absolutelymilk
Established Member
- Joined
- 18 Jul 2015
- Messages
- 1,588
Once the HS2 connection to the WCML at Handsacre opens, Colwich Junction will become a key bottleneck as the HS2 trains to Scotland & the north of England plus existing trains will all still have to go through the junction. There have been threads already about remodelling the junction, using ETCS or creating a bypass to increase capacity, but my question is whether there is anything that could be done by simply changing service patterns or speeds through the junction?
For example, would lowering the maximum speed through the junction help reduce headway between trains, or are there things to be done by e.g. scheduling northbound trains going via Stoke in a bunch so that they only occupy the junction for a shorter amount of time?
For example, would lowering the maximum speed through the junction help reduce headway between trains, or are there things to be done by e.g. scheduling northbound trains going via Stoke in a bunch so that they only occupy the junction for a shorter amount of time?