Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Been doing some historical research into where alarms would have gone but have not been able to identify any location. I know they would have been removed now like a lot of other places but does anyone have any thoughts or suggestions.
Can anyone tell me what phones there are in these rooms and where they would go to. I was sent a photo (attached) and there is no dial so between two points?
A couple of things
1. At Finsbury Park the signs they had for when trains entered and left the line have they been changed or is the wording still the same., cut out tripcock & cut in tripcock.
2. At Seven Sisters the signals that take you to depot would display a green aspect with indictor...
Bit of a historical question, does anyone know what room the Operating Manager was in before all the changes I think in the 1980s. I know the Head Controller was in room 222 with the Operating Manager nearby.
Hoping someone can help, I am after the following editions of Underground News well specific artiles from them.
Issue 445 January 1999 Part 1 of restricted running routes
Issue 446 February 1999 Part 2 of restricted running routes
Issue 559 July 2008 What can run where
If someone has these...
Now I know that the signal box has been taken out but I'm after someone with a really good knowledge who might be able to shed some light.
At Hammersmith lever 23 was spare but I have read that it was intended to be an auto lever but was taken out, what sort of auto working could there be I...
I have a number of questions here is the first.
I noticed at the Elephant & Castle at the north end there is a rear cab clear sign but next to it is another one never seen it lit up, anyone know what it is for and how it worked?
Part 2
At Charing Cross north end it seems to be a sort of square...
Can anyone help on the driver's door (outside) there is a switch or something visible can anyone tell me what it is for. I'm sure somewhere there is an explanation but can't find it TIA.
Here is a photo https://www.flickr.com/photos/24772733@N05/10425751054/sizes/l
I don't want to put this in with SSR resignalling but as Hammersmith signal box has closed ( I assume that it can be reopened if needed) and the new signalling seems to be working okay at the moment, what happens the the signallers whose signal box closes do they 1) move to another signal box or...
On the Bakerloo line trains going north can do a main line shunt and come back south at Lambeth North/Piccadilly Circus/Paddington. The signal controlling this move is a colour light but at the Elephant & Castle it is a proper shunt signal.
So my question is why colour light signals instead of...
Hope someone can help, I noticed on the NB at Piccadilly Circus Bakerloo a blue box it said clips and scotches. so if there was a need to secure the points, can anyone tell me where they are located at Elephant/Lambeth/Baker Street/Paddington/Queens Park. I have not seen the blue boxes before on...
Can anyone explain why the levers are different or is it me. There seems to be two levers staggered and three levers staggered, Have attached links to show, I am sure it can't be due to the number of levers but you never know...
I have been told that the new control room now controls from Cockfosters to Chiswick Park with the rest of the line being done later this year. Can someone tell me does the new control room also control the District line at Hammersmith as well or is it shared with Earls Court.
Sorry another question on the Waterloo & City hoping someone can help regarding trainstops. It appears that before LU took over instaed of being numbered that were each given a letter, does anyone know what these were.
When LU took over control was from a NX panel then a new control room came in 2007. Does anyone know where the new control room is located, I have been told it's in the depot. The old NX panel is the back up? and is there a maintenance panel somewhere.
Does anyone know what the little boxes are at the north end of the northbound platform are for, they are above the information board. They look like they can light up.
Hoping someone can help, I know that these are not working or whatever you call it but my question is to do with the ones that could be remotely controlled. Now as I understand it was open, close and auto. Can anyone say what happened to the signals in the different postions.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.