    Getting passengers to spread out along the platform

    On most trains outside of peak hours, passengers seem to stay fairly near the entrance to the station, meaning some doors are very busy, whereas others further away from the entrance are much less busy. Gatwick is the most extreme example I can think of, but it seems to happen at most...
  2. A

    Lack of train orders in the next five years & what should be done about it

    Is anyone else worried by the fact that there currently seem to be very few orders for new rolling stock? In the five years from 2022 to 2026 (inclusive), we've had the following come into service: 99, 196, 197, 230, 231, 398, 701, 730, 756, 777, 805, 807 and 810. In the five years from 2027 to...
  3. A

    HS2 Washwood Heath depot contract signed

    HS2 admits it got its numbers wrong as Birmingham train depot let at more than three times original £250m budget HS2 has finally signed the contract to build Washwood Heath depot - I wonder how long that will take to build!
  4. A

    Effect of higher petrol prices on rail usage?

    I can't see another thread on this, so just wondering if there's been any short-term impact on rail usage due to higher fuel prices since the start of March?
  5. A

    Recent increased safety/accessibility requirements since 2010

    Trains introduced since 2010 have been required to have increased safety and accessibility features such as automatically opening doors and disabled toilets in each carriage, meaning that (while these things are obviously a good thing overall) the introduction of these trains didn't increase...
  6. A

    Civils work on 50-mile test section of HS2

    HS2 have said that they are focusing civils work on a 50 mile section between Washwood Heath and Wendover, so that tracks/signals etc can start construction and then testing can begin earlier on that section. HS2 marks a year of progress ahead of major reset What do people think will be the...
  7. A

    How could service patterns through Colwich Junction increase capacity

    Once the HS2 connection to the WCML at Handsacre opens, Colwich Junction will become a key bottleneck as the HS2 trains to Scotland & the north of England plus existing trains will all still have to go through the junction. There have been threads already about remodelling the junction, using...
  8. A

    Cross-country overcrowding: what could be done?

    As long as I can remember, XC services have always been overcrowded. Has that changed with the arrival of the ex-Avanti 221s or is it as bad as ever? In particular, are more services now made up of coupled units?
  9. A

    Potential new service from Birmingham to Manchester Airport

    mods note - split from this thread As in a WMR service from Birmingham to Manchester Airport?
  10. A

    Predictions for when York to Leeds stopping services will go to electric traction

    Anyone know when the Leeds to York section will be ready for electric trains to run? I'm wondering if the Leeds to York via Cross Gates service can be run by EMUs anytime soon
  11. A

    Will the Class 197s be the last pure diesel unit to be ordered?

    Will all future orders be for at least bi-modes, or will Northern/GWR/someone else order more DMUs? (I'm excluding locos from this question as they seem more likely to need diesel)
  12. A

    Birmingham Interchange HS2 station

    According to Rail Technology Magazine, full construction will only start in early 2026 - how long do people think it will take to build the (four platform) station? HS2 Solihull: 15 Bridge Beams Installed at Interchange Station
  13. A

    East Midland Railway 158 and 170 replacement

    Are there any plans for EMR to get replacements for the 158s and 170s? If not, will they have to wait for cascaded 170s from Northern (from 2030 onwards!) to replace the 158s or are there other units which might be going spare?
  14. A

    HS2 fare income from OOC

    Once HS2 Phase 1 opens I have done a quick calculation of fare income from Old Oak Common. I think there should be 6tph, of which 3 will be 200m sets and 3 will be 400m sets The former will have 500 seats and the latter 1,000, so that's 4,500 seats per hour in each direction, 9,000 per hour in...
  15. A

    Predictions regarding the effect of HS2 opening to Old Oak Common on overcrowding at Euston?

    Do people expect that once HS2 opens to Old Oak Common that the overcrowding will get a bit better? Or will the extra people on the services that use the freed-up capacity more than compensate for fewer long-distance passengers?
  16. A

    Services to Chester, Shrewsbury & North Wales post-HS2 Phase 1

    Once HS2 Phase 1 opens, there should be a lot more capacity at Euston for services to Chester, Shrewsbury & North Wales. Are there enough Class 805s to take advantage of this, or will they continue to run the existing service but just with fewer delays? Furthermore, what do you think they should...
  17. A

    Avanti Class 221s to Cross Country

    Anyone know how many 221s are remaining with Avanti and when the remaining ones will transfer across? According to the 805 thread, all booked services will be 805s from December, so presumably they will have transferred by then. (I did search for a thread on this topic but could only find...
  18. A

    MML Services following electrification to Nottingham

    According to the MML electrification thread, there were surveys done of Nottingham station in preparation for possible electrification. If this was done, what improvements could be made to MML services? Could we see the extension of the Connect services up to Nottingham, or at least Leicester...
  19. A

    Last part of HS2 civils work to be finished

    As I understand it, tracklaying will not start on HS2 until all the civils work (except for the stations) is complete. I haven't seen anything due to finish after 2025 - is that right and what will be the last piece of civils work to be completed?
  20. A

    HS2 Construction overall timeline