
  4. Nottingham59

    Battery boost for grid feeders?

    Many grid feeders are in continuous use - supplying relativel steady levels of power to a succession of trains, such as around London or on the WCML north of Weaver. But grid feeders on less intensively used parts of the network have a much peakier demand curve. They may need to supply tens of...
  5. Nottingham59

    BEMU replacement for Class 170 regional trains - performance and endurance on battery

    To understand the implications of converting regional train services to battery or tri-mode operation, I thought it would be useful to consider what range and endurance would be possible with current battery technology. EMR use class 170s, so I'm going to propose a battery trimode for regional...
  6. Nottingham59

    How big a battery would a freight locomotive need to be useful on the GB network?

    How big a battery would a battery-electric freight locomotive need to haul a full length intermodal from, say, Felixstowe to Hams Hall or Doncaster via non-electrified lines? A maximum intermodal train is up to 775m long and around 1800t trailing weight. This is my thinking so far: 4M23 left...
  7. Nottingham59

    Eurostar Chaos: 30/12/2025.

    I see there's a power problem in the Channel Tunnel https://www.bbc.co.uk/news/live/c93wkw37p0pt EDIT: A Shuttle has failed in the tunnel. https://www.eurostar.com/uk-en/travel-info/travel-updates/49376
  8. Nottingham59

    Could SFCs with battery boost be the way to reinforce 25kV electrification?

    Issues with getting grid connections include 5-year leadtimes (or more), and needing to tap into 230kV or 400kV circuits to absorb the phase imbalances of 25kV electrification. It seems to me that the way forward is Static Frequency Converters (SFCs) that use a balanced 3-phase supply to feed...
  9. Nottingham59

    Modelling performance and range of Hitachi 80x Trimode trains, and implications for future mainline electrification

    BATTERY TRAIN ENDURANCE When thinking about electrifying the rest of the GB mainline network, it seems to me that one key constraint is going to be the performance and range of 125mph-capable battery units. I have three hard pieces of evidence to help model this; if anyone has any better data...
  10. Nottingham59

    Could EMR run 260m trains into St Pancras with SDO on the last carriage?

    Platforms 1-4 at St Pancras have a working length of 240m, so in its franchise bid EMR commissioned the 810, a new version of the AT300 from Hitachi with 24m coaches just to fit 2x5-car trains. Speculating idly, I was wondering if instead they could have ordered standard 5-car 80x with 26m...
  11. Nottingham59

    Recharging battery trains from 25kV overhead line

    Most battery EMUs and tri-mode trains are recharged from 25kV overhead lines. What needs to be considered when designing OHLE in areas where battery EMUs are likely to be used in the future (which probably means all areas)? Particular questions I have include: What currents do BEMUs take when...
  12. Nottingham59

    HS2 Reset: Evidence to Transport Committee - 9 July 2025 "Total overspend on high-speed rail could be as much as 100%"

    I see that Mark Wild (CEO of HS2 Ltd) is now saying that the overspend on HS2 phase 1 is likely to be 50% to 100%. https://www.theguardian.com/uk-news/2025/jul/09/hs2-already-billions-over-budget-with-work-just-over-halfway-done-says-rail-boss EDIT: The official video of the Transport...
  13. Nottingham59

    How to increase capacity on the Birmingham-Derby line

    The Integrated Rail Plan (now defunct) envisaged building HS2 phase 2bEast as far as East Midlands Parkway. It would be much cheaper to build a connection from HS2 to the 125mph Birmingham-Derby line, north of Kingsbury Branch Junction, and run say 2tph to Derby and on to Sheffield. This would...
  14. Nottingham59

    Trivia: What sections of unelectrified line carry the most trains per hour?

    Considering lines that are not yet electrified, what sections carry the most trains per hour (tph)? At this stage I'm only considering timetabled passenger services, and not including freight or ECS/NR movements. Or station throats. I can think of the following: Dore - Sheffield (8 tph, I...
  15. Nottingham59

    If HS2 phase 2a gets built, what high speed services could run?

    What high speed services could run if phase 2a gets built to Crewe? Building phase 2a of HS2 to Crewe would bypass the bottleneck of Colwich, but without the tunnel to Manchester that would just transfer the constraints to north of Crewe. Crewe-Weaver on the WCML is full; the network south of...
  16. Nottingham59

    Discontinuous electrification to Penzance - Worked example for Cross-Country 80x Hitachi Trimode

    To help me understand what batteries and discontinous electrification would mean for the rail network, I've worked out what would be needed for XC to get to Penzance with 80x trimodes. The figures are based on the 802207 trial which had two diesel power units and one 577kWh battery pack. This...
  17. Nottingham59

    Static Frequency Converters (SFCs) - capabilities and scope for battery train operation

    Can anyone answer a couple of questions on static frequency converters? I'm asking as I would like to understand the scope for using SFCs for isolated islands of electrification at places like Exeter or the Highlands. Note this thread is only for actual SFC capabilities - not for speculation...
  18. Nottingham59

    High Speed Rail Group calls for affordable plan for HS2 phase 2a and Euston

    I see the High Speed Rail Group has published their proposals for continuing HS2 phase 2a. https://www.rail-leaders.com/industry-news/high-speed-rail-group-calls-for-new-affordable-and-realistic-hs2-plan/
  19. Nottingham59

    Splitting long trains at short platforms

    Is it feasible to split or join a train at a station where the train is longer than the platform? For instance, could a 400m HS2 train split at Preston or Carlisle or Carstairs before the platforms there are lengthened to 400m? Presumably the train could come to a halt without making an...
  20. Nottingham59

    The biggest rail transport flows, measured in passenger-km

    I was looking at @RailAleFan 's extremely useful Flow Statistics website, which lists the top 100 station-to-station passenger flows, as reported by ORR. I see the biggest flow is Liverpool St to Tottenham Court Rd at 8000 Pax/d, but those stations are only a kilometre or so apart. Which got me...

Top