absolutelymilk
Established Member
- Joined
- 18 Jul 2015
- Messages
- 1,606
Will all future orders be for at least bi-modes, or will Northern/GWR/someone else order more DMUs? (I'm excluding locos from this question as they seem more likely to need diesel)
I can't remember the exact dates for the orders, but TfW ordered class 231 Flirt DMUs from Stadler at the same time as the CAF 197s.Will all future orders be for at least bi-modes, or will Northern/GWR/someone else order more DMUs? (I'm excluding locos from this question as they seem more likely to need diesel)
If any more diesel-only passenger trains are ordered that would be a monumental failure. I am still of the opinion that the last diesel-only train should have entered service in 2015, and every order since then should at least have been a bimode.Will all future orders be for at least bi-modes, or will Northern/GWR/someone else order more DMUs? (I'm excluding locos from this question as they seem more likely to need diesel)
Last I heard (which admittedly was a few years ago)Translink had no intention of ordering any new DMUs ever again. The class 3000 trains are from 2004/2005, but the class 4000 trains are from 2011/2012 for the original 3-car sets, with extra coaches built in the early 2020s added to expand capacity.The PDFs aren't currently loading for me, but I don't think the Northern / Irish All-Island Strategic Rail Review recommended electrification to Larne or Portrush. As half of the NI rolling stock's older than twenty and none of the network's currently electrified, maybe there'd be more DMUs there in a decade or two?
With the benefit of hindsight, I agree that no more diesel-only passenger units should have been built for the UK since 2015 (I think that would make the class 172s the last diesel-only units built).If any more diesel-only passenger trains are ordered that would be a monumental failure. I am still of the opinion that the last diesel-only train should have entered service in 2015, and every order since then should at least have been a bimode.
The 172s would've been the last for GB; the original build of NI C4Ks would've been the last for the UK.With the benefit of hindsight, I agree that no more diesel-only passenger units should have been built for the UK since 2015 (I think that would make the class 172s the last diesel-only units built).
With 2015 and an average lifespan for DMUs of 35 years, there are no diesel only trains left in 2050, meaning it is possible to have a fossil-free railway without retiring any trains early.The 172s would've been the last for GB; the original build of NI C4Ks would've been the last for the UK.
Why 2015 specifically?
Ah OK, thanks - gotcha.With 2015 and an average lifespan for DMUs of 35 years, there are no diesel only trains left in 2050, meaning it is possible to have a fossil-free railway without retiring any trains early.
That was my reasoning at least!
Could they end up becoming Scotrail's fleet for the Far North and Kyle of Lochalsh? These would be top contenders for the last pure diesel routes, but would need the special token system installed of course.Many 197 routes could be transferred if needed so the 197s can go to longer diesel routes. Same applies with the 196s and 195s. GBR should make some of these cascades more likely.
Not a good look when competing coach services are battery operated today.Could they end up becoming Scotrail's fleet for the Far North and Kyle of Lochalsh? These would be top contenders for the last pure diesel routes, but would need the special token system installed of course.
And fitted with highly polluting tyres...Not a good look when competing coach services are battery operated today.
I know that comparing the UK's railways negatively with Switzerland's in non-passenger fare aspects is shooting fish in a barrel, but given Switzerland has a completely electrified network, does it have any lines of significant length with less than an hourly service? (Admittedly I suspect the answer is no anyway due to the focus on Taktfahrpläne.)I suspect that some routes will always be too long for battery operation (e.g. Inverness/Wick, Glasgow/Mallaig), but too quiet to justify electrification, and that some partly-diesel bimodal trains will always be needed.
Surely rapid charge - perhaps with short lengths of wires - solves that?I suspect that some routes will always be too long for battery operation (e.g. Inverness/Wick, Glasgow/Mallaig), but too quiet to justify electrification, and that some partly-diesel bimodal trains will always be needed.
Not muck of a problem outside urban areas, and over the medium term amenable to tech solutions. (And not as bad as wheel/brake pollution in underground railways!)And fitted with highly polluting tyres...
German ETA 150 battery railcars had a 400km range, using lead acid batteries without regen braking, in the 1980s. There is nowhere in Britain that battery trains couldn't be deployed with existing tech that would require more than just charging infrastructure at each or one terminal.I suspect that some routes will always be too long for battery operation (e.g. Inverness/Wick, Glasgow/Mallaig), but too quiet to justify electrification, and that some partly-diesel bimodal trains will always be needed.
I am not saying electric coach is better, just that even with tyre wear, it is lower on emissions and likely air pollutants than an existing diesel train.And fitted with highly polluting tyres...
Unlikely; the Scottish Government / ScotRail have a net zero target by 2045 so they'll need to eliminate diesel sooner than England (where, sadly, even the 2050 target seems likely to be delayedCould they end up becoming Scotrail's fleet for the Far North and Kyle of Lochalsh? These would be top contenders for the last pure diesel routes, but would need the special token system installed of course.
Interestingly, even in those remote areas some electrification is expected eventually; the only place where green meets red on that Transport Scotland map appears to be in the Helensburgh area. Ie. although Kyle, Wick, Thurso, Fort William, Oban and Mallaig and Stranraer are all shown as requiring 'alternative traction' permanently, only the West Highland (from the Helensburgh area to both Oban and Mallaig) isn't expected to gain any more OHLE. The other three/four routes (ie. Wick/Thurso, Kyle and Stranraer) are shown as receiving partial electrification (eg. about half the distance between Ayr and Stranraer) between 2035 and 2045.I suspect that some routes will always be too long for battery operation (e.g. Inverness/Wick, Glasgow/Mallaig), but too quiet to justify electrification, and that some partly-diesel bimodal trains will always be needed.
The train still needs traction motors, traction power cables and current collector devices (eg. pantographs and/or third-rail shoes). The class 19x DMUs have none of these things, as far as I know, and at least some of them would only be 25 years old in 2050.Surely rapid charge - perhaps with short lengths of wires - solves that?
Compared to environmental issues, I'm relatively uninterested in the financial elements of business cases; but I think both sides can be rather inconvenient to the other at times. Financial waste is one thing, but I'm even more concerned about the wasted energy of producing materials for significant components (like bodyshells) only to scrap them more often than necessary.Isn't the IEP Hitachi contract based on 27 years service? 35 years is more of a rule of thumb for life expectancy of a train than the basis of all business cases.
Wikipedia suggests otherwise in the case of the 195s, claiming that "The units were designed with a projected lifespan of 35 years and it was planned they will operate beyond 2050 with maintenance and refurbishment". If Wiki at least has the dates correct, then delivery in 2017 + 35 years would be 2052. Had the DMU portion of Northern's Civity order been smaller it might not have been much of a concern for a 2050 target, but 55 units unable to make any use of electrification... ouch.The 195/196/197 procurements were probably based on a business case of running up to but not past 2049.
It generally seems to be expected that new trains will all have a pantograph (or be easy to retro-fit), but has the Government actually introduced a law to ban procurement of new stock without them? TfW have been rumoured to be looking to obtain additonal stock and I hope that won't mean ordering more 197s.Every order of new stock now has to have a pantogragh.
Well the obvious excuse is that it was much cheaper, faster and more useful to order more of the same, rather than 3 one-off units. We'd be in even more of a mess without the additional units given the state of the fleet.Instead, again if Wikipedia is correct, Northern ordered an additional 3x 3-car 195s in November 2018. No excuses there
Surely they could have added electric/battery hybrid 331s instead of additional 195s?Well the obvious excuse is that it was much cheaper, faster and more useful to order more of the same, rather than 3 one-off units. We'd be in even more of a mess without the additional units given the state of the fleet.
Compared to environmental issues, I'm relatively uninterested in the financial elements of business cases; but I think both sides can be rather inconvenient to the other at times. Financial waste is one thing, but I'm even more concerned about the wasted energy of producing materials for significant components (like bodyshells) only to scrap them more often than necessary.
Yes, IEP is (or at least was expected to be) a 27.5 year contract (or several). However, if I understand correctly those deals are not with Hitachi but with two consortiums (Agility Trains East for the ECML fleet and Agility Trains West for the GWML operations) and included a whole load of stuff such as maintainance (and possibly even financing) which would normally be handled by ROSCOs. I'm fairly sure that there have been new EMU contracts in the last 10-15 years or so 35-40 year lifespans and, in the early 1980s, BR were antincipating that hauled coaches and EMUs could last as long as 40 years. Some class 153s and mark 4 stock have been sold by the ROSCOs to TfW/WAG after the previous leases expired and I would expect something similar will happen when the 27.5 year IEP contracts end.
Wikipedia suggests otherwise in the case of the 195s, claiming that "The units were designed with a projected lifespan of 35 years and it was planned they will operate beyond 2050 with maintenance and refurbishment". If Wiki at least has the dates correct, then delivery in 2017 + 35 years would be 2052. Had the DMU portion of Northern's Civity order been smaller it might not have been much of a concern for a 2050 target, but 55 units unable to make any use of electrification... ouch.
The class 196 fleet was a more-sensible size (26 units) for a DMU order given what should have been a rapidlly reducing pool of work for such and (if Wiki is correct) the order being placed in 2017.
Everything (should have) changed in February 2018 when then Minister, Jo Johnson, announced the ambition to remove diesel-only trains by 2040. (by the way, does anyone know if there has been any update on the planned electric/battery hybrid trail on the Windermere branch, which Jo Johnson announced in the same speech)?
Instead, again if Wikipedia is correct, Northern ordered an additional 3x 3-car 195s in November 2018. No excuses there - meeting the 2040 ambition would have given those units barely 20 years service. Similarly, the TfW franchise wasn't awarded until May 2018, so they should have known about the 2040 ambition, giving the units about 15 years use.
It generally seems to be expected that new trains will all have a pantograph (or be easy to retro-fit), but has the Government actually introduced a law to ban procurement of new stock without them? TfW have been rumoured to be looking to obtain additonal stock and I hope that won't mean ordering more 197s.
That depends if CAF were in a position to offer a battery hybrid with sufficient range in 2018, which seems unlikely.Surely they could have added electric/battery hybrid 331s instead of additional 195s?
Surely they could have added electric/battery hybrid 331s instead of additional 195s?
The particulates of a modern diesel engine would be far less than one from the 90s. It's a much more immediate concern to health to people that have to live near them that the no new diesels brigade seem to forgetThat would be preferable to passengers of pacers but it doesn't make that much of a difference to the environment
They weren't on offer. The options were essentially order the additional 3 195s, or nothing.Surely they could have added electric/battery hybrid 331s instead of additional 195s?
Not to mention the fact that as an additional order (possibly even from an option), they could presumably be ordered without tender , whereas any variation as major as passive provision for bi-mode would have required a full tender process (probably with no bids) and an undesirable micro-fleet.Well the obvious excuse is that it was much cheaper, faster and more useful to order more of the same, rather than 3 one-off units. We'd be in even more of a mess without the additional units given the state of the fleet.
They could, and in my view should, have ordered bimodes or trimodes (e.g. 755s, 756s, or even 231s) to replace the retiring like diesel units - these have a long-term future, and were ordered around the same time as the 19x.Ordering 19X class earlier would have just meant retiring some older stock earlier than they were. That would be preferable to passengers of pacers but it doesn't make that much of a difference to the environment if a class is retired in 2015 earlier than necessary or if its successor is in 2049. I wouldn't rely on wikipedia! The 2040 Jo Johnson target has never been a serious target because of the difficulty in decarbonising rural routes. There are enough rural routes to run 19X on until they are life expired. Decarbonising the Cambrian Coast, Settle and Far North lines by X date is driven by ideological purity rather than a meaningful environmental impact on diesel running very rural lines. There isn’t a legal ban on new DMUs but there might as well be because no government minister in the UK will sign off on procuring them. There needed to be another model of DMUs following the Turbostars to bridge the gap to decarbonising most lines and to run rural services in the 2040s (and probably into 250s).
Could they have done? Wouldn't a 756/0 (or even a theoretical "3-car" 231) have been more expensive than even a "197113-126" 197?They could, and in my view should, have ordered bimodes or trimodes (e.g. 755s, 756s, or even 231s) to replace the retiring like diesel units - these have a long-term future, and were ordered around the same time as the 19x.
They could, and in my view should, have ordered bimodes or trimodes (e.g. 755s, 756s, or even 231s) to replace the retiring like diesel units - these have a long-term future, and were ordered around the same time as the 19x.
Could they have done? Wouldn't a 756/0 (or even a theoretical "3-car" 231) have been more expensive than even a "197113-126" 197?